Tender For Provision Of 04 Maj Md Accommodation At Mil Station Kalka.; 1 Total amount of Sch A Sec-I ( BUILDING WORKS ) Lump sum price worked out by the contractor for BUILDING WORKS as listed in schedule A Part-I 2 Total amount of Sch A Sec II (SITE CLEARANCE, SITE DEVELOPEMENT & MISC. EARTH WORKS) Lump sum price worked out by the contractor for SITE CLEARANCE &Earth Works as listed in schedule A Part-II 3 Total amount of Sch A Sec III ( INTERNAL WATER SUPPLY WORKS ) Lump sum price worked out by the contractor for BUILDING WORKS as listed in schedule A Part-III 4 Total amount of Sch A Sec IV (INTERNAL ELECTRIFICATION WORKS) Lump sum price worked out by the contractor for BUILDING WORKS as listed in schedule A Part-IV 5 Total amount of Sch A Sec V (SEWAGE DISPOSAL WORKS) Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in schedule A Part-V 6 Total amount of Sch A Sec VI (AREA DRAINAGE WORKS) Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in schedule A Part-VI 7 Total amount of Sch A Sec VII(ROAD, PATH, CULVERTS AND HARDSTANDING WORKS) Lump sum price worked out by the contractor for ROAD/PATH/CULVERT WORKS as listed in schedule A Part-VII 8 Total amount of Sch A Sec VIII(EXTERNAL WATERSUPPLYWORKS) Lump sum price worked out by the contractor for EXTERNAL WATERSUPPLYWORKS as listed in schedule A Part-VIII. 9 Total amount of Sch A Sec IX( EXTERNAL ELECTRIC SUPPLYWORKS)Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATIONWORKS as listed in schedule A Part-IX. 10 Total amount of Sch A Sec X (FENCING &GATE WORKS) Lump sum price worked out by the contractor for FENCING &GATE WORKS as listed in schedule A Part-X 11 Schedule ASection-XI(Misc Items of Works) Note :This schedule is not pre-priced by MES and the pre-priced rate indicated as Rs 0.00 under Col. 5 siginifies this fact only. 12 ROAD, PATH, CULVERTS AND HARDSTANDING WORKSProviding and laying 80mm thick factory made chamfered edge cement concrete paver block of M-30 grade with approved colour, design & pattern as in footpath, parks, lawns, drive ways or light traffic parking etc., of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of coarse sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver block as per required size and pattern, finishing and sweeping extra sand; complete and all as directed and specified. 13 FENCING &GATE WORKSM&L for Construction of Steel Gate 5.5m wide 2.5m height made out of angle iron square bars gun set plate incl RCC pillars channel wheel track painting steel work with two coats synthetic enamel paint over a coat of primer and two coat of snowcem to RCC pillaars necessary excavation etc complete all as specified and shown on drg. 14 SEWAGE DISPOSAL WORKSM&L for Construction of RCC Septic tank designed to carry sewage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, RCC M-30 Design Mix in Walls , Base Slab , Baffle walls and Roof Slab including beams etc with Vent shaft , manhole openings with cover connection etc., complete with effective depth of 1.5 meter and overall depth of 3 meter for 50 users of Conventional Type. 15 M&L for Construction of Soakage wells excavation, in any type of soil,for 2.4 meters Dia with 3 meters effective Depth offoundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats complete all as specified and directed . 16 INTERNAL ELECTRIFICATION WORKSM&L for modular fan step regulator 2 module, 120 W suitable for BLDC fans complete all as specified and directed. 17 M&L for vertical loadline DB TPN 4 ways double door 415 volts suitable for MCCB TPN as incommer and standard insulated bus bar of suitable size and common neutral link all enclosed in standard sheet flush mounting type including drilling holes for incoming and outgoing cables complete all as specified and directed . 18 M&L for RCBO-A Type (SPN-2 M) 63 Amps 30 mA (in accordance with IS 12640-2 & IEC 61009-1) 240 V/415V, 50 Hz with 10 kA short circuit capacity, RCBO designed for use in domestic, commercial and industrial distribution systems at the most downstream circuit for ensuring protection from leakage current, short circuit & over load to the user for a particular circuit. In normal use, it is safe to use and free of threat to user as well as to environment complete and all as directed and specified. 19 M&L for MCCB TPN, 160 A, 415 V, 16 kA confirms to IEC 60947-II adjustable thermal setting type suitable for TPN vertical loadline DB complete all as specified and directed . 20 M&L for LED bulb 12 Watt, Inverter type, 230 volts AC 50 Hz Retrofit B22 base complete all as specified and directed . 21 EXTERNAL WATER SUPPLY WORKSM&L for jointing of existing GI tubing 80 mm dia for making new conncetion, inserting double flange union pipe including excavation, returning filling complete and all as directed and specified. Near OHT at Pump House 22 M&L valve pitsand constructing of brick masonary pits of internal dimensions 1200mm x1200mm x1000 mm (bottomPCCfloor of the pit should be minimum 30 cms below the bottom surface of sluice valve flange to provide sufficient working space) , bottom floor of the pit be constructed in PCC (1:3:6) 15 cms thick with 20 mm stone aggregate, inner and exposed surfaces and bottom floor of the pit should be plastered in CM (1:4) 15 mm thick. The sluice valve and other fittings should be housed in center of the pit. the vertices of the pit should in right angle and champhered .The top cover of the pit will be made out of MS sheet minimum 2mm thick witth angle iron frame made out of MS angle 50mm x50 mmx 6 mm with galvanised steel hindges two nos ,and locking arrangements duly painted with two coats of water resistant synthetic enamelled paint over one coat of red oxide, complete all as specified and directed.