|
| 1 | Demolition of Concrete (Reinforced) of any description and in any position not otherwise specifically provided for |
| 2 | S&F of Rotational moulded polyethylene water storage tanks 500 L, 3 Layer(cylindrical vertical with closed top) hoisted and fixed in position, Make Sintex, Plasto, Supreemm, Vectus with Minimum 07 year warranty |
| 3 | Portland cement concrete with Volumetric and nominal mix 1:2:4 |
| 4 | S&F of Fixing of 3-layer PP-R P o l y p r o p y l e n e random copolymer) concealed pipes 25 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded p o l y p r o p y l e n e random fittings fixed complete to walls, ceilings or in floors etc |
| 5 | S&F of Fixing of 3-layer PP-R P o l y p r o p y l e n e random copolymer) concealed pipes 20 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded p o l y p r o p y l e n e random fittings fixed complete to walls, ceilings or in floors etc |
| 6 | S&F of Fixing of 3-layer PP-R P o l y p r o p y l e n e random copolymer) concealed pipes 16 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded p o l y p r o p y l e n e random fittings fixed complete to walls, ceilings or in floors etc |
| 7 | Brushing neat cement slurry, Rendering 10mm thick, Addfor5 mm thickness &Add for finish and smooth |
| 8 | Integral waterproofing compound |
| 9 | Ball valves high pressure of PTMT with epoxy coated Aluminium rod & highdensity plastic ball screwed for iron pipe and fixed. (Minimum weight 15mm-142gms/2 0 m m - 2 1 0 g m s . /25mm-455gms/ 40mm - 690 gms) |
| 10 | Stop valve of PTMT any colour high pressure screwed for iron pipe and fixed. (Minimum weight 15mm-90gms/ 20mm-92gms) |
| 11 | Removing demolished building materials etc. to a distance of 600m or under, beyond the lead included in the rates, including loading, unloading and stacking at the destination |
| 12 | Hole Cutting |
| 13 | Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete |
| 14 | Expanded metal, cut to length, bent to shape required and tying with and including annealed mild steel wire not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed complete to wood or steel members |
| 15 | Butt hinges, heavy weight, cold rolled mild steel, and fixed |
| 16 | Taking down cement plaster on CC/Brick surfaces including raking out joints hacking for key scrubbing down with water etc. as directed |
| 17 | ( M & L ) Rendering 10 mm thick on fair faces of concrete or brick surface with cement plaster 1 : 4 with water proofing compound apply neat cement slurry or as directed by EIC/SIC. Note- Water proofing compound will paid and measured separately |
| 18 | i) Preparation of the surfaces of the roof by cleaning with wire brush, removing old treatment, if any.ii) Brooming with Broom and finally sweeping with gunny bag.iii) Cutting the joints in ‘V’ shape and filling them with 1:3 cement sand mortar and allowing them for curing for 03 days.iv) Filling the thin grooves with hot bitumen and allowing them to dry.v) Applying a coat of hot bitumen of grade 85/25 @ 1.20 Kg/Sq.m. over the area even and smooth.vi) Unrolling the roll ofPolymeric waterproofing membrane over the coated surface and press smoothly to bond completely with the surface and no air bubble should be left under the membrane. The lap should be not less than 10 cm both horizontaly and vertically. The lap will not be measured separately.vii) Lap should be sealed with flame and blown bitumen thereafter.viii) Applying the IInd layer of the hot bitumenof grade 85/25 @ 1.20 Kg/Sqm. even and smooth on the polymeric membrane. ix) Removing the debris off the campus.,x) Specification of the Polymeric membrane.a) The center core of the membrane should be 90 micron, withhigh molecular/high density Polythelene film provided both side with SBS/APP polymer modified bitumen with properties of high softening point., b) Top layer and bottom layer- Therofusible high molecular/high density polythelene film.c) Elongation- More than 300%, d) Weight-3.00Kg/Sqm., e) Thickness- 3mmf) Make- Texsa India Ltd./IWL India Ltd./STP Ltd.g) Softening point- More than 120 C,h) Should not break at -15 C, i) Should not drip at 100 Cj) Applying a coat bituminous base aluminium paint over water proofing membrane.k) The firm will ensure that no seepage occurs from the area on which water proofing has been done as per specification above.l) The firm will provide a guarantee for 7 years from the date of completion. |