| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
| 2 | A) PCC Pole 8.5/9/11 mrt long/ST pole 11/13 mtr long. |
| 3 | B) 250/400 KVA T/f. |
| 4 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 5 | Cartage of following material from JE Store to site including loading & unloading at both ends maximum distance up to 40 Km. :–A) PCC Pole 8.5/9/11 mrt long/ST pole 11/13 mtr long. |
| 6 | B) 250/400 KVA T/f. |
| 7 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 8 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-250 KVA to 400 KVA |
| 9 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.)1-250 KVA to 400 KVA |
| 10 | Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long ST pole 11/13 mtr long. including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole 8.5/11 Mtr.Long |
| 11 | Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. |
| 12 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 13 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Weasel Conductor. |
| 14 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 15 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line.1-250 KVA to 400 KVA |
| 16 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. |
| 17 | 2-Shackle Insulator with nut & bolt. |
| 18 | 3-Double Pole Clamps with nut & bolt. |
| 19 | Providing and fixing LT Distribution box along with Nut &Bolts. |
| 20 | Providing and fixing Piercing Clamp. |
| 21 | Providing and fixing Dead & End Clamp. |
| 22 | Providing and fixing Bolt and Nuts. |
| 23 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 24 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 25 | Making section T-off for 11 KV/LT Line. |
| 26 | Cutting & Chopping of tree branches. |
| 27 | Jumpering of 11 KV/LT Line at different places/T points. |
| 28 | Grouting of PCC/ST poles with Dust, Cement &Stone blast concretibg as per norms. |
| 29 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 30 | Fixing of Junction Box & making connection & other related works. |
| 31 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4\" dia upto 30 mtr depth/water level. |
| 32 | Fixing of Fuse Set at D/P. |
| 33 | Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120 sqmm.) |
| 34 | Making new Fencing for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |
| 35 | Making new Plinth for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |