Tender For Construction Of Lined Field Channel In Sunagar Catchment , P.S. K. Patan, Distt. Bundi; 1 Double levelling with auto level, for transfer of bench mark, recording levels at 30 meter interval and marking temporary bench mark at suiatble location. Level book, bench mark value and location and plotting of the survey data is to be submitted to the department. 16.8.3 In plain area (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page No. 76 Ch. XVI Item 8 (c)) 2 16.2 Construction of Pucca bench mark muttam of size 30x30x75 cm in cement concrete (1:3:6) with maximum aggregate size of 40 mm with 75 cm long MS angle , size 25x25x5 mm embedded including curing transportation and fixing at site etc. complete with all leadsandlifts. (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page No. 75 Ch. XVI Item 2) 3 Survey 16.20.2 Survey of existing command area / command area to be developed with total station instrument at 30m grid or at nearer interval as per requirement of site and plotting of contours at 10 cm interval on Shajra map, planning of water cource for OFD works and preparation of L-section of WC and drawings of Nakka point, CD works etc.. Preparation of Chak planning booklet showing Khasra list with details of beneficiaries forandCCA/ICA and Chak plan showing WC alignment, Nakka Point etc. complete in all respect including all ancillary works as described in specifications and conditions of contract. (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page No. 78 Ch. XVI Item 16 (b)) 4 Cuttingandclearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-incharge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. 18.01.1 Ordinary (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page No. 86 Ch.XVIII Item 1(a) 5 Excavation including loading, unloading, disposal and dressing of excavated earth withininitial lead of 50 m and lift upto 1.5 m including dressing of excavated area and dewatering wherever required complete in all respect 5.1.0.2Hard / dense s (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page no. 13 Ch. V part A item 1(b)) 6 9.36 Providing and laying 75mm thick sand layer in bed (over clays sub grade) duly stabilized with cement slurry (1:20) including all leads and lift of material.. (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023),Ch. IX Part B Item 36, Page No. 33) 7 9.9 (d) Providing and Laying in position of Cement concrete Nominal mix(1:4:8) including leads of all construction materials, curing,compaction and finishing with rendering incement sand mortar 1:3(1 cement :3 coarse sand) and making good the joints excluding the costof centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto; 20 mm (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. IX Part A Item 9 (d),page no. 28) 8 9.7.4 Providing and Laying in position of Cement concrete Nominal mix (1:2;4) including leads of all construction materials, curing, compaction and finishing with rendring in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. IX Part A Item 6 (d),page no. 28) 9 10.01.1 Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. ( non -suspended horizontally laid mass concrete) (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. XItem 1(a) Page No. 34) 10 Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. 10.09.2.2 Tor or ribbed bars (IS :1786-1985) (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. XItem 9 (b-ii) Page No. 35) 11 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn andneatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 18.28.1 300 mm 18.28.1.13 NP-3 (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. XVIII Item 28 (d), Page No. 88) 12 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn andneatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. Note: Non ISI mark pipe but manufactured as per ISI deduct 20%.NP2 NP3 NP4 18.28.2.4 300 mm Labour charges only(WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Ch. XVIII Item 28 (d), Page No. 88) 13 Re-handing of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-wateringwherever required and all applicable taxes and levies etc. complete in all respect 5.8.1Earth / Soil (WRD BSR 2023 KOTA ZONE (EFF. FROM 14.08.2023), Page No. 14 Ch.V Part A Item 8(a))