| 1 | Supply, Cartage, Erection and Commissioning of the following work on semi Turn Key Basis |
| 2 | Supply of Required Decentralized Material As per approved GTP of DVVNL/UPPCL |
| 3 | HDPE PIPE 6\" DIA |
| 4 | STONE PAD |
| 5 | ALUMINIUM PAINT |
| 6 | GI PIPE 6 INCH DIA FOR XLPE CABLE |
| 7 | RED OXIDE PAINT |
| 8 | CHEMICAL EARTHING COMPLETE |
| 9 | NUT & BOLT |
| 10 | Earthing (GCM compound must be mixed with the water to make thick slurry and pourd arround the G.I PIPE witch acting as electrode) by digging /drilling of pit approx. 10 feet depth and inserting G.l pipe of 32 mm dia b grade ,complete to the required of i.s. specification .two nos.earthing of each site one for the main cable and another of spair cable seprately double pole and equipment to be done the inserted pipe is to be connected to the cable and gi pipe through G.l. strip of size 25*5 mr with help of nut and bolt or by welding as per direction of the engineer of contract its include the cost of all material, labour, t&p provided by the contractor for proper complete of work. |
| 11 | Cartage, Erection and Commissioning of 33/11 KV Line on Single/Double STP/PCC Pole work includes Earthing,Grouting, Laying, Sagging, Strengthing, Painting,Binding of conductor and all work required to erect the line as per Respo Manual and rates. Work includes carriage of all required line material from ESC Hasari to work site (Grouting material will be provided by the contractor)as per Respo manual and rates. |
| 12 | HDPE PIPE 6\" DIA |
| 13 | STONE PAD |
| 14 | ALUMINIUM PAINT |
| 15 | GI PIPE 6 INCH DIA FOR XLPE CABLE |
| 16 | RED OXIDE PAINT |
| 17 | CHEMICAL EARTHING COMPLETE |
| 18 | NUT & BOLT |
| 19 | 11 KV CT/PT POLE MOUNTED UNIT 20/5A |
| 20 | STP POLE 11 MTR |
| 21 | 11 KV JOINTING KIT OUTDOOR TYPE 3*120 SQMM |
| 22 | EARTHING COMPLETE |
| 23 | 11 KV XLPE CABLE 3*120 SQMM |
| 24 | 11 KV COMPOSITE POLYMER PIN INSULATOR |
| 25 | 11 KV VCB O/G 350 MVA 800A |
| 26 | G.I. PIN 11 KV WITH NUT |
| 27 | STAY COMPLETE |
| 28 | 11 KV PILFER RESISTANT METERING CUBICLE 20/5 |
| 29 | M.S TOP CHANNEL 100*50*5*2240 MM |
| 30 | M.S DROPPER CHANNEL 100*50*5*2028 MM |
| 31 | HOLDING CLAMP FOR GI PIPE |
| 32 | CABLE HOLDING CLAMP FOR STP POLE |
| 33 | T/F BASE ANGLE 65*65*6*2028 MM |
| 34 | M.S ANGLE IRON 65*65*6 MM 2700 MM LONG BRACING WITH 4 CLAMP |
| 35 | DISC FITTING 45 KN(T&C) |
| 36 | 11 KV POLYMER DISC INSULATOR (T&C) 45 KN |
| 37 | ACSR WEASEL CONDUCTOR |
| 38 | Earthing (GCM compound must be mixed with the water to make thick slurry and pourd arround the G.I PIPE witch acting as electrode) by digging /drilling of pit approx. 10 feet depth and inserting G.l pipe of 32 mm dia b grade ,complete to the required of i.s. specification .two nos.earthing of each site one for the main cable and another of spair cable seprately double pole and equipment to be done the inserted pipe is to be connected to the cable and gi pipe through G.l. strip of size 25*5 mr with help of nut and bolt or by welding as per direction of the engineer of contract its include the cost of all material, labour, t&p provided by the contractor for proper complete of work. |
| 39 | Digging of cable trench laying of first bricks along the lent in cable trench andstense on top of each cable and filling river sand inside the bricks and filling of exevated earth in cable trench upto ground levelalong with supply and cartage of material |
| 40 | Horizontal boring under pucca road crossing laying and erection of 250mm dia work and cement as per standard and with the provision of petanning wall having distance from one edge of ci/di pipe of another and with the require coupling and al other reuired material for errection of ci/di pipe retaining wall. |
| 41 | LABOUR CHARGES WITH LAYING MATERIAL FOR XLPE CABLE |
| 42 | KACHHA ROAD RESTORATION CHARGES |
| 43 | FILLING OF CABLE JOINTING KIT |
| 44 | CONCREATING OF STAY |
| 45 | CONCREATING OF SUPPORT/POLE |