| 1 | SITC FLOOR MOUNTED AIR HANDLING UNIT (AHU):17600 CFM, 80mm static : Constrcution:GI double skin (45+/- 5 mm) insulated with polyurethane foam (PUF) panels of 42 Kg/cum density sandwitched between, Inner skin 0.8mm GI Plain and Outer skin 0.8 mm GI Pre-coated,completely air-tight, with Thermal brake profile suitable for industrial application.The control wiring and power wiring shall be in the scope of OEM and to be carried out at factory with terminations to Marshelling box.AHU mounted opposed blade aerofoil design low-leakage isolation volume control dampers of Aluminium section with Nylon gears for supply air, return air & fresh air damper for normal operation as applicable for each AHU.AHU should have LED low power consumption light for Fan section. AHU inspection door should have View window with perfectly sealed gaksets on either side to ensure air tightness.AHU shall be provided with door limit switch and also door safety GI guard,Insulated SS drain tray, mixing chambers for return air/fresh air, adequate number of access doors and blank off, flexible connection at fan outlet, vibration isolators for fan + motor assembly, internal coving etc.Fan section:The AHU shall be supplied with AHU blower fans with wall mounted EC PLUG Fan complete with BLDC motor & controller,fan wheel rotor mounted, potentiometer for speed control.The Single or multiple fans shall be considered depending upon the capacity of the AHUs (as mentioned above). Auto/Manual operation starter cum control panel should be supplied along with AHU. EC fan incoming supply to be terminated with MCCB and shall be included in the panel for electrical connection of EC fans.(EBM PAPST/ ZIEHL ABEGG)Coil Scetion:Coil sections with 6-row DX type cooling coil having face velocity not over 500 FPM with hidrophlic coating,UV Emitters with reflectors to be fixed on the coil surface with removable extruded aluminium frames,Cooling coil drain shall be constructed of 18G Stainless steel single skin with 19mm nitrile insulation beneath the pan. No.Of Circuits 4 each of 11 TR capacity with suitable distribution deviceFilter Section: Pre-Filters at FA intake (90% down to 10 Micron), Filter sections with Fine Filters (95 to 99% down to 5 Micron) Approved make : edge tech/zeco/Equivalent. |
| 2 | Supply |
| 3 | Erection |
| 4 | Dismantling existing of AHUs |
| 5 | CONDENSING UNITS:SITC of DX Condensing units to connect AHU complete with condenser coil and Blue fins and R-410A/R-407c refrigerant with expansion valves, Dreir filter & necessary valves of the following Capacities. 4Nos.X 11 TR Condensing units shall be connected to AHU. |
| 6 | Supply |
| 7 | Erection |
| 8 | Refrigerant Hard copper tubing:Supply, laying, testing and commissioning of Suitable size recommended by OEM Hard/Soft copper piping duly insulated with 9mm thick nitrile rubber. |
| 9 | Supply: For AHU & Condensing units |
| 10 | Erection: For AHU & Condensing units |
| 11 | Remote Control units to operate each AHU & Condensing units with communication cable from MCC to AHU /Control unit. |
| 12 | Supply |
| 13 | Erection |
| 14 | Testing and commissioning of above condensing units including N2 Pressure Testing, Vaccum & refrigerant charging i.e. R-407C/R-410Afor itemno 1 & 2 |
| 15 | Supply: For AHU & Condensing units |
| 16 | Erection: For AHU & Condensing units |
| 17 | CPVC DRAIN PIPE:Suitable size Hard CPVC drain piping required for AHU Units with insulated out of class O closed cell elastomeric nitrile rubber material with U trap., bends, clamping, etc. |
| 18 | Supply |
| 19 | Erection |
| 20 | GI Ducting ; Design , supply , installation , testing and commissioning of Factory Fabricated GI Ducting. The scope includes required scaffolding required for erection of GI ducting etc. |
| 21 | Supply: Pre- Insulated Duct:Supply , Installation & Commissioning of SMART PIR Square/Rectangular ducting as per site condition made-up of 25mm thick SMART PIR Panels with 80 micron-embossed aluminium foil on inner inside & 200 micron embossed aluminium foil on the outer side with All Accessories required to joint the preisnulated cut ducts as per desired shapes and boxed at Factory with metal coupler and wrapping and with wire rope supporting. |
| 22 | Erection: Pre insulated duct(Item No. 7.1) |
| 23 | Supply: 22 Gauge with THERMAL INSULATION cross linked polyolefin/ polyethelene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive.Thickness of insulation:25mm. All Insulation joints must covered with Al tape followed by Cello Tape. |
| 24 | Erection: 22 Gauge duct with thermal insulation |
| 25 | Supply: 24 Gaugewith THERMAL INSULATION cross linked polyolefin/ polyethelene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive.Thickness of insulation:25mm. All Insulation joints must covered with Al tape followed by Cello Tape. |
| 26 | Erection: 24 Gauge duct with thermal insulation |
| 27 | Dismantling of existing duct and cut 1x1m and transport to TP Store. |
| 28 | Pre- Insulated Duct:Supply , Installation & Commissioning of SMART PIR Square/Rectangular ducting as per site condition made-up of 20mm thick SMART PIR Panels with 80 micron-embossed aluminium foil on inner inside & 200 micron embossed aluminium foil on the outer side with All Accessories required to joint the preisnulated cut ducts as per desired shapes and boxed at Factory with metal coupler and wrapping and with wire rope supporting. |
| 29 | Supply |
| 30 | Erection |
| 31 | ACOUSTIC INSULATION OF DUCTS : Supply and Laying of Duct Accoustic Insulation applied inside of the duct work with 15mm thick Open cell Nitrile Rubber. Material density is minimum 150 kg/m3 & The material should conform to Class 1 rating duly fixed with adhesive. |
| 32 | Supply |
| 33 | Erection |
| 34 | Supply, Erection & Commissioning of Double Skin 25mm thick PUF Panels for Construction of Plenum Box to be installed on the mouth of AHU\"s |
| 35 | Supply |
| 36 | Erection |
| 37 | CANVAS CLOTH:Supply and Erection Canvas cloth of rexin coated suitable size with zip shall be connected to outlet of AC & Damper. |
| 38 | Supply |
| 39 | Erection |
| 40 | Aluminium SA grills: Supply, Erection & Commissioning of Powder coated extruded aluminum Grills with Collar damper. |
| 41 | Supply |
| 42 | Erection |
| 43 | Aluminium RA grills : Supply, Erection & Commissioning of Powder coated extruded aluminum Grill without collar damper. |
| 44 | Supply |
| 45 | Erection |
| 46 | Damper : Supply, Erection & Commissioning of Volume Control dampers made of GI Frame of 18G & Aero foil Blade of 20G, opossed blade type, blade spindle connected with self lubricated bronze bush, damper is operated by means of lever & falt linkage connected to the spindle, VCD installed on duct along with necessary support & accessories |
| 47 | Supply |
| 48 | Erection |
| 49 | Supply, Erection & Commissioning and balancing of GI NonReturn Dampers with all accessories etc, to complete the job.18G Frame / 20G Blade |
| 50 | Supply |
| 51 | Erection |
| 52 | FIRE DAMPERS:Supply, Erection & Commissioning of (1.5 hour fire rating) conforming to UL 555 S Class 1 duct type motorized smoke & fire dampers complete without sleeves, actuators, control panel, both end shall have flange to connect extenal duct. Status of fire dampers shall be monitored in BMS. Necessary control panels shall be included to take fire signal and close the FD. FDs shall be opened automatically once the fire signal is removed. Smoke & fire damper shall be tested. |
| 53 | Supply |
| 54 | Erection |
| 55 | Supply & Fixing of Actuators |
| 56 | Supply & Fixing of Control panels for Actuators |
| 57 | WIRE MESH: Supply and Erection of Wire mesh and cowl for fresh air |
| 58 | Supply |
| 59 | Erection |
| 60 | STRUCTURAL FABRICATED STEEL WORK: Supply, Fabrication , Cutting, Welding , Erection at site and painting of M. S. Angle structural steel work for required truss, AHU/ODU /Supporting structurer/etec. & as per site requirements, etc. based on the approved drawings. The work should be carried out as per good manufacturing and installation practices in concurrence with approved drawings. The structural steel materials should confirm to IS : 2062 (latest version) as per drawings. All welding electrodes to confirm to relevant IS codes. Fabrication and erection of the structural steel works shall be as per IS: 800 and welding work as per IS:816 and IS: 822. Finally all steel work to be painted with one coat of Red Oxide primer and two coats of epoxy paint. |
