| 1 | Turnkey development work for Planning, Designing, Engineering, Construction & Commissioning of Common Facilities at Deonar Abattoir Complex |
| 2 | Planning, Design, Detail Engineering, Drawing, Project Estimation, Site Survey & Approvals, permissions |
| 3 | Construction, Erection, Commissioning, Installation of Buffalo Lairage (Along with M,E,P& Fire Safety system) TOTAL Pre-Engineering Building (PEB) SHED (1/2/3/4)+Buffalo Daily Market |
| 4 | Construction, Erection, Commissioning, Installation of Other Small Structures (Along with M, E,P & Fire Safety system) |
| 5 | Construction, Erection, Commissioning, Installation of Goat and Sheep Lairage + Daily Market (G+3; RCC & 3Rd Floor PEB) (Along with allied i) MEP works, ventilation etc.ii) Fire Safety systemiii) Provision of minimum 7 nos of Industrial Heavy Duty Goods Lift & minimum 21 nos of Heavy Duty passenger lifts to cater need of exhibition crowd. |
| 6 | Construction, Erection, Commissioning, Installation of Kena Market (Along with M,E,P& Fire Safety system) |
| 7 | Construction, Erection, Commissioning, Installation of Admin Building (Along with allied i) MEP works, ventilation etc. ii) Office Interior & Furnitureiii) Fire Safety systemiv) Provision of Industrial Heavy Duty Goodslifts & Passenger Elevators (minimum 4 nos). |
| 8 | Construction, Erection, Commissioning, Installation of Skill Development center + Hostel Facility (Along with allied i) MEP works, ventilation etc.ii) Office Interior & Furnitureiii) Fire Safety systemiv) Provision of Industrial Heavy Duty Goodslifts & Passenger Elevators (minimum 3 nos). |
| 9 | Erection, Commissioning, Installation of Event Management Building (Along with allied i) MEP works ii) Office Interior & Furnitureiii) Fire Safety systemiv) Provision of Industrial Heavy Duty Goodslifts & Passenger Elevators (minimum 4 nos). |
| 10 | Construction, Erection, Commissioning, Installation of Food Court (Along with M,E,P & Fire Safety system) |
| 11 | Construction, Erection, Commissioning, Installation of Dormitories Trader\"s Block and Toilet (Along with M,E,P & Fire Safety system) |
| 12 | Landscaping, Plantation, Irrigation Setup, Finishing, Maintenance Handover of Garden(Along with M,E,P & Fire Safety system) |
| 13 | Supply, Installation, Testing, Commissioning of HVAC system |
| 14 | Supply, Installation, Testing, Commissioning CCTV system |
| 15 | Supply, Installation, Testing, Commissioning of Motorized Gate |
| 16 | Overhead Tank |
| 17 | Supply, Installation, Testing, Commissioning of Under Ground Water Tank |
| 18 | Supply, Installation, Testing, Commissioning of ROOF TOP Solar system and Operation and Maintenance for 5 years |
| 19 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of Levelling Work |
| 20 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of ---- Roads of 18M,12M & 9M width (Includingand Footpath)(Along with M,E,P & Fire Safety system) |
| 21 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of ----23 Truck Parking- Buffalo Abattoir(Dispatch Exis) ; 10 Truck & 14 Carparking near Rendering Plant, Inspection area, Tensile Covered Parking (9414.3 SQM), Goat & Sheep Daily Market Parking(Along with M,E,P & Fire Safety system) |
| 22 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of ---- SWD n/w |
| 23 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of ---- Existing Nala Channelization |
| 24 | Earthwork, Subgrade Preparation, Construction, Finishing, Handover of ---- Trenches for services |
| 25 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Structure All |
| 26 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Tree Shifting, replantation, trimming, cutting as per approval |
| 27 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Electrical |
| 28 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: High Mast |
| 29 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Inspection Chamber |
| 30 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Light Pole Single |
| 31 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Light Pole Double |
| 32 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Manhole |
| 33 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Light Pole (5) |
| 34 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Existing Building - Structure Removing Work |
| 35 | Demolition, Tree and Utility Shifting - Survey, Assessment, Decommissioning, Disconnection, Dismantling, Demolition, Debris Management, Site Clearance, Environmental Compliance: Existing Building - Dismantling of Roof, GI Sheet |
| 36 | Existing Building - Structure Removing Work extra for Dismantling, for every Height of 1 m beyond 5 Meter |
| 37 | Utility Shifting |
| 38 | ETP System : Planning, Design, Engineering, Supply, Construction, Installation, Testing, Commissioning, Trial Run, Operation and Maintenance for 5 years |
| 39 | BIO Methanization - Planning, Design, Engineering, Supply, Construction, Installation, Testing, Commissioning, Trial Run, Operation and Maintenance for 5 years |
| 40 | Systematic Monitoring and Real Time Technology (SMART) Integration within Complex---- Design, Development, Implementation, Operation, Maintenance and Upgradation for 5 years |