( Near OHT) 23 M & L valve pitsand constructing of brick masonary pits of internal dimensions 900mm x900mm x900 mm ( bottomPCCfloor of the pit should be minimum 30 cms below the bottom surface of sluice valve flange to provide sufficient working space) , bottom floor of the pit be constructed in PCC (1:3:6) 15 cms thick with 20 mm stone aggregate, inner and exposed surfaces and bottom floor of the pit should be plastered in CM (1:4) 15 MM thick. The sluice valve and other fittings should be housed in center of the pit. the vertices of the pit should in right angle and champhered .The top cover of the pit will be made out of MS sheet min 2mm thick witth angle iron frame made out of MS angle 50mm x50 mmx 6 mm with galvanised steel hindges two nos ,and locking arrangements duly painted with two coats of water resistant synthetic enamelled paint over one coat of red oxide, complete all as specified and directed.( Near Stn HQ behind prop Block 04 X DUs of MAJ -01 Nos) 24 EXTERNAL ELECTRIC SUPPLY WORKSTaking down old existing LT UG Cable of size 25 Sqmm 4 core from trench between existing panels all as specified and directed. 25 Supply and fixing LED street light fitting 45 Watt 230 V AC outdoor type with high pressure die cast aluminum hosing and heat resistant complete with driver, lamp bracket with impact and corrosion resistant including thermal management in multiple optics complete with IP 65/66 protection complete all as specified and directed. 26 Material & labour for earthing complete with galvanized steel earth plate electrode 60cm x 60cm x 6.3mm thick buried directly in ground vertically to a depth not less than 2.25 metre below ground level with top edge of the earth plate at a depth not less than 1.5 metre below ground level, earth plate surrounded by 15cm thick and packed with layers of charcoal dust and common salt, earth lead GI wire 4mm dia (8 SWG) connected to GI earth plate electrode by means of bolts, nuts, check nuts and washers of galvanizediron and thimbles and other end of earth wire connected to main switch board and protected by galvanized iron light grade 15mm bore and GI pipe 20mm bore medium grade with funnel and wire mesh for watering including necessary excavation and earth works. PCC chamber in cement concrete (1:3:6) type C-2 using graded stone aggregate and RCC cover in M-25 (Design mix) and all as shown in Electrical Plate No. 3 ofMES Schedule (Part-I) of 2009 complete all as specified and directed. 27 Supply & fixingstreet light pole cable junction box IP-66 size should be not less than 155 x 210 x 92mm (upto Cable Size 10/16sq.mm) with the box made out of thermal plastic(Thermoplastic Polycarbonate) material suitable for 10/16 UG sqmm cable. The JB shall be environment friendly, recyclable, halogen & silicon free, anti acid & anti corrosive,IP 66 in accordance with IEC 60529,Weatherproof UV-resistant, rainwater-proof, temperature-resistant. The impact strength of Polycarbonate enclosure / boards i.e. the Degree of protection against mechanical load shall be in accordance with EN 50298 - 98 for IK 08 including one No. 4 pole connector and one no.MCB SP6Ampand chromium plated clamps, Suitable Cable Gromets and nut bolts complete all accessories and all as specified and directed. 28 Supply & fixing 3 core 1.5 sqmm PVC insulated and FRLSH PVC round sheathed copper conductor flexible 1100 voltsfor connection from cable Junction Box tostreet light fittings complete all as specified and directed. 29 Supply and fixing GI pipe bracket for street light fittings made out of 40 mm dia GI pipe medium grade 1.2 meter long bent to required angle/shape with and2 x pair of MS clamps made out40mm x 5mm MS flat iron bolts,nuts complete including two coat of synthetic enamel paint (first grade) over a coat of red oxide complete all as specified and directed 30 ARBORICULTURE WORKSSupply and planting approved korian carpet grass / lawn grass by dibbling method including weeding out unwanted grass irrigating the area by sprinkling water, spraying of fertilizer and insectisides etc complete all as specified and as directed. 31 Supply and planting approved plants minimum 60 cm high including excavation in post holes 45cm wide and 60cm in deep in soft/loose soil, cleaning of any types of weeds in around the plantation area and filling with approved agriculture soil mixed with fertilizer @0.10 kg for each plant as following complete all as specified and as directed:- 32 Mango (Deshri Mango) 33 Hybrid Lemon 34 Neem 35 Hiviscus (white, blue & yellow) 36 Jasmine Plant 37 kachnar 38 Jackfruit 39 SMART PREPAID METER WORKSSupply installation testing commissioning of smart RF Three Phase ACMeter Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt 865-867 MHz Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. Meter Should support sending the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from mdm/billing software and prepaid features would be MDM / Billing end as per IS 15959 part 2. The meter should support open communication protocol DLMSwith the software, complete all as specified and directed. 