Tender For Work Related To Issuing Various Connections And Shifting Etc. On Lt And Ht Lines Approved Under Deposit Scheme Item In The Jurisdiction Of Vnvk-3, Noida. - CONSTRUCTION OF NEW LINE FOR RELEASING OF NEW CONNECTION UNDER EDD EUDD-3 NOIDA. 2 Carriage of Distribution box(Single Phase/Three Phase) from Store Center Sahibabad to work site including safe loading and unloading at both ends and Installation of Distribution Box with Clamp and Nut, Bolts and Washer. (Distribution Box will beprovided by the deptt. and Clamp, Nut, Bolts and Washer in the scope of Contractor.) 3 Carriage ofNew 8.5mt./9mtr/11Mtr. Long PCC pole from Any Store of PVVNL Discom/Central Store,Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloadingat both ends. 4 Carriage ofNew 9Mtr, 11mtr, 13mtr. Long STP from Any Store of PVVNL Discom/Central Store,Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloading at both ends. 5 Carriage and Fixing ofline accessories, Double pole accessories on pole i.e. Cross arm, M.S channel, Angle,V Disc Insulator with fitting,Pin Insulator with pin, Dropper channel, Stay Set, Earthing Complete, Fuse Set, T-off Channel, T/F Base Angle etc. (any other items mentioned in Estimate issued from Store) as required for completethe work. 6 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all Nut bolt & washer and other accessories.for Single Pole as following : 7 Single support on ST Pole 9/11/13Mtr. Long 8 Single support on PCC Pole 8.5/9/11Mtr. Long 9 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer and other accessories.Double Pole Structures of PCC Poleand ST Pole . 10 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level withC.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling andproper ramming. The work are as Follows : 11 S.T pole 11/13Mtr. Long 12 8.5/9/11 Mtr PCC Poles. 13 Fixing of Stay set complete (G.I.Stay rod 16x1800mm, Stay wire 5Kg, Guy insulator, G.I.Stay clamp, bolt, nut & wasther) for LT/11KV/33KV line with Fixing, tightening & nozzling of stay wire withfixing of Stay Insulators of11KVandStayClampswithGroutingofstayrods includingallworkofexcavation,cementconcreteIncluding back filling of soil and proper ramming etc. 14 DrivingofMS earthrodofsize 20x2500mminearthand jointingthroughG.I.wireof6SWGbetweensupport and earth electrode by providing proper size of bolts and nuts for pole earthing. 15 Cartage and Laying lifting, stringing & proper sagging of 4/5 phases ACSRconductor (LT/HT) in accordance with Line chart includidng binding and fixing of all accessories in Conductor in parallel as per site requirement for New conductor on H.T/L.T line for New Connection to Consumer with binding, jumpering etc.including complete connections in all respect,from any Store Centre of PVVNL to work site including safe loading andunloading at both ends. 16 ACSR Dog Conductor. 17 ACSRWeasel Conductor. 18 ACSRRabbit Conductor. 19 Carriage ofnew LT ABC cable 50/70/ 95/120 Sqmm from Store Centre, Sahibabad to work site including safe loading and unloading at both ends with laying, lifting ofsagging of ABC cable and fixing of all types clamps &connection with complete work in all respect. 20 size 50/70 sqmm 21 size 95/120 sqmm 22 Guarding of LT AND HT Line by G.I. Wire as per RESPO. 23 Guarding of Pole for safety upto 7feet by Barbed wire as per RESPO. 24 Carriage of 3x50/70/120/185/220/385/300 sqmm of LT/11KV/33 KV XLPE cable from any Store Center sector 20,Noida/J.E Store/Ghaziabad/Any Store of PVVNL Discom to work site, loading & unloading both side with Laying, Looping, sagging and comissioning ofXLPE Cable in Double Ckt./SINGLE CKT. by manual method after digging trenchof dia 220 mm in two parallel bores for Double Curcuit/Single circuiit by manual method at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground levelfor laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and Providing & Laying of Ist Class Bricks, along the length on both side ofXLPE Cable in Cable Trench (minium18No.Bricks/MtrperCable)andStoneSlabofsize450x600x50mmontopoftheeachCable, Providing150thickness mmRiver sandfor cushionbeneathand150mm abovethecableandBackfillingof excavated earth in the cable trench upto the ground level and ramming properly with making of double pole riser and complete work in all respect. 