Agriculture Government Departments Closing in 0 days TDR #51647608

Tender For Repair Work Of Link Road From Lebia To Mahmudpur Via Jhujhela - Earth Work In Cutting Or In Embankment In Oridinary Soil, Excavation To Be In The Form Of Regular Pits Not Exceeding 0.5 M In Depth And Earth Work In Embankment To Be In 20 Cm Laye

Issued by Government Departments · dhampur, Uttar Pradesh
Tender Value
38.36 Lakhs
Estimated cost
Bid Submission
24 Oct 2025
0 days left
EMD
3.85 Lakhs
Bank guarantee accepted
Document Fee
6844
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
dhampur → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Repair work of link road from Lebia to Mahmudpur via Jhujhela - Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers,including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead,including its loading, unloading, carriage and all labour andT&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge. 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. 4 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 to 1-0 kg/sqm using mechanical means as per Technical Specification Clause 502 5 Providing and applying tack coat with bitumen VG-10 gradeusing bitumen distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 6 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration bitumen or emulsion torequired line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as peras per Technical Specification Clause 508. 7 Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 8 Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 3:1.5:1 in pavementas per design thick for c.c. road coarse & fine aggregate confirming to IS standard mixed in concrete mixture/plant of not less then 0.2 cum capacity &appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour tools &plants etc. required for proper completion of work and also including complete shifting of material & concrete etc. as per new Item 4og Ch 20 9 Excavation in foundation in ordinry soil (Loam Clay or sand) including lift upto 1.50 meter and lead upto 30 m all completion of the work (Sl No.251)U Type Drain 10 Concrete with the 4.00 cm gauge brick ballast fine sand of 1.25 finess modulus and cement in the proporation 12:6:1 in foundation and under floor including supply and material all completion of the work (SI No.273) 11 M- 150 brick work in 1:4 cement and approved Coarse Sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. Required for the proper completion of the work. (SI. No. 307A) 12 Cement concrete with 2.00Cm gauge approved stone grit, approved coarse sand & cement in the proportion of 4:2:1 including supply of all mateirals, labour and T&P etc. Required for the proper completion of the work.(S.I. 279A)Top 13 12 mm thick plaster with cement and and approved coarse sand in 1:4 over brick work minimum thickness not be less than 10m all completion of the work (SI No.584) 14 BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B) 15 Brick edging on both sides of the road of first class (M-150) Brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. 16 Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work. 17 Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of CC Area 18 Maintainance of Second Year @ 0.25% of Total work Amount of CC Area 19 Maintainance of Third Year @ 0.50% of Total work Amount of CC Area 20 Maintainance of Fourth Year @ 0.75% of Total work Amount of CC Area 21 Maintainance of Fifth Year @ 1.00% of Total work Amount of CC Area 22 Part-B Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of PC Area 23 Maintainance of Second Year @ 1.00% of Total work Amount of PC Area 24 Maintainance of Third Year @ 1.50% of Total work Amount of PC Area 25 Maintainance of Forth Year @ 2.00% of Total work Amount of PC Area 26 Maintainance of Fifth Year @ 3.00% of Total work Amount of PC Area

BOQ

Name of work:-Sampark Marg Labiya Se Jhujhela Hote Hue Mehmoodpur Tak Marammat Karye
Sl. No. Item Description
1Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers,including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead,including its loading, unloading, carriage and all labour andT&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge.
2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
4Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 to 1-0 kg/sqm using mechanical means as per Technical Specification Clause 502
5Providing and applying tack coat with bitumen VG-10 gradeusing bitumen distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
6Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration bitumen or emulsion torequired line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as peras per Technical Specification Clause 508.
7Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
8Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 3:1.5:1 in pavementas per design thick for c.c. road coarse & fine aggregate confirming to IS standard mixed in concrete mixture/plant of not less then 0.2 cum capacity &appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour tools &plants etc. required for proper completion of work and also including complete shifting of material & concrete etc. as per new Item 4og Ch 20
9Excavation in foundation in ordinry soil (Loam Clay or sand) including lift upto 1.50 meter and lead upto 30 m all completion of the work (Sl No.251)\"U\" Type Drain
10Concrete with the 4.00 cm gauge brick ballast fine sand of 1.25 finess modulus and cement in the proporation 12:6:1 in foundation and under floor including supply and material all completion of the work (SI No.273)
11M- 150 brick work in 1:4 cement and approved Coarse Sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. Required for the proper completion of the work. (SI. No. 307A)
12Cement concrete with 2.00Cm gauge approved stone grit, approved coarse sand & cement in the proportion of 4:2:1 including supply of all mateirals, labour and T&P etc. Required for the proper completion of the work.(S.I. 279A)Top
1312 mm thick plaster with cement and and approved coarse sand in 1:4 over brick work minimum thickness not be less than 10m all completion of the work (SI No.584)
14BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B)
15Brick edging on both sides of the road of first class (M-150) Brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge.
16Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work.
17Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of CC Area
18Maintainance of Second Year @ 0.25% of Total work Amount of CC Area
19Maintainance of Third Year @ 0.50% of Total work Amount of CC Area
20Maintainance of Fourth Year @ 0.75% of Total work Amount of CC Area
21Maintainance of Fifth Year @ 1.00% of Total work Amount of CC Area
22Part-B Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of PC Area
23Maintainance of Second Year @ 1.00% of Total work Amount of PC Area
24Maintainance of Third Year @ 1.50% of Total work Amount of PC Area
25Maintainance of Forth Year @ 2.00% of Total work Amount of PC Area
26Maintainance of Fifth Year @ 3.00% of Total work Amount of PC Area

