| 1 | Breakdown & major repair/major replacement work of Dr. R.P.Ghat SPS at Varanasi. |
| 2 | Repairing of 15000 LPM 23 mtr. head kirloskar make pump no. 1,2,3 & 4 |
| 3 | Carting of pump from site to workshop including loading & unloading. |
| 4 | Cleaning of dismantle part of Pump properly at workshop. |
| 5 | Metalizing, turning and polishing of shaft at both bearing, oil seal and threaded portion metalizing and re-threading. |
| 6 | S/Fof following items-a- SS sleeve as per sample- 1No.b- O-ring size 3” – 1 No. |
| 7 | S/F of ball bearing No. 6414 |
| 8 | S/F of Roller bearing No. NU-314 |
| 9 | S/F of Rubber bush- 30mm O.D. x 20mmI.D. x 25mm long- 8 Nos. |
| 10 | Assembling of pump at workshop including supply of required packing, grease and gland dori. |
| 11 | Carting of pump from workshop to site including loading & unloading. |
| 12 | Repairing of sluce valve 250mm & 300mm dia includingdismatling and installationdeep in 18 mtr pimp well all cost of materil labour charge t&petc.complete. |
| 13 | Instllation of 5000 LPM 23 mtr. head kirloskar make pump no. 1,2,3 & 4 dewatering pump set, required LED flood light etc. including all cost of material, labour charges T&P. complete. |
| 14 | Repairing and servicing of 160 KVA DG set. 2 No. |
| 15 | Cleaning of radiator & fitting its pressure testing inDG set No. 2 and 3. |
| 16 | Dismantling of air filter of DG Set No. 2 and 3, one by one proper cleaning, filling of Mobil oil, fitting of air filter in DG Sets. |
| 17 | Draining out the old engine oil from DG Set No. 2 and 3, one by one, cleaning of oil chamber properly. |
| 18 | Supply and filling of fresh mobil oil one by one in 3 DG set No. 2 and 3. |
| 19 | S/F of fuel filter in three DG Sets No. 2 and 3. |
| 20 | S/F of mobil filter in threeDG Sets No. 2 and 3. |
| 21 | Supply and filling of coolent in2 DG sets No. 2 and 3. |
| 22 | Supply and fitting of 180 AH Battery 2 Nos. for one DG setNo. 2. |
| 23 | Complete servicing of DG set engine and its testing. DG set No. 2 and 3 |
| 24 | Repairing and servicing of 320 KVA DG Set -1No. |
| 25 | Dismantling of air filter of DG Set No. 1, proper cleaning, filling of Mobil oil, fitting of air filter in DG Set. |
| 26 | Draining out the old engine oil from DG Set No.1, cleaning of oil chamber properly, upply and filling of fresh mobil oil inDG set No. 1. |
| 27 | S/F of fuel filter in three DG Sets No. 1. |
| 28 | S/F of mobil filter in threeDG Sets No. 1. |
| 29 | Supply and filling of coolent inDG sets No. 1. |
| 30 | Complete servicing of DG set engine and its testing. DG set No. 1. |
| 31 | Painting works of equipment E&M work |
| 32 | Rubbing, Scrubing and cleaning of following equipments at Dr. R.P. Ghat Pumping station with all materials labours and T&P complete for preparing the surface to painting works including safety devices to prevent accident(a) Transformers 630 K.V.A. and base. - 2Nos.(b) 125 HP motors- 3 Nos.(c) 15000 LPM Pumps- 2 Nos.(d) 8800 LPM pumps-2Nos.(e) 75 HP motor - 3 Nos.(f) Starter ATS- 4 Nos.(g) Panels HT/LT-10 Nos.(h) ACB/VCB- 5 Nos.(i) Change overs – 3 Nos.(j) Complete header line, S.V/ R.V and all fitting in pump well.(k) Stair/ Platforms inPump well, Sump well and Spl. main hole complete.(l) Screens fitted on ground level, Transformer fencing complete.(m) 3 x 160 KVA DG Set with alternator complete & oil tanks. |
| 33 | Painting of all above by spray machine with Smoke grey/ black enamel paint as required with all materials, labours and T&P complete required for completion of works. |
| 34 | Making Name Plate (Radium stickers) of all equipment and few Danger plate symbol & fire etc. and fitting properly at site. |
| 35 | Repairing of 125 HP Motor work |
