| 1 | Demolishing cement concrete 1:4:8 or leaner mix including disposal of material within 50 m lead |
| 2 | Dismantling GI sheet roofing including ridges, hips, valleys and gutters etc and stacking the material within 50 m lead. |
| 3 | Dismantling wood work of sectional area 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead. |
| 4 | Dismantling wood work of sectional area below 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead. |
| 5 | Repairs to plaster in patches of 2.50 Sq.m. and under including cutting the patch to proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead. a) With cement mortar 1 : 4 (1 cement : 4 fine sand) |
| 6 | Removing dry or oil bound distemper by scraping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 7 | Wall painting (one or more coats) with plastic emulsion paint of approved brand and manufacture on old work to give an even shade. |
| 8 | Wall painting (two or coats) with plastic emulsion paint of approved brand and manufacture on new work to give an even shade. |
| 9 | Supplying and fixing Glass panes with wooden fillets including removal of broken glass panes and old wooden fillets wherever necessary but excluding cost of wooden fillets. b) Glass panes 3 mm thick and area 1 Sq.m. each |
| 10 | Providing best available local wood (Class – B II) work in frames of false ceiling, partitions and trusses etc, sawn and put up in position. |
| 11 | Painting two coats with oil type wood preservative of approved brand and manufacture on new work. |
| 12 | Painting (one or more coats) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on old work to give an even shade. |
| 13 | Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade |
| 14 | Providing and laying up to floor two level cement 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) including centering shuttering in :a) Kerbs, steps and the like. |
| 15 | Providing and Fixing Dyna roof 0.45mm thickness and fixed with J or L hooks, bolts & nuts 8 mm dia with bitumen and limpet washers or with limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses. |
| 16 | Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads. |
| 17 | Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads. |
| 18 | Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road |