AI Tender Summary

OUR REF NO 51647608
AUTHORITY Government Departments
TENDER VALUE 38.36 Lakhs
LAST DATE 24-10-2025
Authority
Authority Name Rajya Krishi Utpadan Mandi Parishad
Work Description Tender For Repair work of link road from Lebia to Mahmudpur via Jhujhela - Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers,including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead,including its loading, unloading, carriage and all labour andT&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge. 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. 4 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.7 to 1-0 kg/sqm using mechanical means as per Technical Specification Clause 502 5 Providing and applying tack coat with bitumen VG-10 gradeusing bitumen distributor at the rate of 0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. 6 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration bitumen or emulsion torequired line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as peras per Technical Specification Clause 508. 7 Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 8 Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 3:1.5:1 in pavementas per design thick for c.c. road coarse & fine aggregate confirming to IS standard mixed in concrete mixture/plant of not less then 0.2 cum capacity &appropriate weight batcher using approved mix design, laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour tools &plants etc. required for proper completion of work and also including complete shifting of material & concrete etc. as per new Item 4og Ch 20 9 Excavation in foundation in ordinry soil (Loam Clay or sand) including lift upto 1.50 meter and lead upto 30 m all completion of the work (Sl No.251)U Type Drain 10 Concrete with the 4.00 cm gauge brick ballast fine sand of 1.25 finess modulus and cement in the proporation 12:6:1 in foundation and under floor including supply and material all completion of the work (SI No.273) 11 M- 150 brick work in 1:4 cement and approved Coarse Sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. Required for the proper completion of the work. (SI. No. 307A) 12 Cement concrete with 2.00Cm gauge approved stone grit, approved coarse sand & cement in the proportion of 4:2:1 including supply of all mateirals, labour and T&P etc. Required for the proper completion of the work.(S.I. 279A)Top 13 12 mm thick plaster with cement and and approved coarse sand in 1:4 over brick work minimum thickness not be less than 10m all completion of the work (SI No.584) 14 BOE on edge dry i/c supply of all material labour and t&p etc required for proper completion of the work (SI NO 762 B) 15 Brick edging on both sides of the road of first class (M-150) Brick on edge laid with mud mortar including labour and supply of bricks finished to the required templete and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-Charge. 16 Supplying & Fixing of retro reflective sign board with a corrosion resistant 4 mm thick aluminium composite panel (HIP type IV) as per approved design & drawing. Retro Reflective (HIP type IV) sign board warranty upto 7 years. Rate includes fabrication, supply of materials, transportation and erection of the signage structure for proper completion of work. 17 Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of CC Area 18 Maintainance of Second Year @ 0.25% of Total work Amount of CC Area 19 Maintainance of Third Year @ 0.50% of Total work Amount of CC Area 20 Maintainance of Fourth Year @ 0.75% of Total work Amount of CC Area 21 Maintainance of Fifth Year @ 1.00% of Total work Amount of CC Area 22 Part-B Maintenance of Bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side slop standing tree at adjacent to road wherever cutting of branches of tree, shurb and traimming of grass and weeds etc mentioned in GO No.55 12022/187/23-9-2022-02 Nabard / 2021 Dt 28.04.2022 & Enc letter No. 14 BDD-1 (NH)/40 MT-11/ 2024 Dated 03.01.2024 subjected to approval from Govt. maintence of 1st Year after completion of work @ Zero % of Total work amount of Item 1 to 10 Maintainance of first Year @ 0.00% of Total Work Amount of PC Area 23 Maintainance of Second Year @ 1.00% of Total work Amount of PC Area 24 Maintainance of Third Year @ 1.50% of Total work Amount of PC Area 25 Maintainance of Forth Year @ 2.00% of Total work Amount of PC Area 26 Maintainance of Fifth Year @ 3.00% of Total work Amount of PC Area
Basic Detail
Tender No 3329 Dt.03.10.2025
Bidding Type Tender
Location
City dhampur
State Uttar Pradesh
Key Dates
Publish Date 08 Oct 2025
Submission Date 24 Oct 2025
Open Date 25 Oct 2025
Finance
Tender Value 38.36 Lakhs
Tender Fee 6844
EMD 3.85 Lakhs
Exemption Available
Document List
bd722819-22e2-4be5-a0d0-063cdeeaf6e3.html
BOQ_1976574.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 08, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 24, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 25, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

bd722819-22e2-4be5-a0d0-063cdeeaf6e3.html

xls

BOQ_1976574.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders