| 1 | Maintenance |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | OD381457/2024-2025:Providingand placing adjustable telescopic prop 3m (2.02-3.75m)in level and position to support the structural member and removing after the completion of work including cost and labour charges etc complete. |
| 4 | 26.28.1:Chipping of unsound/weak concrete material from slabs, beams, columns etc.with manual Chisel and/ or by standard power driven percussion type or ofapproved make including tapering of all edges, making square shoulders ofcavities including cleaning the exposed concrete surface and reinforcementwith wire brushes etc. and disposal of debris for all lead and lifts all completeas per direction of Engineer-In-Charge75mm average thickness |
| 5 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a totalrust free steel surface by using alkaline chemical rust remover of approvedmake with paint brush and removing loose particles after 24 hours of itsapplication with wire brush and thoroughly washing with water and allowingit to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter |
| 6 | OD514764/2024-2025:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more(modified.5.22.6) |
| 7 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chippedportion of RCC as per specifications and direction of Engineer-In-chargecomplete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make |
| 8 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 9 | OD381459/2024-2025:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to t floor five level excluding cost of centering, shuttering, finishing andusing SikaRep Microcrete 4 ( 5-10 mm aggregate nominal size as per requirement) |
| 10 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) |
| 11 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 12 | 14.53.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work |