}

Tender For Repairing Of Link Road Gonda Bahraich Marg 6 Km To Padari Shankar. - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20 Cm (8, mandi-Uttar Pradesh

Tender Notice

51692188
Tender For Repairing Of Link Road Gonda Bahraich Marg 6 Km To Padari Shankar. - Earthwork In Cutting Or In Embarkment In Ordinary Soil, Excavationto Be In Theform Ofregularpitsnot Exceedingi/2 Metre(20Gin Deptkand Earthwork In Embankmentto Be In 20 Cm (8
Tender
Indian
Uttar Pradesh
Mandi
23-10-2025

Tender Details

Tender For Repairing Of Link Road Gonda Bahraich Marg 6 Km To Padari Shankar. - Earthwork in cutting or in embarkment in ordinary soil, excavationto be in theform ofregularpitsnot exceedingI/2 metre(20gin deptkand earthwork in embankmentto be in 20 cm (8) layers, including ramming & dressingthe surfaceto requiredlevelsand slopes and also including 1.5 metre (5ffs) liíts and 30m. (100) lead.The earthfrom cuttingto be used in making embankmentor to be depositedas directedby Engineer-in-charee. 2 WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 3 Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. 4 Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. 5 Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Mixal, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. 6 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Mixal. 7 S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 350mm Dia Pipe 8 S/F of signboard as per direction of engineer in charge 9 The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% 10 The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75% 11 The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50% 12 The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25% 13 The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00%

Key Value

Document Fees
INR 2242 /-
Tender Value
INR 9 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail