| 1 | Dismantling of Old brick laid on flat kharanja stacking of old bricks (old tiles road) |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by engineer-in-charge with in a distance of 60 mtr(200 Ft) |
| 3 | construction of embankment with approved material (Earth) obtained from borrow pits withCartage of earth from8 Km as per si no 253(a) , 261© |
| 4 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) |
| 5 | 12 mm thick plaster in 1:4 cement and coarsesand mortar on brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour,T & P etc. As per SI No 584(a) |
| 6 | Cement Concrete work in 1:2:4 Cement, c/ sand, and20 mm stone grit including supply of all materials, labour , T & P etc. |
| 7 | Construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achive desire density complete as per technical specification clause as per MORD 401 |
| 8 | Construction of un-reinforced plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M-30 (Grade), coarse and fine aggregates confirming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design laid in approved fixed side form work (steel channel, laying and fixing of125 micron thick polythene film wedges steel plates including leveling the formwork as per shovels rakes compacted using needle continuous operation including provision of contraction and expansion construction joints as per norms applying debonding strips primer , sealant, dowel bars, near approaches to bridge/ culvert and construction , joints, admixtures as approved, curing of conrete slabs for 14- days, curing compound ( where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 including cost of polythene sheetand also including complete shifting of materials & Concrete etc. |
| 9 | R.C.C Work 1:1.5:3 in cement,c.sand and 20 mm stone grit in door sills, chaukhat, boundry post etc as per si no 282(a)for Road xing |
| 10 | M.s or tor steel in plain such as RCC work i/c its cutting, bending & binding complete As Per DSR 5.22 |
| 11 | Providing & Fixing of granite inogration stone for display board including of all work complete |
| 12 | Deduction of old tiles |
| 13 | Deduction of old bricks |
| 14 | Deduction of old brick bats |
| 15 | Add 18 % GST Amount |