| 36 | Carting of 125 HP Motor No.1 from Dr. R.P. Ghat SPS to workshop with loading, unloading for all T&P. |
| 37 | Dismantling of all parts of 125 HP, 960 RPM motor and cleaning properly. |
| 38 | Cutting and snatching of burnt copper wire from 125 HP, 960 RPM motor cleaning of slots & rewinding of same motor with suitable size of copper wire super enameled, Varnishing, Heating of motor all T&P and labour charges. |
| 39 | S/F of Ball bearing No. 6318. |
| 40 | S/F of Roller bearing No.N-321 |
| 41 | Assembling of all parts of motor & fitting at site Dr. R.P. Ghat on the base plate including testing on load at site at workshop. |
| 42 | Carting of above motor after repairing from workshop to Dr. R.P. Ghat SPS, VNS. |
| 43 | Lowering, installation, testing & commissioning of pump motor & starter after flood period and its verification to EIC. |
| 44 | Repairing of 160 KVA DG set alternator No. 2 rewinding of alternator including all cost of material, labour charges etc. complete. |
| 45 | Repairing of Blower motor - 1HP Crompton make - 3No. And supply of Pipes 80mm dia - 20mtr.including all cost of material, labour charges etc. complete. |
| 46 | SITC of flood light - 200 watt-8 No. in Pump well, sump well & special sump well. |
| 47 | SITC of flood light - 100 watt-10 No. in Pump well, sump well & special sump well, control panel, LT Panel, DG Room. Campus |
| 48 | SITC of flood light - 50 watt-5 No. inLT Panel, DG Room. HT Panel room, TF yard etc. |
| 49 | SITC of Tube light- 22 watt-20 No. inLT Panel, DG Room. HT Panel room, Pump house, office, store, control panel room etc. |
| 50 | SITC of LED Bulb with cover injector- 9 watt-25 No. inBridge withbathroom, etc. |
| 51 | SITC ofexhaust fan - 5 Nos in HT, LT Panel room, office, bathroom |
| 52 | SITC ofceiling fan - 5 Nos in HT, LT Panel room, office, store room, |
| 53 | SITC ofLEDJhalar on festival of Dev dipawali including all cost of material and labour charge etc. complete. |
| 54 | SITC of Electric resistance sheet - 7 No. for HT, LT, PLC Panel, maintenance register - 2 Nos. attended register - 3No., Pen- 10 No. etc. |
| 55 | Shifting of proper arregment of laid cableform transformer to meter room and cover of cable in meter room, restore of interlocking tiles& repairing of door of bathroom. PCC ofElectric meter room etc. complete with material and labour charges |
| 56 | Carting of old PLC panelfrom Dr. R.P. Ghat SPS to Dinapur store includinglabour chargesT&P complete. |
| 57 | Servicing of RO water Cooler, change of filter etc. complete including all material labour charge etc. complete. |
| 58 | Supply of Heater 2000 watt, Glass- 8 No. Plate- 2 No. Pack of new water Bottle 250ml - 4 Peti(Packet) |
| 59 | Supply of SS chokege removal equipment (Panja) |
| 60 | Repairing/Replecment of 24 volt self for 160 KVA DGset- 3No. |
| 61 | SITC 150 AH Battery - 4Nos. Including all cost of material and labour charge etc. complete for DG set 1 & 2. |
| 62 | Supply of Chair - 8 Nos., supply ofnew empty drum for diesel carting- 4Nos., Almirah - 1No. |
| 63 | Repairing of 125 HP ATS starterJSL make- 4Nos. and replacement of burnt motor connection plate, lug including all cost of material labour charge etc. - 9 Months Comprehensive maintenance. |
| 64 | Centrifuging of oil and Repairing of 630 KVA (33/0.4KV) Transformer No. 1 & 2 at Sub-station |
| 65 | Dismantling of LT bushing & top cover inspection box for repairing of leakage oftransformer oil in bushing& damaged packing, taking out of bushingrod with damaged packing etc. |
| 66 | Supply & fitting of LT Bushing packing tostop theleakage of transformer oil, fitting of all dismantled parts & inspection box. |