40 NOTE FOR ITEM FOR SMART PREPAID METER WORKS:(a) It shall be possible to integrate meter and DCU of any make as approved by GE with software as being provided.(b) It should be possible to run the meter in both prepaid and postpaid mode(c) The meters would carry 10 year warranty.(d) OEM shall to share the Authentication / Encryption keys of the meters along with relevant protocol details with GE. It shall be possible to integrate meter of any make as approved by GE with same DCU software and cloud server as being provided.(e) Qty of smart meters and communication instruments is as follows:-(i) Three Phase cellular meter - 04(ii) The cost of the cellular meter would include 2 years recurring telecom charges. (iii) All RF meters shall be based on MESH TECHNOLOGY (iv) OEM will share meter authentication & encryption passwords for integration with third party software. (f) The proposed 04 Nos of three phase meter shall integrate with the existing DCU(Near by existing Block No P-125,126,127,Md officers qtrs near to Stn HQ Kalka). 41 Supply and Configuration of the Web based Software with following modules:(i) Meter Data Management ModuleThe meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system.The meter data management system would capture and provide the following data:(a) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency(b) Monthly billing survey data for cumulative energy and max demand(ii) Postpaid /Prepaid Billing ModuleThe billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required. 42 (iii) Occupation and Vacation ModuleThe system would support occupation / vacation and billing reports.The software would be collecting data from DCU. The software would provide access to staff as well as the occupant for the data.(iv) Web site: There would be a dedicated website at two places as decided by GE to view all the data and information. Designated users shall have the admin access to the application. Designated user shall also have the access of the key information on an android mobiles app (for admin use).(v) Customer PortalThe system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. 43 (vi) Energy Accounting ModuleThe system would include features of energy accounting. (vii) Communication ModuleThe system would provide communication of energy data and bills via print, email and sms methods. (viii) Meter Master DataThe system would support meter master data repository. The system would support meter replacement process.(ix) Excel ExportThe system would support export of metering and billing data in excel format. 44 (x)Customer Care Module - The software would include a customer care module where the user shall log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution.(xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself.(xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email.(xiii) Integration of different devices of different makes/equipment/software as per functional requirement water charges, furniture charges and licence fees, all as directed. 45 M&L for three phase polycarbonate meter box for fixing of new prepaid meter alongwith all fixing accessories including fixing the box in wall front opening door alongwith locking system all as specified and as directed.Note:-(a) Box size should be suitable for item described at Sr No. 2. (b) Box shall be suitable for IP-65 protection. It shall be made from polycarbonate with glass fibre reinforced material.(c) Degree of protection for mechnical load shall be IK08 as per EN50298.(d) Box should be fire retardant and self extinguishing. It shall have internally embedded extruded silicon gasket.(e) Color code of Box shall be as per Ral 9011/7035.(f) Any make as per specification given can be supplied.(g) Clamp for fixing of Box shall be of SS-304. Screws to be used shall also be of SS-304. 46 PHASE-II (DURING DEFECT LIABILITY PERIOD OF TWO YEARS)Comprehensive Maintenance including operating during defect liability period for AMI System. This include the following items:(a) Monthly sim charges for the DCU/ meters. The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would liaise with telecom service providers for necessary resolution.(b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts.(c) This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes. 47 (d) Changes in the tariff structure. The tariff structure changes may require software upgradation. The same would be included in the AMC scope of work.(e) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc.(f) Reports Development - The additional reports as needed for the success of the project would be developed(g) Software installation on any alternate / backup server if required(h) The communication network monitoring and support(i) Configuration of the repaired / replaced hardware in the system(j) Trouble shooting and necessary actions to run the system as required.(k) Software bug fixing as and when required. (l) Broandband charges alongwith telecom charges may be included quotedby the contractor within overall cost.(m) One skilled person well equipped with knowledge of complete system per day including holidays. 48 For 1st 11 months (0-11 Months) of 02 Yrs 49 For 2nd 11 months (12-22 Months) of 02 Yrs 50 For balance 2 months (23 - 24 Months) of 02 Yrs