Procurement, Installation And Maintenance Of Washrooms And Sanitation Facility Equipment And Consumables , Upgrade Washrooms/ Sanitation Facilities Estimated Cost: 16,00,000/- , Breaking Of Exciting Raised Urinal Area ,Partition,Wall,Floor Tiles,Sunken Are For Laying Of Soil & Waste Pipes , Stacking Of Dabries Within 100Mtr Distatnce , Chemical Waterprofing And Closing Of Holes Made For Pipes , Filling Of Sunken Area With Rubble And Finishing With Porper Cementing , Making Opening For Window &Closing Of Existing Window As Per Toilet Requirement ,Plastring For Inside & Creating New Window , Breaking Of Basinn Counter & Stacking Dabries Up To 100 Mtr Distance , Basin Counter With Black Granite & Its Edge Polishing Including Vertical Support , Dismentling Of Old Plumbing Such As Cocealed Piping ,Urinals & Other Cp Fittings , Tilling Work For Wall & Floor Tiles , Plumbing , A) P/F Wash Basin,Ceramic , B) P/F E Wc Set , C)P/F Piler Tap/Long Body Tap , D)P/F Bottel Trap , E)P/F Angel Stop Cock , F)P/F West Coupling , G) P/F Connecting Sleve , H)P/F Cockroach Trap , I)P/F Flush Tank , J)All Plumbing Work For Ewc Including Water Supply Soil & Waste Pipes Chesingets. , K)All Plumbing Work For Wash Basin Including Water Supply & Waste Pipes Chesingets. , L)P/F Heltech Focet , M)External Plumbing Soil, Waste Pipe Connection To Chember , Water Supply Line & Connectingtochember/ Vertical Pipes , P/F Alluminium Door With Acp Sheet Icluding 2*1 Alluminium Powder Coted Framing With Accessories , Alluminum Partion For Toilet ,Windows , Disposal Of Dabries By Truck Icluding Loading Up 8 Km Distance , Grab Bar For Handicap , Acid Wash Final Acid Cleaning Of Toilet Tiles And Surfaces For Hygiene And Shine