| Sl. No. | Item Description |
| 1 | Untalad to Gondusar Km 0/0 to 4/0 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 3 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 4 | Dressing of berms including digging of earth upto 10 cm depth. |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 6 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 7 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 8 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 9 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 10 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 11 | Mundar to Bhasina Km 0/0 to 6/0 |
| 12 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 13 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 14 | Dressing of berms including digging of earth upto 10 cm depth. |
| 15 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 16 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 17 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 18 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 19 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 20 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 21 | Bidasar to Ghantiyal Km 0/0 to 5/0 |
| 22 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 23 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 24 | Dressing of berms including digging of earth upto 10 cm depth. |
| 25 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 26 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 27 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 28 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 29 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 30 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 31 | Sujangarh Road to Bara Km 0/0 to 3/600 |
| 32 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 33 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 34 | Dressing of berms including digging of earth upto 10 cm depth. |
| 35 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 36 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 37 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 38 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 39 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 40 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 41 | Gopalpura to Dunkar Via Hemasar Athuna Balera Km 0/0 to 14/300 |
| 42 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 43 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 44 | Dressing of berms including digging of earth upto 10 cm depth. |
| 45 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 46 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 47 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 48 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 49 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 50 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 51 | A/R to Soorwas Km 0/0 to 2/300 |
| 52 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 53 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 54 | Dressing of berms including digging of earth upto 10 cm depth. |
| 55 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 56 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 57 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 58 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 59 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 60 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 61 | Sarothiya to Marothiya Via Bilanga Km 0/0 to 6/500 |
| 62 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 63 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 64 | Dressing of berms including digging of earth upto 10 cm depth. |
| 65 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 66 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 67 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 68 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 69 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 70 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 71 | Malaksar to Khara Km 0/0 to 4/700 |
| 72 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 73 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 74 | Dressing of berms including digging of earth upto 10 cm depth. |
| 75 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 76 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 77 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 78 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 79 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 80 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 81 | Bhasina Bagsara Athuna Road to Jhandia Km 0/0 to 2/0 |
| 82 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 83 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 84 | Dressing of berms including digging of earth upto 10 cm depth. |
| 85 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 86 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 87 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 88 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 89 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 90 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 91 | Sarothiya to Luhara Km 0/0 to 6/900 |
| 92 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 93 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 94 | Dressing of berms including digging of earth upto 10 cm depth. |
| 95 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 96 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 97 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 98 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 99 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 100 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 101 | Mundra to Kerla Km 0/0 to 3/0 |
| 102 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 103 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 104 | Dressing of berms including digging of earth upto 10 cm depth. |
| 105 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 106 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 107 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 108 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 109 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 110 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 111 | Bhompura to Mela Ground Via Main Road Km 0/0 to 2/0 |
| 112 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 113 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 114 | Dressing of berms including digging of earth upto 10 cm depth. |
| 115 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 116 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 117 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 118 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 119 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 120 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 121 | Balera to Rupeli Km 0/0 to 1/500 |
| 122 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 123 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 124 | Dressing of berms including digging of earth upto 10 cm depth. |
| 125 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 126 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 127 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 128 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 129 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 130 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 131 | Parewada to Sandwa Km 0/0 to 8/800 |
| 132 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 133 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 134 | Dressing of berms including digging of earth upto 10 cm depth. |
| 135 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 136 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 137 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 138 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 139 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 140 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 141 | Inayara to Parawa Via Parewada Km 0/0 to 11/300 |
| 142 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 143 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 144 | Dressing of berms including digging of earth upto 10 cm depth. |
| 145 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 146 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 147 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 148 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 149 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 150 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 151 | Ganora to Kodasar Via Bidawatan Via Charla Kodasar Jatan Km 0/0 to 11/500 |
| 152 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 153 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 154 | Dressing of berms including digging of earth upto 10 cm depth. |
| 155 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 156 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 157 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 158 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 159 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 160 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 161 | Bus Stand to Kandalsar Km 0/0 to 1/00 |
| 162 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 163 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 164 | Dressing of berms including digging of earth upto 10 cm depth. |
| 165 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 166 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 167 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 168 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 169 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 170 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 171 | Sujangarh Gopalpura road to Dungras Athuna Km 0/0 to 2/500 |
| 172 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 173 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 174 | Dressing of berms including digging of earth upto 10 cm depth. |
| 175 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 176 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 177 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 178 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 179 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 180 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 181 | Salt Area to Tal Chhapar Km 0/0 to 6/500 |
| 182 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 183 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 184 | Dressing of berms including digging of earth upto 10 cm depth. |
| 185 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 186 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 187 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 188 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 189 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 190 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 191 | Sadoo to Jyak Km 0/0 to 5/00 |
