| 1 | Construction of Pre-Fab Steel Structure Terminal Building, Pre-Engineered ATC Tower, Pre-Engineered Fire Station and other associated Buildings along with Kerb area,Operational Boundary Wall with entry, exit gate for segregation of airside and city side area, ESS Buildings (Substation), Overhead Water Tank, Underground Sump, Parking facility for cars and two-wheeler vehicles with Toilets (Gents\", Ladies and Accessible) with Site development, site survey, siteinvestigations, Earth Work, RCC / Composite Steel Structure/Steel Structure, Double skinned insulated standing seam Zincalume roofing system for outer skin roofing over M.S. Truss, External Wall with Double skinned sandwich Panel, Brick Work / AAC Block work, Aluminum / Glazed façade, Stainless Steel Railings, Cladding works as per interior wall finishes, Flooring, False Ceiling interior and exterior, Partition, Interior Works and furniture i.e. Check In Counters, indoor planters, ladies frisking booth, frisking pedestal, stamping table, Sanitary fittings and fixtures, Plumbing and Water Supply works, Drainage system, Landscaping (Soft and Hard),Fountain, Pavers and kerbs, Road work (City side and Airside), Septic Tank & Soak Pit, Internal & External Electrification, Lighting (Internal & External), Power Supply System including Substation Equipment like HT Panel, Transformer, etc. and DG sets with storage system , LT Panel, APFC Panel, Lightening Protection System(LPS), Uninterruptible Power Supply (UPS), VRV/VRF & split AC, Automatic Sliding Doors, Air curtain, Fire Hydrant System, Fire Extinguisher, Automatic addressable Fire Alarm Detection System, Automatic room flooding fire suppression system,Internal & External Illuminated Way Finding Signages and Emergency escape signages, PA system, Water Treatment Plant (WTP) ,Automatic Jet Hand dryers, High Mast Lighting, sanitary Napkin Vending machine with incinerator, Drinking water fountain water cooler with RO, Baby diaper changing station, Baby Protection Safety Chair, IT system{Passive (SCS) & Rack and Active(ANS & Server)} etc., Airport Systems (FIDS ,SCCTV & IP EPABX) etc. as per drawings, Specifications, DBR, Scope, Codes and Practices and all other requirements as contained in tender document. The detailed design of facilities shall confirm to standard specified by ICAO, DGCA, AAI, MORTH, IRC, NBC, CPWD, IS, IEC, ECBC etc. wherever required and in conformity with ATM/CNS/IMD regulations regarding permissible heights, locations requirements etc. i/c all other works covered under Scope of work and meeting all relevant statutory requirements i/c optimization of energy efficiency complete as required. Scope of work shall also cover DLP of 02 years after actual completion of work thereafter Note: The bidder shall quote the offer excluding GST, ESI & PF (Employer’s Contribution). |