25 Carriage of 3x50/70/120/185/220/385/300 sqmm of LT/11KV/33 KV XLPE cable from any Store Center sector 20,Noida/J.E Store/Ghaziabad/Any Store of PVVNL Discom to work site, loading & unloading both side with Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop and making risers at double pole and re-filling of pits in proper manner with required material at kacha/pakka and hot mix road and Laying and comissioning of LT/11KV/33KV XLPE Double Ckt./SINGLE CKT. by Drilling of dia 220 mm in two parallel bores for Double Curcuit by trenchless method by horizontal boring machine at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level with Providing of HDPE Pipe (PVVNL GTP APPROVED HDPE PIPE SHALL BESUPPLIEDWITHINSPECTION.)aspersiterequirementandLayingof HDPEPipediabyHDD trenchlessmethodfor XLPEcableasper siterequirement.Layingand commissiongofXLPECableDouble Ckt.inHDPEPipediaafterdiggingHDDtrenchlessmethod boringincludingcompleteconnectionsat bothends after providing and crimping of lugs of proper size for completion of work.as per site requirement. 26 Preparation of 11/33/LT KV Power Cable ends:Makingof11/33KV/LTKVXLPEHeatshrinkableoutdoor/Indoorjointingkits/Straight Throughsuitablefor different HT/LT XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper sizegoodqualitylugswithcompleteconnentioninallrespect.(KITSSHALLBEPROVIDEDBYTHE DEPTT. AND WORK IN THE SCOPE OF CONTRACTOR) 27 Carriage & Installation and Commissioning of 11/0.4 KV, 25/63/100/250/400/630/100 KVA Distribution T/F on Plinth/DoublePole/aspersiterequirementandproviding&fixingofLugsandmakingofL.T.andHTConnections with complete work in all respects. 28 Construction of New Plinth of Distribution Transformers as per RESPO with complete work in all respects. 29 Construction of new distribution 25/63/100/250 KVA T/F Chair. The size of chair shall be 2 Mtrs. long, 2 Mtrs. wide and height 1.5 Mtrs. from ground level complete in all respects as per RESPO schedule. 30 Construction of New Fencing of Distribution Transformers as per RESPO with complete work in all respects. 31 Chemical Earthing of above newly installed Distribution Transformer. 32 Neutral and Body Earthing of above newly installed Distribution Transformer. 33 Carriage and Installtion of Metering System and CT/PT with Cubicle/BREAKER/VCB form Store Noida/Ghaziabad/BSR/Any Store of PVVNLDiscomtoSite includingloading andunloading bothsides withmounting on double pole/Meter Room or Plith and making all the connections complete in all respect. 34 Supply, Fixing, Painting and Errection of the Following material by the Contractor on his own cost. 35 Different Types of MS Nut & Bolts as per site requirement. 36 Number Plate 37 Danger Board 38 Red Oxide Paint & Aluminium Paint 39 Suspension Clamp 40 Piercing Clamp 41 F-Brackets 42 F Clamp 43 Holding Clamp 44 J Hook for Suspension 45 4x25sqmmXLPE Armoured Cable with laying for new connection upto 25KW 46 LINE SHIFTING OF LT, HT AND OTHER EQUIPMENTS IN DEPOSITE HEAD 47 Removal of old and used AB Cable and ACSR Conductor from the both side spans of pole and removal of HT/LT Line accessories from old, damaged, shifted Pole and Carriage of its from work site to JE Store/Any Store Centre of PVVNL Discom including loading and unloading at both ends. 48 Removal of all line accessories from the Pole and Dismentaling of old, Damaged and Shifted ST/PCC Pole by digging of Pole pit in Pakka/Kacha Road with the help of road cutter/digging machine, Tractor etc and Carriage of old and Damaged ST/PCC Pole from work site to JE Store/Any Store Centre of PVVNL Discom includingloading and unloading at both ends. 49 Re-Straightening of Tilted ST/PCC Pole after digging of Pit at Kaccha/Pakka Road of suitable size adjustment of PCC/ST Poles with proper grouting as per norms and complete work in all respect. 