| 1 | Supply cartage erection & commissioning of the following work on semi turnkey basis |
| 2 | Supply Of Decentralized Material as per approved GTP of DVVNL/UPPCL |
| 3 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 4 | TAILLESS UNIT STAND |
| 5 | TAILLESS UNIT 500 A |
| 6 | FENCING FOR 250 KVA T/F |
| 7 | CHEMICAL EARTHING COMPLETE |
| 8 | M.S DROPPER CHANNEL 100*50*5*2028 MM |
| 9 | T/F BASE ANGLE 65*65*6*2028 MM |
| 10 | M.S . TOP CHANNEL 100*50*5*2240 MM |
| 11 | MS TEE OFF CHANNEL 100*50*5*2240 MM |
| 12 | ALUMINIUM LUGS |
| 13 | STONE PAD 300*300*75 MM |
| 14 | HOLDING CLAMP FOR TOP/DROPPER CHANNEL |
| 15 | CABLE LT PVC 4*16 SQ.MM |
| 16 | LT CLAMP |
| 17 | SUSPENSION CLAMP WITH EYE HOOK |
| 18 | NUT & BOLT |
| 19 | DEAD END CLAMP |
| 20 | DISTRIBUTION BOX CLAMP |
| 21 | Cartage, Erection and Commissioning of 33/11 KV Line on Single/Double STP/PCC Pole work includes Earthing,Grouting, Laying, Sagging, Strengthing, Painting,Binding of conductor and all work required to erect the line as per Respo Manual and rates. Work includes carriage of all required line material from ESC Hasari to work siteand Dismantling of old material carriage from site to store(Grouting material will be provided by the contractor)as per Respo manual and rates. |
| 22 | ALUMINIUM CRIMPING LUG 240 SQMM |
| 23 | TAILLESS UNIT STAND |
| 24 | TAILLESS UNIT 500 A |
| 25 | FENCING FOR 250 KVA T/F |
| 26 | CHEMICAL EARTHING COMPLETE |
| 27 | M.S DROPPER CHANNEL 100*50*5*2028 MM |
| 28 | T/F BASE ANGLE 65*65*6*2028 MM |
| 29 | M.S . TOP CHANNEL 100*50*5*2240 MM |
| 30 | MS TEE OFF CHANNEL 100*50*5*2240 MM |
| 31 | ALUMINIUM LUGS |
| 32 | STONE PAD 300*300*75 MM |
| 33 | HOLDING CLAMP FOR TOP/DROPPER CHANNEL |
| 34 | CABLE LT PVC 4*16 SQ.MM |
| 35 | LT CLAMP |
| 36 | SUSPENSION CLAMP WITH EYE HOOK |
| 37 | NUT & BOLT |
| 38 | DISTRIBUTION BOX CLAMP |
| 39 | DEAD END CLAMP |
| 40 | LT AL.XLPE CABLE 1*240 SQMM |
| 41 | LT XLPE CABLE 3.5 * 240 |
| 42 | 250 KVA 11/0.4 KV TRANSFORMER NEW |
| 43 | 11 KV COMPOSITE POLYMER PIN INSULATOR |
| 44 | LT XLPE CABLE 3.5*70 SQMM |
| 45 | 3 PHASE DO FUSE SET |
| 46 | D.P. CLAMP FOR PCC 8.5 MTR POLE |
| 47 | STAY COMPLETE |
| 48 | 11 KV POLYMER DISC INSULATOR(T&C) 45 KN |
| 49 | PCC POLE 8.5 MTR LONG |
| 50 | EARTH ROD 2540*20 MM |
| 51 | EARTHING COMPLETE |
| 52 | DISC FITTING 45 KN (T&C) |
| 53 | 25 KVA 11/0.43 KV L-II 4 STAR AL. WOUND TRANSFORMER |
| 54 | G.I. WIRE 6 SWG |
| 55 | ACSR WEASEL CONDUCTOR |
| 56 | 11 KV F CLAMP FOR PCC POLE 8.5 MTR LONG |
| 57 | DISTRIBUTION BOX 3 PHASE |
| 58 | ABC(3*95 + 1*70 + 1*16) SQMM |
| 59 | 11 KV FUSE SET |
| 60 | ST POLE 9 MTR |
| 61 | 11 KV V-TYPE STEEL CROSS ARM 65*65*6 MM |
| 62 | 11 KV CROSS ARM CLAMP FOR PCC |
| 63 | ABC ( 3*120 + 1*95 + 1*16) SQMM |
| 64 | HARD ROCK PIT DIGGING |
| 65 | CONCREATING OF SUPPORT |
| 66 | CONCREATING OF STAY |
| 67 | OLD & NEW TRANSFORMER CARRIAGE BOTH SIDE INSTALLATION & DISMANTLING |
| 68 | PLINTH FOR 250 KVA T/F |