Work related to issuing various connections and shifting etc. on LT and HT lines approved under the deposit scheme item in the jurisdiction of Electricity Distribution Subdivision Greater Noida under VVK Greater Noida. - CONSTRUCTION OF NEW LINE FOR RELEASING OF NEW CONNECTION. 2 Carriage of Distribution box(Single Phase/Three Phase) from Store Center Sahibabad to work site including safe loading and unloading at both ends and Installation of Distribution Box with Clamp and Nut, Bolts and Washer. (Distribution Box will be provided by the deptt. and Clamp, Nut, Bolts and Washer in the scope of Contractor.) 3 Carriage ofNew 8.5mt./9mtr/11Mtr. Long PCC pole from Any Store of PVVNL Discom/Central Store, Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloading at both ends. 4 Carriage ofNew 9Mtr, 11mtr, 13mtr. Long STP from Any Store of PVVNL Discom/Central Store, Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloading at both ends. 5 Carriage and Fixing ofline accessories, Double pole accessories on pole i.e. Cross arm, M.S channel, Angle,V Disc Insulator with fitting,Pin Insulator with pin, Dropper channel, Stay Set, Earthing Complete, Fuse Set, T-off Channel, T/F Base Angle etc. (any other items mentioned in Estimate issued from Store) as required for complete the work. 6 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, F bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required for Single Pole as following : 7 Single support on ST Pole 9/11/13Mtr. Long 8 Single support on PCC Pole 8.5/9/11Mtr. Long 9 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, E bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule.Double Pole Structures by 30 Nos. PCC Poleand 10 Nos. ST Pole . 10 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. The work are as Follows : 11 S.T pole 11/13Mtr. Long 12 8.5/9 Mtr PCC Poles. 13 Fixing of Stay set complete (G.I.Stay rod 16x1800mm, Stay wire 5Kg, Guy insulator, G.I.Stay clamp, bolt, nut & wasther) for LT/11KV/33KV line with Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps with Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc. 14 Driving of MSearth rod of size20x2500 mm in earth andjointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. 15 Cartage and Laying lifting, stringing & proper sagging of 4/5 phases ACSRconductor (LT/HT) in accordance with Line chart includidng binding and fixing of all accessories in Conductor in parallel as per site requirement for New conductor on H.T/L.T line for New Connection to Consumer with binding, jumpering etc.including complete connections in all respect,from any Store Centre of PVVNL to work site including safe loading and unloading at both ends. 16 ACSR Dog Conductor. 17 ACSRWeasel Conductor. 18 ACSRRabbit Conductor. 19 Carriage ofnew LT ABC cable 50/70/ 95/120 Sqmm from any Store Centre of PVVNL Discom to work site including safe loading and unloading at both ends with laying, lifting ofsagging of AB cable with fixing of all types clamps & connection with complete work in all respect. 20 size 50/70 sqmm 21 size 95/120 sqmm 22 Carriage of 3x50/70/120/185/220/385/300 sqmm LT/11KV/33 KV XLPE cable from any Store Center sector 20,Noida/J.E Store/Ghaziabad/Any Store of PVVNL Discom to work site, loading & unloading both side withLaying,Hosting and comissioning of LT/11KV/33KV XLPE Double Ckt./SINGLE CKT. by manual method or Trenchless method by digging of trench of size 750 mm wide 1050 mm deep and boxing with brick by three sides, sand, stone slab 600x450x50mm & providing and Fixing of HDPE Pipe as per site requirement and its required filling of trench, leveling and proper rooming . 23 Preparation, Fixing and Commissioning of 11/33/LT KV Power Cable ends:Fixing, Commissioningof 11/33KV/LT KV XLPE Heat shrinkable outdoor/Indoor jointing kits/Straight Through Box suitable for different HT/LT XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. 24 Carriage & Installation and Commissioning of 11/0.4 KV, 10/25/63/100/250/400/630/100 KVA Distribution T/F on Plinth/Double Pole/as per site requirement and making of proper Connections with complete work in all respects. 25 Construction of Plinth/Chair and Fencing as per requirement for Distribution Transformer as per RESPO. (All material and work in the scope of Contractor). 26 Body and Neutral Earthing of above Transformer as per Specification. 27 Carriage and Installtion of HT/LT Metering System, CT/PT with Cubicle/BREAKER/VCB with chemical Earthing form Store Noida/Ghaziabad/BSR/Any Store of PVVNL Discomto Site including loading and unloading both sides with mounting on double pole/Meter Room or Plith and making all the connections complete in all respect. 28 Supply, Fixing, Painting and Errection of the Following material by the Contractor on his own cost with complete work in all respect. 