Tender For Widening And Strengthening Work Of Nh-135A Pali Bazar To Gutwan Tak Road (Odr) In District Jaunpur - Excavation for road work in soil with hydraulic excavator of 1.00 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including all material, T&P, labour cess etc. but excluding G.S.T.) 2 Construction of Embankment with Material Deposited from Roadway Cutting with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST) (Compaction Only) (Including all T&P, labour cess etc. but excluding G.S.T.) 3 Construction of embankment with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 and Diversion(Including all T&P, labour cess etc. but excluding G.S.T.) 4 GSB - Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with motor grader at OMC, and compacting with Soil campactor roller to achieve thedesired density, complete as per MORT&H Technical Specification Clause 401. For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.) 5 Scarifying the existing bituminous surfaceto a depth of 20 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (Including all material, T&P, labour cess etc. but excluding G.S.T.) 6 WMM- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with Soil campactor roller to achieve the desired density. As per Technical Spec. Clause 406 For Widening (Including all material, T&P, labour cess etc. but excluding G.S.T.) 7 Providing and applying primer coat with SS grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means. (Including all material, T&P, labour cess etc. but excluding G.S.T.) 8 Providing and laying 60mm thick dense graded bituminous macadam (Grade-2) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST) (Including all material, T&P, labour cess etc. but excluding G.S.T.) 9 Providing and applying Tack Coat with Bitumen VG-10 using bitumen sprayer at the rate of 0.20 kg per sqm on the prepared surface cleaned by mechanical broom.(Including all material, T&P, labour cess etc. but excluding G.S.T.) 10 Providing and laying 30mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specifications Clause 509 complete in all respects.(Including all material, T&P, labour cess etc. but excluding G.S.T.) 11 Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-35) over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing(Including all material, T&P, labour cess etc. but excluding G.S.T.) 12 Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from R.O.W. with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (without lead) (Including all material, T&P, labour cess etc. but excluding G.S.T.) 13 Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrowpits with all lifts and leads (1000m), transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2In Abadi portion(Including all material, T&P, labour cess etc. but excluding G.S.T.) 14 Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.) 15 RCC Grade M20 Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.) 16 Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications For U-Drain (Including all material, T&P, labour cess etc. but excluding G.S.T.) 17 PART AMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD, Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 18 1st year- maintainance cost 0%on Bituminous Work, CC work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 19 2nd year- maintainance cost 0.25% on Bituminous Work, CC work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 20 3rd year- maintainance cost 0.50 %on Bituminous Work, CC work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 21 4th year- maintainance cost 0.75% on Bituminous Work, CC work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 22 5th year- maintainance cost 1.00 % on Bituminous Work, CC work, Drain etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)