| 1 | Construction of Tube-well upto 100 Meter depth and above in all type of rocks by DTH system and over burden, to accommodate casing pipe of following sizes in all types of soils and over burden including lowering of casing pipes, but excluding cost of casingpipes as per IS : 2800 (Part I & II) 1979 specifications. The work would be completed after obtaining sand free water. The tube well should have a throughout bore as per nominal dia of casing pipe:200 mm dia Nominal bore. |
| 2 | Supply of ERW M.S. black casing pipe ISI marked (IS:4270/1992) of grade Fe410 of following sizes at site of work.200 mm Nominal bore of pipe |
| 3 | Supply of strainer pipes made of ERW M.S. black pipe ISI mark of following sizes at the site of work including required size of slotting as per IS:8110-1985.200 mm Nominal bore of pipe |
| 4 | S & F tube well cover ofM.S.sheet (6mm thick) with nuts and bolts complete for casing size:200mm dia |
| 5 | P & F G.I. pipes (Internal Work) with G.I. Fittings excluding union (IS:1239 Mark) & MS clamps including cutting and making good the walls and floors: 32mm dia nominal bore\"B\" Class |
| 6 | Un-lowering of submersible pump set with all piping from a tube-well/ open-well complete (labour charge only ) including transportation of tripod, chain, pulley-blockand other materials required and lowering of repaired/ new pump in the tube-well / open-well complete in all respect. |
| 7 | SITC of Single Stage, water cooled, High Speed (2880 RPM), Horizontal, Centrifugal, Openwell Submersible pumps set pre filled with coolent water and fitted with mechanical seal - T/C Vs T/C, Thrust bearing shall be ofcarbon + S.S.The stator body of single phase pumpshall be of SS and rest of all shall be of cast iron. All casting parts should be cathod electro deposition (CED) coated and other construction material should be confirming to IS : 14220: 2018 . The overall performance of pump shall confirm to BEE energy efficiency level of 3 star. Valid BEE certificate from OEM must be submitted for the same. Motor should be IE2 class as per IEC 60034-2-1: 2007, IEC 60034-30: 2008,& IS12615:2011, including making connection etc as required complete in all respect. OEM shall have submitNABL / CPRI / ERDA accrediatedlab type test certificate before execution. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR . 2.0 HP, 1-Ø, (12 -25) Mtr, (350 - 115) LPM |
| 8 | SITC of ContactorOEM Fabricated DOL/Star-Delta Starter panel with switchgear selection as per Type-2 Cordinatiom Chart andmade out from 1.6 mm thick powder coated CRCA sheet, enclosure comprising of over load protection relay, short circuit & single phasing protection, Illuminated ON / OFFpush buttons,ammeter, voltmeter, indicating lamps etc.suitable for following rating motors complete in all respect. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR .2.0 HP to 3.0 HP (DOL starter) |
| 9 | Supply and laying PVC Insulated and PVC Round Sheathed Multi Core copper conductor (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made from99.90 % purity copper, stranding in acc. to IS:8130/IEC 60228 forlower watt loss , oxygen freefor less chances of oxidization, insulation PVC type A/C/D , flame retardant as per IS 10810-53, better amperage rating as per IS:3961 part 5, in existing pipe / open trench / Cable tray / on surface including making connection etc. as required. For additional technical parameters of product / work refer Annexure \"A\" attached with this BSR 4.0 sq.mm x 3 core |
| 10 | SITC of Monoblock motor pump set ISI marked (IS:9079-2002) with TEFC motor, motor should be IE2 class as per IEC 60034-2-1: 2007, IEC 60034-30: 2008,& IS12615:2011. with Stainless steel Impellor, Stainless steel shaft, Mechanical seal, Single/Three phase ( 240 - 440 V ) permanent split capacitor type (PSC), fitted with thermal overload protection, Including cost of hardware etc on existing platform complete. Pump shall have following HP Rating, phase, Head, minimum Discharge respectively complete in all respect. OEM shall have submitNABL / CPRI / ERDA accrediatedlab type test certificate before execution. All as per pre approved by Engineer in charge.For additional technical parameters of products/ work, refer Annexure \"A\" attached with this BSR . 1.0 HP, 1-Ø, (10-120)Mtr, (30-12) LPM |