29 Different Types of MS Nut & Bolts as per site requirement. 30 Different Types of different types of Alu. Lugs (as per site requirement.) 31 Number Plate 32 Danger Board 33 Suspension Clamp 34 X-Arm Holding Clamps 35 F Clamp / LT Clamp 36 Holding Clamp 37 Pretty Items as required at site. 38 LINE SHIFTING OF LT/HT NETWORK 39 Removal of old and used AB Cable and ACSR Conductor from the both side spans of pole and removal of HT/LT Line accessories from old, damaged, shifted Pole and Carriage of its from work site to JE Store/Any Store Centre of PVVNL Discom including loading and unloading at both ends. 40 Removal of all line accessories from the Pole and Dismentaling of old, Damaged and Shifted ST/PCC Pole by digging of Pole pit in Pakka/Kacha Road with the help of road cutter/digging machine, Tractor etc and Carriage of old and Damaged ST/PCC Pole from work site to JE Store/Any Store Centre of PVVNL Discom including loading and unloading at both ends. 41 Carriage ofNew 8.5mt./9mtr/11Mtr./13 Long PCC and ST Pole from Any Store of PVVNL Discom/Central Store, Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloading at both ends. (STP - 5 Nos. AND PCC 15 Nos. all length of Poles.) 42 Carriage of Single Pole line accessories, Double pole accessories as Cross arm, M.S channel, Angle,V Disc Insulator with fitting,GI Wire, Barbed Wire, Pin Insulator with pin, Distribution Box, Dropper channel, Stay Set, Earthing Complete, Fuse Set, T-off Channel, T/F Base Angle, Termination Kit, Straight Through etc. any other items mentioned in Estimate or material issued from Store as required for complete the work including loading and unloading both ends and Fixing the above accessories on Pole with complete work in all respect. 43 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, F bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required for Single Pole as following : 44 Single support on ST Pole 9/11/13Mtr. Long 45 Single support on PCC Pole 8.5/9/11Mtr. Long 46 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, E bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule.Four Pole, Three Pole, Double Pole Structures of PCC and ST Pole . 47 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. The work are as Follows :Single Pole, Double Pole, Three Pole, Four Pole. 48 S.T pole 9/11/13Mtr. Long 49 8.5/9/11 Mtr PCC Poles. 50 Fixing of Stay set complete (G.I.Stay rod 16x1800mm, Stay wire 5Kg, Guy insulator, G.I.Stay clamp, bolt, nut & wasther) for LT/11KV/33KV line with Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps with Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc. 51 Driving of MSearth rod of size20x2500 mm in earth andjointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. 52 Cartage and Laying lifting, stringing & proper sagging of 4/5 phases ACSRconductor (LT/HT) in accordance with Line chart includidng binding and fixing of all accessories in Conductor in parallel as per site requirement for New conductor on H.T/L.T line for New Connection to Consumer with binding, jumpering etc.including complete connections in all respect,from any Store Centre of PVVNL to work site including safe loading and unloading at both ends. 53 ACSR Dog Conductor. 54 ACSRWeasel Conductor. 55 ACSRRabbit Conductor. 56 Carriage ofnew LT ABC cable 50/70/ 95/120 Sqmm from Store Centre, Sahibabad to work site including safe loading and unloading at both ends with laying, lifting and sagging of ABC cable and fixing of all types clamps & connection with complete work in all respect. 57 size 50/70 sqmm 58 size 95/120 sqmm 59 Shifting of11/0.4 KV, 10/25/63/100/250 KVA/400/630/1000 KVA T/F from the site and Re-Installation of same T/F at Proposed site including loading and unloading the T/F on Plinth/Double Pole/as per site requirement with proper connections and complete work in all respects. 60 Shifting of Metering System and CT/PT with Cubicle/BREAKER/VCB From the site and RE-Installation of same System at proposed site including loading and unloading both sides with mounting on double pole/Meter Room or Plith and making all the connections complete in all respect. 61 Re-Sagging and Re-Laying of Loose/Shifted LT/HT line of ACSRConductor with complete work properly as per RESPO. (1Span - 40Mtr) 62 Re-Sagging and Re-Laying of Loose/Shifted LTline of AB Cable with complete work properly as per RESPO.(1Span - 40Mtr) 63 Tree Cutting in way of HT/LT Line in the areas of EUDD-VIII, Jewar by Boom Barrier Machine.(1Span - 40Mtr) 64 Tigtening & Re-winding of jumpering by ACSR Conductor as per site requirement with complete work in all respect. 65 Supply, Fixing and Errection of the Following material by the Contractor on his own cost. 66 Different Types of MS Nut & Bolts as per site requirement. 67 Pretty Items as required at site.