| 1 | CD Work Hp Culvert |
| 2 | Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 3 | Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108. |
| 4 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 5 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 6 | Providing and laying RCC pipe NP-4 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation,protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106 |
| 7 | A) 1000 mm Dia |
| 8 | Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 9 | Foundation |
| 10 | Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203PCC M-15 Grade |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-20 Grade |
| 13 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 14 | Sub Structure |
| 15 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 PCC M-20 Grade |
| 16 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 |
| 17 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204RCC M-25 Grade |
| 18 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 19 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(With Sandy Materials ) |
| 20 | Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smallersize towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specificationClause 1204.3.8 |
| 21 | Superstructure |
| 22 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5RCC M-30 Grade |
| 23 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 24 | Parapet Construction Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M20 ) |
| 25 | Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
| 26 | Drainage spouts complete as per drawing and technical specifications Clause 1209 |
| 27 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 |
| 28 | Approch slab(M 30) : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M-30 Grade |
| 29 | PCC M15 Ordinary grade (1:2.5:5 ) levelling course below approach slab complete as per drawing and technical specifications clauses 800 and 1211. |
| 30 | Protection work |
| 31 | Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104 |
| 32 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragmentweighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 |
| 33 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade Curtain wall |
| 34 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203PCC M-20 Grade |
| 35 | Labour Cess @ 1% |
| 36 | Seniorage Fee |
| 37 | GST @ 18% |