| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. comple |
| 2 | Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing |
| 3 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29mm height for plane surfaces in all floors with cross bracings using mild steel sheets of size 30cm x 55cm and 10 gauge stiffened welded with mild steel shee |
| 4 | a). For Sqr. Column |
| 5 | b). For Plinth Beam |
| 6 | Supplying fabricating and placing in position of TMTsteel rods using M.S. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in positionetc. Complete. Complying with std. specifications. TNDSSNo,9 |
| 7 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading cha |
| 8 | Brick Work in Cement Mortar 1:5 Mix (one cement, five sand) using new Country Bricks of size ( 9” x 4 3/8” x 21/4 “ )from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 10 | Supplying and fixing M.S.grill to doors, special windows and ventilators etc as directed by the departmental officers inclusive of cost of MS grill including one of cost red oxide and fixing in position etc., complete (as per the schedule of rate) SL.NO.1 |
| 11 | Painting the new iron work two coat of best synthetic enamel paint of approved colour and brand over existing primimg coat,including scrapping and preparation of surface, cost of breshes and neat finishing complying with stadard specifications |
| 12 | Painting two coats of newly plastered wall surface with weather shieled exterior paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, w |