| 67 | Supply and fitting of silica gel breather (2Kg. ALU) complete set and repairing of oil glass. |
| 68 | Top up the transformer No. 2 by filling of fresh 420 lit. Transformer oil and transformer No. 1 by 210 ltr. oil and Centrifugingof transformer oil from top to bottom & bottom to top (Total 3240 ltr.) by centrifuging machine including all labour T&P etc. complete and testing on load at site. |
| 69 | Miscellaneous work (like as Supply of broom-12, cloth-10 kg, harpic, Acid, Dettol soap, mustard oil, diesel carting charges during diesel supply, electric fault, Greasing, Gland dori of pump & motorcampus and Transformer sidegrass cutting (upto 9 months) etc. on periodic basis as per requirement. |
| 70 | Comprehensive maintenance of APFC Panel- 125 KVAR with its calibration certificate Including all cost of material and labour charges T&P.- 9 months |
| 71 | Servicing of 160 KVA old DG set 4 Nos. with material mobil oil, filter, air filter, cleaning of rediator, repairing of self24 volt including all cost of material, labour charges etc. complete. |
| 72 | Comprehensive maintenance of ACB 800 Amp. - 2No.LT Panel (main SFU-800 Amp. 2 Nos., SFU-400 Amp. 4 Nos.,-and 63 Amp. 3 Nos., etc) & AMF Panel, replacing of burnt or non-working items, including all cost of material and labour charges. |
| 73 | Comprehensive maintenance , Repairing of bypass gate actuator, gear box and filling of fresh grease as per requirementcomplete, Subjected to verification of EIC. |
| 74 | Repairing/Replacement of existing IP Cameras along with its 09 Month recharge. etc. complete Subjected to verification of EIC. |
| 75 | Repairing/SITC of ladder, mesh, MS Rod size - 12mm x 220 mtr. C channelsize 100mm x 5mm x 50mm gadder size 100mm x 15mm x 15mtr.MS angle in Pump well- 18mtr. deep, & special sump well - 18mtr. Deepas per old structure and dismantling of old Mesh gudder , ladder etc. including all cost of material labour charges etc. complete. |
| 76 | Comprehensive maintenance, Repairing of Dewatering Pump - 5 HP including all cost of material, labour charges etc. Complete. |
| 77 | Delegation and other officials Site visit arrangement throughout the year as per requirement and direction of engineer in charge.( 9 months) |
| 78 | Supply of tools set, TOOLS:This shall be a set of tools comprising of following items: (i) D-spanner set (6-17 mm)1 Set.(ii) Ring spanner(6-17mm) 1 Set(iii) Insulated cut Plier 1 No. (iv)Pipe wrench 18\" 1 No.(v) Screw driver 12”1 No. (vi)Hammer (500gm) with handle 1 No. (vii) Screw driver 8” 1 No. (viii) Tool box suitable size 1 No. (ix) Tonge tester (AC/DC- 500A) 1 No. (x) Electric safety hand gloves 1 Set(xi) Multi meter (AC/DC- 500A)1 No. (xii) Megger (AC/DC- 500V) 1 No. (xiii) Crimping tools 1 No. |
| 79 | Cover of HT panel room, LT panel roomcable tranch by MS chequered plate including all cost of material, labour charges etc. complet.e |
| 80 | Repairing of suction sluice valve 300/250 mm - 4Nos. and SS Y-delivery pipe removal of chock ages from NRV, Pumps and dewatering,(9 months) whenever necessary as per requirement and direction of EIC. |
| 81 | SITC of 800mm dia electromagnetic flow meter totalizer with cable as per old model on PLC basses including all cost of materail, labour charge etc. complete. |
| 82 | Repairing/Preventive maintenance of earthing by GI Strips (size 50x6mm) of 2 No. & checking and testing earth pit all electrical equipment-Pumping Plant. of GI Strips as per side condition. |
| 83 | Refiling of ABC type/CO2 fire extinguisher direction of EIC. Dr. R.P.Ghat SPS, Varanasi. |
| 84 | Miscellaneous and emergency work any damaged E&M Equipment, Delivery pipe line, common hedder, Y Pieces, Pump & motor, DG set etc. complete ae per repuirment of directionof EIC. |