| 1 | Earth work in excavation by manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : |
| 2 | Providing and lying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. |
| 4 | supplying and filling of stone |
| 5 | Providing and laying Bed Floor Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies,shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excludingthe cost ofcentring, shuttering,finishing and reinforcement with 1:1.5:3 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level using TMT Bars |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 9 | Filling of available earth bs of walling |
| 10 | Edge of slab above 20 cm wide |
| 11 | Suspended floor |
| 12 | Carriage of sand upto a lead of 7Km by MT |
| 13 | Carriage of agg upto a lead of 7Km by MT |
| 14 | Providing and fixing sign boards incl. writing, painting and fixing in both legs on ground |