| 192 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 193 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 194 | Dressing of berms including digging of earth upto 10 cm depth. |
| 195 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 196 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 197 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 198 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 199 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 200 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 201 | NH 65 to Kanoota Km 0/0 to 1/0 |
| 202 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 203 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 204 | Dressing of berms including digging of earth upto 10 cm depth. |
| 205 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 206 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 207 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 208 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 209 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 210 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 211 | Ramnagar to Durgana to Kodasar Bidwatan Km 0/0 to 1/0 |
| 212 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 213 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 214 | Dressing of berms including digging of earth upto 10 cm depth. |
| 215 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 216 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 217 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 218 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 219 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 220 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 221 | Constt of Road from District Boarder Nagur to NH 65 Via Valodiya Basti Km 0/0 to 1/500 |
| 222 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 223 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 224 | Dressing of berms including digging of earth upto 10 cm depth. |
| 225 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 226 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 227 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 228 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 229 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 230 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 231 | Charla to Bhompura Km 0/0 to 13/640 |
| 232 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 233 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 234 | Dressing of berms including digging of earth upto 10 cm depth. |
| 235 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 236 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 237 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 238 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 239 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 240 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 241 | A/R to Sandwa Km 0/0 to 1/0 |
| 242 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 243 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 244 | Dressing of berms including digging of earth upto 10 cm depth. |
| 245 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 246 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 247 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 248 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 249 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 250 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 251 | A/R Bamboo Km 0/0 to 1/0 |
| 252 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 253 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 254 | Dressing of berms including digging of earth upto 10 cm depth. |
| 255 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 256 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 257 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 258 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 259 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 260 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 261 | CC Road from Sikar Nokha Inyara Camp to Magrasar Via Kanoota Km 0/0 to 0/800 |
| 262 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 263 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 264 | Dressing of berms including digging of earth upto 10 cm depth. |
| 265 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 266 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 267 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 268 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 269 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 270 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 271 | Rupeli to Chadwas Km 0/0 to 2/050 |
| 272 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 273 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 274 | Dressing of berms including digging of earth upto 10 cm depth. |
| 275 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 276 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 277 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 278 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 279 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 280 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 281 | Main Road to Luhara Rasta to Parewada Rasta Udawala Km 0/0 to 1/0 |
| 282 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 283 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 284 | Dressing of berms including digging of earth upto 10 cm depth. |
| 285 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 286 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 287 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 288 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 289 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 290 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 291 | Atal Seva Center Huntaram Bawari house Via Deva Ram Manda Channa Ram Sihag Sohan Ji Manda Jiva Ram Manda Balera Km 0/0 to 0/970 |
| 292 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 293 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 294 | Dressing of berms including digging of earth upto 10 cm depth. |
| 295 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 296 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 297 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 298 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 299 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 300 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 301 | Balera to Rupeli Km 0/0 to 1/500 |
| 302 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 303 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 304 | Dressing of berms including digging of earth upto 10 cm depth. |
| 305 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 306 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 307 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 308 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 309 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 310 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 311 | Main Road Vilalge se hote huye Magrasar phante Tak Mundra km 0/0 to 0/670 |
| 312 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 313 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 314 | Dressing of berms including digging of earth upto 10 cm depth. |
| 315 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 316 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 317 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 318 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 319 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 320 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 321 | Natha Ram parjapat ke Ghar to Balaji Mandir tak Sarothiya Km 0/0 to 1/00 |
| 322 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 323 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 324 | Dressing of berms including digging of earth upto 10 cm depth. |
| 325 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 326 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 327 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 328 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 329 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 330 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 331 | Magrasar to Jayal up to Nagaur Distt Boarder Km 0/0 to 2/0 |
| 332 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 333 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 334 | Dressing of berms including digging of earth upto 10 cm depth. |
| 335 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 336 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 337 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 338 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 339 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 340 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 341 | Approach Road to Khoti Nada Km 0/0 to 3/0 |
| 342 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 343 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 344 | Dressing of berms including digging of earth upto 10 cm depth. |
| 345 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 346 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 347 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 348 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 349 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 350 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 351 | Sujangarh Gopalpura road to Dungar Balaji Temple Km 0/0 to 1/03 |
| 352 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and treesofgirthupto300mm,removalofstumpsofsuchtreescutearlier anddisposalofunserviceable materialsand stacking ofserviceable materialto beused orauctioned,uptoa leadof1000mincluding removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 353 | Restorationofraincutswithsoil,moorumgraveloramixtureofthese,clearingtheloosesoil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopesas per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 354 | Dressing of berms including digging of earth upto 10 cm depth. |
| 355 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 356 | MaintenanceofWBMroadincludingfillingupofpotholes,rutsandrectifyingcorrugatedsurface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 357 | Repairtopotholesandremovalofloosematerial,trimmingofsides,cleaningofsurfaceby providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 358 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumenand suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 359 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 360 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |