Tender For 33 Kv Line Strengthening Work, 11 Kv Line Strengthening Work & 11 Kv New Line Construction Work On Semi-Turnkey Basis In Business Plan 2025-26 Under The Area Of Edd, Lakhanpur, Agra. - Part-A (Supply Of Material)Holding Clamp For 11 Kv Cross Ar, agra-Uttar Pradesh

Tender Notice

51725027
Tender For 33 Kv Line Strengthening Work, 11 Kv Line Strengthening Work & 11 Kv New Line Construction Work On Semi-Turnkey Basis In Business Plan 2025-26 Under The Area Of Edd, Lakhanpur, Agra. - Part-A (Supply Of Material)Holding Clamp For 11 Kv Cross Ar
Tender
Indian
Uttar Pradesh
Agra
18-10-2025

Tender Details

Tender for 33 KV line strengthening work, 11 KV line strengthening work & 11 KV New line Construction work on Semi-Turnkey basis in Business Plan 2025-26 under the area of EDD, Lakhanpur, Agra. - Part-A (Supply of Material)Holding Clamp for 11 KV Cross Arm 2 Holding Clamp/DP Clamp 3 Cable Holding Clamp 4 Suspension with I Hook 5 Stone Pad (3000x300x75 mm) 6 Number Plate with clamp and Nut & Bolt 7 Danger board with clamp and Nut & Bolt 8 LT Shackle Insulator 9 Alu. Paint 10 Red Oxide Paint 11 Bracing Set (268 Nos.) 12 GI Barbed Wire 13 MS Angle (65x65x6 mm) 14 MS Angle Holding Clamp 15 PG Clamp (Dog to Dog) 16 Nut & Bolt 17 Dead end Clamp 18 33 KV E-Bracket 19 11 KV E-Bracket 20 11 KV F-Bracket 21 Alu. Jointing Sleeves 22 Garurding Angle for 11 KV 23 Top Channel with Nut & Bolt 24 T Complete 25 Dropper Channel 26 T-off Channel with Clamp 27 Part-B (Erection work)Carriage of PCC Pole 8.5 Mtr. Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) 28 Carriage of ST Pole 11 Mtr/13 Mtr Long from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 29 Cartiage of Line Material from Store Center Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.) Line material viz. Clamp for 11 KV V Type Cross Arm (474 Nos.),33 KV Cross Arm V Type (62 Nos.), 33 KV Cross Arm Clamp for Pole (119 Nos.), Polymer Pin Insulator for 33 KV (213 Nos.), 33 KV Pin (213 Nos.), Polymer Pin Insulator for 11 KV (3077 Nos.), 11 KV Pin (2697 Nos.), Stay Set Complete (195 Nos.), MS Earthing Rod (684 Nos.), 33 KV Disc Fitting (10 Nos.), 33 KV Disc Insulator (10 Nos.), 11 KV Disc Fitting (435 Nos.), 11 KV Disc Insulator (435 Nos.), HDPE Pipe (1760 Mtr.), GI Pipe 6 Dia (44 Mtr.), ACSR Weasel Conductor, Dog Conductor, Rabbit Conductor, Raccon Conductor, Insulated Dog Conductor, GI Wire 6 SWG, GI Wire 8 SWG, Stay Rod (55 Nos.), Distribution Box (25 Nos.), 33 KV TPMO (2 Nos.), etc and other line Material as required in Estimate/Package) 30 Cartiage of 33 KV XLPE Cable 3x300 sqmm (250 Mtr,), 11 KV XLPE Cable 3x185 sqmm (3470 Mtr.), 11 KV XLPE Cable 3x300 sqmm (1600 Mtr.), ABC 3x120 sqmm (3350 Mtr.), ABC 3x95 sqmm (380 Mtr.) from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 31 Cartiage of 11 KV VCB from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 32 Cartiage of 33 KV Cable Jointing Kit 3x300 sqmm O/D (02 Nos), 11 KV Cable Jointing Kit 3x185 sqmm O/D (53 Nos.), 11 KV Cable Jointing Kit 3x185 sqmm I/D (27 Nos.), 11 KV Cable Jointing Kit 3x300 sqmm I/D (13 Nos.), 11 KV Cable Jointing Kit 3x300 sqmm O/D (23 Nos.)from store center agra to work site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) 33 Erection and grouting of PCC 8.5 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing ofall accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 34 Erection and grouting of PCC 8.5 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing ofall accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 35 Erection and grouting of ST Pole 11 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing ofall accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 36 Erection and grouting of ST Pole 11 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 37 Erection and grouting of ST Pole 13 Mtr. long Single Pole in 1:2:4 ratio (cement, sand and bricks balast) including fixing ofall accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 38 Erection and grouting of ST Pole 13 Mtr. long (Double Pole) in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories as required clamps, Cross Arm, Insulator etc. including Stone Pad as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 39 Laying sagging stringing binding and jumpering of ACSR Weasel Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 40 Laying sagging stringing binding and jumpering of Dog Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 41 Laying sagging stringing binding and jumpering of Rabbit Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 42 Laying sagging stringing binding and jumpering of Racoon Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 43 Laying sagging stringing binding and jumpering of Insulated Dog Conductor at 33/11 KV Line as per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 44 Laying of 33 KV XLPE Cable3x300 sqmm (Double Ckt.) in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc. complete work as RESPO norms as per RESPO Norms anddirection by superivising Engineer. 45 Laying of 11 KV XLPE cable 3x300 sqmm in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms. 46 Laying and stringing of ABC 3x120 sqmm/ABC 3x95 sqmm over existing Poles incluing fixing of suitable clamps, suspention arrangement winding, sagging, tightning and all other accessories required for propper completion work as per RESPO norms. 47 Laying of 11 KV XLPE cable 3x185 sqmm in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. bricks in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms. 48 Laying of 11 KV XLPE cable 3x185 sqmm excavation of trench of size 750 mm deep x 300 mm wide in all type of soil for laying under ground cable including backfilling and leveling etc. complete work as RESPO norms and direction by supervising engineer. 49 Laying of 11 KV XLPE cable 3x185 sqmm (Double Circuit)Through H.D.P.E.pipe by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill machine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. 50 Laying of 11 KV XLPE Cable3x185 sqmm through GI Pipe as per RESPO Norms anddirection by superivising Engineer. 51 Installlation & Commissioning of 11 KV VCB Panel Complete with foundation, alignment,earthing, termination with all accessories as required at site as per RESPO Manual and direction by Supervising Engineer. 52 febrication and erection of 33 KV TPMO structure Includingcutting, welding, drilling, Bolting of MS Channel/Angle Sections fixing of structure in position with propper alignment, grouting in PCC/RCC Foundation, applying one coat of red oxide and two coat of alu. paintfor proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 53 Installtion, Testing & Commissioning of 33 KV TPMO on newly erected existing structure including all accessories fixing arrangement, earthing, alignment and making propper electrical connections as per respo norms and direction by supervising engineer. 54 Filling of 33 KV Jointing Kit 3x300 sqmm OD and making connection as per direction by supervising engineer. 55 Filling of 11KV Jointing Kit 3x185 sqmm ID/OD and making connection as per direction by supervising engineer. 56 Filling of 11KV Jointing Kit 3x300 sqmm ID/OD and making connection as per direction by supervising engineer. 57 Erection and grouting of stay set complete ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 58 Erection of Stay Rod including excavation of pit, fixing of Rod with anchor plate in proper alignment backfilling, raming and compacting th soil and tightning with stay wire and insulator as per respo norms and direction by supervising engineer. 59 Fixing of MS Earthing Rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 60 Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6/8 SWG including fabrication and fixing of guarding angle with holding clamps and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. 61 Concreting of Support PCC/ST Pole including the cost of arrangement of required material, labour, T&P etc for proper completion of work. 62 Concreting of Stay including the cost of arrangement of required material, labour, T&P etc for proper completion of work. 63 Erection of Suspension with I Hook including fixing in existing structure, Proper alignment, tightining and all required accessories as per respo norms and direction by supervising engineer. 64 Fixing of T Complete as per respo norms and direction by supervising engineer. 65 Fixing of T off channel with clamp as per respo norms and direction by supervising engineer. 66 Fixing of E-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer. 67 Fixing of E-Bracket for 33 KV as required on Poles as per RESPO norms and direction by supervising Engineer. 68 Fixing of E-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer. 69 Fixing of F-Bracket for 11 KV as required on Poles as per RESPO norms and direction by supervising Engineer. 70 Fixing of GI Barbed Wire as required on Poles as per RESPO norms and direction by supervising Engineer. 71 Fixing of MS Angle (65x65x6 mm) as required on Poles as per RESPO norms and direction by supervising Engineer. 72 Fixing ofP.G. Clamps (Dog to Dog) as per RESPO norms 73 erection of Bracing Set including lifting, positioning, alignment, bolting and tightning of all accessories complete in all respects as per RESPO norms and direction by supervising engineer. 74 Fixing of Danger Boards With clmap and Nut & Bolt(shock Proof, Rust Proofs) on Poles as per RESPO norms. 75 Fixing of Number plates on Poles as per RESPO norms. 76 Fixing of Al. Jointing Sleeves as per RESPO norms and direction by supervising engineer. 77 Fixing of Nut & Bolt as per RESPO norms and direction by supervising engineer. 78 Surface Preparation for Painting on ST Poles including cleaning, sanding and single coat of Red Oxide Paint as per RESPO norms and direction by supervising engineer. 79 Surface Preparation for Painting on ST Poles including cleaning, sanding and double coat of Alu. Paint as per RESPO norms and direction by supervising engineer. 80 Fixing of distribution box including necessary supports, clamps, nuts & bolts leveling, alignment and termination of Incoming and outgoing cables earthing connections to DB frame including lugs, ferrules, gland etc. as per norms and direction by supervising engineer. 81 Removal of old & Used weasel conductor and receive back to store center agra from work site along with loading unloading both ends (approx 50 to 70 km.).

Key Value

Document Fees
INR 3540 /-
EMD
INR 100000.0 /-
Tender Value
INR 98.96 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail