| 1 | Supply Parts OfLT LineBhalakh (Sec. Bassa) |
| 2 | Prov. Steel Tubular Pole (8M) |
| 3 | Prov. RCC Muff with Concerete (Prov by HPSEBL). |
| 4 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 5 | Prov. D.I Iron with Shacke Insulator (Prov by HPSEBL). |
| 6 | Prov. LT Stay Set Comp. (Prov by HPSEBL). |
| 7 | Prov. AAAC 7/3/1.15mm |
| 8 | Prov. Earthing Wire (G.I 8 SWG ) (Prov by HPSEBL). |
| 9 | Prov. Al. Paint |
| 10 | Prov. LT Earthing Set Complete (Prov.HPSEBL) |
| 11 | Prov. LT Stay wire @ 7Kg per set |
| 12 | Supply Parts OfLT Line (Sec. Kothi) |
| 13 | Prov. Steel Tubular Pole (8M) |
| 14 | Prov. RCC Muff with Concerete (Prov by HPSEBL). |
| 15 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 16 | Prov. D.I Iron with Shacke Insulator (Prov by HPSEBL). |
| 17 | Prov. LT Stay Set Comp. (Prov by HPSEBL). |
| 18 | Prov. AAAC 7/3/1.15mm |
| 19 | Prov. Earthing Wire (G.I 8 SWG ) (Prov by HPSEBL). |
| 20 | Prov. Al. Paint |
| 21 | Prov. LT Earthing Set Complete (Prov.HPSEBL) |
| 22 | Prov. LT Stay wire @ 7Kg per set |
| 23 | Supply Parts OfLT Line Triyad (sec Bassa) |
| 24 | Prov. Steel Tubular Pole (8M) |
| 25 | Prov. RCC Muff with Concerete (Prov by HPSEBL). |
| 26 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 27 | Prov. D.I Iron with Shacke Insulator (Prov by HPSEBL). |
| 28 | Prov. LT Stay Set Comp. (Prov by HPSEBL). |
| 29 | Prov. AAAC 7/3/1.15mm |
| 30 | Prov. Earthing Wire (G.I 8 SWG ) (Prov by HPSEBL). |
| 31 | Prov. Al. Paint |
| 32 | Prov. LT Earthing Set Complete (Prov.HPSEBL) |
| 33 | Prov. LT Stay wire @ 7Kg per set |
| 34 | Supply Parts OfLT Line Beddi (Sec. Bassa) |
| 35 | Prov. Steel Tubular Pole (8M) |
| 36 | Prov. RCC Muff with Concerete (Prov by HPSEBL). |
| 37 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 38 | Prov. D.I Iron with Shacke Insulator (Prov by HPSEBL). |
| 39 | Prov. LT Stay Set Comp. (Prov by HPSEBL). |
| 40 | Prov. AAAC 7/3/1.15mm |
| 41 | Prov. Earthing Wire (G.I 8 SWG ) (Prov by HPSEBL). |
| 42 | Prov. Al. Paint |
| 43 | Prov. LT Earthing Set Complete (Prov.HPSEBL) |
| 44 | Prov. LT Stay wire @ 7Kg per set |
| 45 | ErectionParts OfLT Line Beddi /Triyad /Balakh {Sec Bassa) and Sec Kothi. |
| 46 | Erection of 8 Mtr. Steel TublerPolei.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clump, barbed wire, danger plate, drilling of holes and filling of pit + ramming , painting of pole complete in all respect. |
| 47 | Erection of Stay set LT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. |
| 48 | Laying stringing and sagging of AAAC/ACSR/50mm (4Wire) of LT Line laying of conductor,dtringing and sagging binding with insulator making jumper on dead poles etc. complete in all respect (Rate to be quoted in KM) |
| 49 | Mannual carriage of LT Line Materials on steel tubular pole for an average lead of 1KM from road head to site of work i.e 200M (Rate to be quoted in KM) |
| 50 | Loading & unloading of poles & others materials of LT Line |