Tender For Special Repairs To Km 0/0-4/0 Of Chinnampalli - Mekalachinnampalli Road (Slm-115); 1 Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work andincluding all other incidental charges etc., complete as per clause 111, 112, 202, 305.4.3, 900 of MORTH -Vth Revision 2 Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250 mm thick, including pre-mixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/Base course on well-prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5. 3 Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5 4 Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per 111, 112, 501, 503 & 900 of MORTH Vth Revision 5 Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5. 6 Providing, laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20 mm, 0.43 cum of 13.20-2.36 mm and 0.08 cum of 2.36 mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for pre-mixing per 10 sqm, including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and consolidating by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5 - Grading II (Table 500-7) 7 Providing and laying Bituminous Concrete to 30/ 40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross-sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause111, 112, 501, 507 & 900 of MORTH Rev-5 (Grading-II) 8 Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance of lead 1 Km 9 Calculation of SubTotal, GST and Total Amount carried out by system automatically 10 Basic cost of value put to tender as per estimate 11 Add GST at 18% 12 Total Value put to Tender 13 Negotiated Percentage 14 Final Negotiated Value 15 Add GST at 18% of Final Negotiated Value 16 Total Value of Contract Including 18% of GST 17 Basic cost of value put to tender as per Estimate 18 Quoted Rate in Figures (Total Value of Contract Including 18% of GST )