50 Repairing of broken/badly damaged/Rusted/Coroded S.T Poles (damaged at ground level) in existingH.T/L.T lines due to extra ordinary rusting & scaling. From bottom side welding of 4/5 pieces( approx 75 cm. long) of angle iron of size 50x50x6 mm. Ist of all digging of pit around the pole of size 1.0 mtr. x 1.0 mtr. x 1.0 mtr. is to be done and then cleaning of rust & de-scaling with the help of hard wire brush & chisel and then MS angle iron of size 50x50x6 mm in 4/5 pcs. of required length as per site requirement varying from 70 cms to 75 cm to cut down and then to be welded with the healthy top and bottom portion of the pole with Ist class electric welding with own welding generator set in such as way that on top of bottom potion over-lapping of healthy part is covered 200 mm length approx. before welding the poles where top & bottom portion are separated, the same are to be kept in alignment safely & after completing the above work, the pit should be refilled. Concreting of S.T Pole for grouting (0.285 cu mt.) cement, stone blast) Making plinth of above repaired ST pole in round shape of height 0.30 meters from ground level having outer dia of 500 mm size in CC 1:3:6 in cement, sand , Stone ballast etc.and completer the work in all respect as per RESPO. 51 Carriage ofNew 8.5mt./9mtr/11Mtr./13 Long PCC and ST Pole from Any Store of PVVNL Discom/Central Store, Shaibabad/Sector 20, Noida/J.E Store to work site including safe loading and unloading at both ends. (STP- 40 Nos. AND PCC 10 Nos. all length of Poles.) 52 CarriageofSinglePolelineaccessories,DoublepoleaccessoriesasCrossarm,M.Schannel,Angle, V Disc Insulator withfitting, GI Wire,BarbedWire, PinInsulator withpin, DistributionBox, Dropper channel, Stay Set,EarthingComplete, FuseSet, T-off Channel, T/FBase Angle,Termination Kit,Straight Throughetc. any otheritemsmentionedinEstimateormaterialissuedfromStoreasrequiredforcompletetheworkincluding loading and unloading both ends and Fixing the above accessories on Pole with complete work in all respect. 53 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all Nut bolt & washer and other accessories.for Single Pole as following : 54 Single support on ST Pole 9/11/13Mtr. Long 55 Single support on PCC Pole 8.5/9/11Mtr. Long 56 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer and other accessories.Four Pole, Three Pole, Double Pole Structures of PCC and ST Pole . 57 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level withC.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming. The work are as Follows :Single Pole, Double Pole, Three Pole, Four Pole. 58 S.T pole 9/11/13Mtr. Long 59 8.5/9/11 Mtr PCC Poles. 60 Fixing of Stay set complete as per site requirement. 61 DrivingandFixingof MS earth rodof size 20x2500 mm in earthandjointingthrough G.I.wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. 62 Cartage and Laying lifting, stringing & proper sagging of 4/5 phases ACSRconductor (LT/HT) in accordance with Line chart includidng binding and fixing of all accessories in Conductor in parallel as per site requirement for New conductor on H.T/L.T line for New Connection to Consumer with binding, jumpering etc.including complete connections in all respect,from any Store Centre of PVVNL to work site including safe loading andunloading at both ends. 63 ACSR Dog Conductor. 64 ACSRWeasel Conductor. 65 ACSRRabbit Conductor. 66 Carriage ofnew LT ABC cable 50/70/ 95/120 Sqmm from Store Centre, Sahibabad to work site including safeloading and unloading at both ends with laying, lifting and sagging of ABC cable and fixing of all types clamps & connection with complete work in all respect. 67 size 50/70 sqmm 68 size 95/120 sqmm 69 Shifting of11/0.4 KV, 25/63/100/250 KVA/400/630/1000 KVA T/F from the site and Re-Installation of same T/F at including loading and unloading the T/F on Plinth/Double Pole/as per site requirement and providing & fixing of Lugs & copper L-piece (04 No.) of size 400x50x6mm and making of L.T.Connections with completework in all respects. 70 Shifting ofLT Feeder Panel Box from the site and Re-Installation of same at different site with proper grouting including loading and unloading and making of Connections with complete work in all respects. 71 ShiftingofLT/HTMeteringSystem,CT/PTwithCubicle,BREAKER,VCBETC.FromthesiteandRE- Installation of same System at proposed site including loading and unloading both sides with mounting on doublepole/Meter Room or Plith and making all the connections complete in all respect. 72 Re-Sagging of Loose LT/HT line of ACSRConductor and complete work properly as per RESPO. 73 Re-Sagging of Loose LTline of AB Cable and complete work properly as per RESPO. 74 Tigtening& Re-windingof jumperingby ACSRConductor asper siterequirement withcomplete workin allrespect.