| 1 | Name Of Work:- 01.constructing Under Ground RCC Gutter Line (Honrav House to Near Kambale House) @ Zare (Kambale Gulli) . Tal.:- KarmalaDist. Solapur Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M)For 200 mm RCC NP 2 Pipe |
| 2 | Item No. 2:- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt roadincluding removing the excavated material up to a distance of 50 metersand lifts as below, stackingand spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto0 to 1.5 M) |
| 4 | Item No. 4 :- Excavation for foundation/pipe trenches in hard rock and concrete road by chiselling, wodging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed,removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc, complete by all means. (Rd-A-6/259) |
| 5 | Item No. 5:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 6 | Item No. 6 :-Providing ISI standard RCC Pipes in standard lengths of following class & dia. Suitable for either coller joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. NP2 TYPE RCC 300 mm PIPE |
| 7 | Item No. 7 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP2 TYPE RCC 300mm PIPE |
| 8 | Item No. 8 :- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCC Size Of a Chamber 0.6x0.45x0.90 |
| 9 | Item No.9 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 10 | Item No. 10 :- Providing and laying in situ Cement Concrete M-15 of trap granite/quartzite gneiss metal for foundation and bedding including hailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 hags/cum) |
| 11 | 18 %GST |
| 12 | Name Of Work:- 02.constructing Under Ground RCC Gutter Line (Kambale House to Near Rohidas Maharaj Tempel) @ Zare (Kambale Gulli) . Tal. karmalaDist. SolapurItem No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M)For 200 mm RCC NP 2 Pipe |
| 13 | Item No. 2:- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 14 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt roadincluding removing the excavated material up to a distance of 50 metersand lifts as below, stackingand spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto0 to 1.5 M) |
| 15 | Item No. 4 :- Excavation for foundation/pipe trenches in hard rock and concrete road by chiselling, wodging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed,removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc, complete by all means. (Rd-A-6/259) |
| 16 | Item No. 5:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 17 | Item No. 6 :-Providing ISI standard RCC Pipes in standard lengths of following class & dia. Suitable for either coller joints or rubber ring joints, excluding GST levied by GOI & GOM in all respect including inspection charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. NP2 TYPE RCC 300 mm PIPE |
| 18 | Item No. 7 :- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. NP2 TYPE RCC 300mm PIPE |
| 19 | Item No. 8 :- Providing and constructing B/B masonary Valve Chamber with 15 cm thick 1:3:6 proportion PCC bedding additoinal excavaton B.B. masonary in CM 1:5 cm thick precast RCC Size Of a Chamber 0.6x0.45x0.90 |
| 20 | Item No.9 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 21 | Item No. 10 :- Providing and laying in situ Cement Concrete M-15 of trap granite/quartzite gneiss metal for foundation and bedding including hailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 hags/cum) |
| 22 | 18 %GST |