| 1 | All below item provided by contractor (Basic Rate with Frieght & Insurance Charges to be Quoted by bidder) |
| 2 | Holding clamp forST Pole-Cross arm /ST Pole-Stud Pole |
| 3 | Stone Pad 300x300x75 mm |
| 4 | Earth wire clamp with Bolts & Nuts |
| 5 | P.G. Clamps |
| 6 | Number Plates with clamp, nuts & bolts |
| 7 | Danger Board with clamp for 33 KV |
| 8 | GI Barbed wire (2kg./pole) |
| 9 | Aluminium binding wire- 6 swg (0.5 kg./pole) |
| 10 | Aluminium Paint |
| 11 | Red Oxide Paint |
| 12 | Bolts, Nuts & Washer all sizes |
| 13 | E-bracket |
| 14 | F-bracket |
| 15 | GI Pipe 6\" dia |
| 16 | GI Pipe Holding Clamp |
| 17 | Cable Holding Clamp |
| 18 | Eye Bolt |
| 19 | HDPE pipe 150 mm dia |
| 20 | MS Flat 50x6mm (2.36 Kg./Mtr) (One leg 0.95 Mtr. Long x 8No.) x2 = 15.2 @ 2.36 Kg/Mtr. |
| 21 | 33 KV LA/CT/PT/FS connecting Clamp with Nut& Bolts for Dog/ Panther conductor |
| 22 | MS Plate 200x150x8 mm(12.6 Kg/ Mtr.) |
| 23 | Control Cable 2x2.5 Sq.mm. |
| 24 | Control Cable 4x2.5 Sq.mm. |
| 25 | Chemical earthing GI pipe 50 mm dia 3 mtr long |
| 26 | GI Strip 50x6 mm |
| 27 | Erection, Installation andCommissioning of following items to be done by contractor As per RESPO drawing & Norms |
| 28 | Holding clamp forST Pole-Cross arm /ST Pole-Stud Pole |
| 29 | Stone Pad 300x300x75 mm |
| 30 | Earth wire clamp with Bolts & Nuts |
| 31 | P.G. Clamps |
| 32 | Number Plates with clamp, nuts & bolts |
| 33 | Danger Board with clamp for 33 KV |
| 34 | GI Barbed wire (2kg./pole) |
| 35 | Aluminium binding wire- 6 swg (0.5 kg./pole) |
| 36 | Aluminium Paint |
| 37 | Red Oxide Paint |
| 38 | Bolts, Nuts & Washer all sizes |
| 39 | E-bracket |
| 40 | F-bracket |
| 41 | GI Pipe 6\" dia |
| 42 | GI Pipe Holding Clamp |
| 43 | Cable Holding Clamp |
| 44 | Eye Bolt |
| 45 | MS Flat 50x6mm (2.36 Kg./Mtr) (One leg 0.95 Mtr. Long x 8No.) x2 = 15.2 @ 2.36 Kg/Mtr. |
| 46 | 33 KV LA/CT/PT/FS connecting Clamp with Nut& Bolts for Dog/ Panther conductor |
| 47 | MS Plate 200x150x8 mm(12.6 Kg/ Mtr.) |
| 48 | Control Cable 2x2.5 Sq.mm. |
| 49 | Control Cable 4x2.5 Sq.mm. |
| 50 | Chemical earthing GI pipe 50 mm dia 3 mtr long |
| 51 | GI Strip 50x6 mm |
| 52 | Safe carriage, Shifting up JE dump store / side from any ESC Center of Jhansi Zone and Erection, Commissioning and installation of following items done by contractor As per RESPO drawing & Norms |
| 53 | 33 KV Lightening Arrester |
| 54 | 33 KV Line Isolator |
| 55 | 33 KV CT 400/200/1 Amp. |
| 56 | 33 KV VCB 800 Amp., 750 MVA |
| 57 | ST Pole 11 Mt Long-SP-55 |
| 58 | ST Pole 13 Mt Long-SP-70 |
| 59 | 9 Mt. Long PCC Pole |
| 60 | V-type cross arm 100x50x6 mm, MS Channel 9.6 Kg./mtr |
| 61 | Polymeric 11 KV Disc Insulator B&S. Type 70 KN. |
| 62 | Disc FittingsDog/ Racoon 70 KN. |
| 63 | Polymeric 33KV Pin Insulator |
| 64 | GI wire 6 SWG for guarding along the line |
| 65 | GI wire 8 SWG for guarding a cross the line |
| 66 | Earthing of pole by MS earthingrod 20x2500 mm |
| 67 | Complete Stay (GI Stay rod 20x1800 mm, Stay 7/8 SWG 10 Kg.) |
| 68 | M.S. Angle Iron 65x65x6mm, 4300 mm long 2/6/8 no. Bracing, with 4/12/16 clamps (5.8 kg./m) |
| 69 | M.S. Angle Iron 65x65x6, 3200mm long,5.8 Kg/Mtr. for cable with clamp |
| 70 | Topchannel 125X65mm, 3200 mm long (13.10 Kg./m) with clamp |
| 71 | Guarding Angle 75x75x6mm (3500/2200 mm long) |
| 72 | MS Chanel 125x65 mm (13.1Kg./Mtr.) (3.5Mtr. Long x 2 No. = 7M) |
| 73 | MS Angle 75x75x8mm (8.9 Kg./Mt) for Top support of Structure (LA, CT,PT, FS) (2.6Mtr. Long x 2 No. = 5.2) |
| 74 | ACSR Dog Conductor |
| 75 | 33 KV XLPE Cable 3x300 sq.mm. (quote carriage rates only) |
| 76 | 33 KV XLPE 3X300 sq.mmm C/J/Kit (Outdoor) |
| 77 | 33KV Post Insulator |
| 78 | 33 KV Control Panel for Single Feeder |
| 79 | Battery Charger 24 Volt |
| 80 | Battery Set 12 Nos. x 2 Volts, 200 Ah |
| 81 | Concreting, grouting & muffing of support (STP/PCC pole 0.268 cu.mtr/pole) with material |
| 82 | Stucture instalatiion and Grounting of Isolator Structure with 3.5 mtr hight as per drawing including CC 1:4:8, Grouting [(0.3x0.3x1.3)]x2 Mtr. with 0.3 Mtr. Above G.L. |
| 83 | Plastering in 1:412mm thick ofLA, CT, PT, FS, PI Structure [(0.3x0.3)+(0.3x0.35)x2+(0.3x0.35)x2]x2 |
| 84 | Stucture instalatiion and Grounting ofLA, CT, PT, FS, PI Structure 3.5 mtr hight as per drawing with CC grouting and all civil works |
| 85 | Laying and Dressing of 3x300 sqmm XLPE cable by digging method the cable shall with duly protected by brick, sand and stone slab & refiling, raiming of the left oil soil as per drawing. |
| 86 | Laying of 33 KV XLPE cable 3x300 sqmm in HDPE Pipe underground minimum 1.5 meters below by HDD Method |
| 87 | Cable laying on pole through hanging with proper clamping and support |
| 88 | Tree cutting compensation |
| 89 | Making of cable J/kit |
| 90 | Cost of Plinth & Foundation of VCB |
| 91 | Concreting and Grouting of Stay set (0.108 Cu.m./Stay)) |
| 92 | Documentation fee for NOC FROMNHAI/RAILWAY Department |
| 93 | Fee for NOC FROM Electrical Safety Department |