| 61 | Supply |
| 62 | Erection |
| 63 | POWER CABLES:Supply, Installation, Testing & Commissioning of BIS Certified FRLS , PVC insulated Armoured Copper Power Cables of suitable ratings/sizes between the distribution board, AHU, ERV and Condensing Units and Interlocking etc., including lugs, crimping and terminations identifying labels duly clamped. |
| 64 | Supply: 3Cx25 Sq.mm Cu cable multistand Armoured FRLSH |
| 65 | Erection:3Cx25 Sq.mm Cu cable multistand Armoured FRLSH |
| 66 | Supply: 4Cx10 Sq.mm Cu cable multistand Armoured FRLSH |
| 67 | Erection:4Cx10 Sq.mm Cu cable multistand Armoured FRLSH |
| 68 | Supply: 4Cx6 Sq.mm Cu cable multistand Armoured FRLSH |
| 69 | Erection:4Cx6 Sq.mm Cu cable multistand Armoured FRLSH |
| 70 | CONTROL CABLES: Supply and Laying of BIS certified PVC insulated Armoured FRLS copper control cable connecting the IDUs and ODUs with conduit. |
| 71 | Supply: 4Cx 1.5 Sq.mm |
| 72 | Erection: 4Cx 1.5 Sq.mm |
| 73 | EARTHING:25x6 mm GI flat laid in open fashion with necessary clamps , screws and interlinks etc for earthing of drives |
| 74 | Supply |
| 75 | Erection |
| 76 | GI Cable Tray: Supply and Installation of Galvanized perforated cable tray below specified sizes, cover to protect the exposed refrigerant pipes and cabling. |
| 77 | Supply: 450 mm widith X 75 mm depth X 1.6 mm thickness |
| 78 | Erection:450 mm widith X 75 mm depth X 1.6 mm thickness |
| 79 | Supply: 200 mm widith X 75 mm depth X 1.6 mm thickness |
| 80 | Erection:200 mm widith X 75 mm depth X 1.6 mm thickness |
| 81 | Supply: 150 mm widith X 50 mm depth X 1.6 mm thickness |
| 82 | Erection:150 mm widith X 50 mm depth X 1.6 mm thickness |
| 83 | CONTROL CUM DISTRIBUTION MCC PANEL: Supply, Erection, Testing and Commissioning of MV control cum distribution panel ( for AHU\"s, condensing units) of Indoor, free standing floor mounting type, 3 ph/415 V 4, wire dust and vermin proof by construction of 14 SWG CRCA sheets, treated with 7 tank process, painted with epoxy powder coating, compartmentalized, modular type with IP 42 Protection.Incomer: 1No - MCCB with ROHM arrangement, 1 Set of Current transformer, 1 No - Digital Multi data Meter with dual reading arrangement for volt, Amps, PF & Energy ,1 Set - LED type RYB indication lamps with control fuses , rated capacity Four Pole control MCB with neutral link.Outgoing:1. 2(1W+1Spare) nos of A H U Motors : Suitable 17600 CFM AHU EC motors with required accessories like breakers, safety protections, indication lamps etc. completeset. 2.6(4W+2Spare) nos of condensing units-11 TR Cap: Multiple feeders for Condensing units with rated/suitable TPNMCCB, suitable TPN Aluminium Bus Bar ( TPN+E Electrolyte grade) and associated accessories as required.The MCC panel shall have 3 spare cubicle one for the AHU and the other 2 for condensing units. Include potential free contacts as and when required. MCC Panel suitable for 1 Nos X 44 TR AHU - 17600 CFM, 4 nos x11TR DX air-cooled condensing units.a.__ TPN SDFU incomer – 1 Nob. __suitable outgoings for condensing units - 6Nosc. __ suitable outgoiungs for blowers - 2Nos. d.---- LED type RYB indication lamps on line side of Incomer with MCB – 1setElectrical control panel comprising starters for AHUs and control of condensing units . Including stategic control system. |
| 84 | Supply |
| 85 | Erection |
| 86 | PCC CIVIL WORKS:Plain Cement Concrete (P.C.C) 1:1.5:3 by insitu mixing using Weigh Batching or RMC of Grade M-20 using Ordinary Portland Cement(OPC) conforming to IS 269 or Portland Pozzolana Cement (PPC) conforming to IS 1489 Part-1 with Minimum Cementitious Content not less than 320 Kg/Cum (M/s. ACC,Ultra Tech, Raasi, Birla, Coromandal, Andhra Cements Ltd. make) with crushed stone sand and graded stone aggregates of 20mm maximum size at all depths/heights below/above plinth level including consolidation, finishing smooth/broom finish as applicable, curing, etc., Wall breaking, closing, plastering etc to run duct as per site required and complete as specified and directed. |
| 87 | Supply |
| 88 | Erection |