Tender For Work For Shifting,Loading, Carriage,Unloading,Dismentling & Erection Of Equipments At Various Substation Under Etd-Ghazipur - Safes shifting & loading of miscellaneous equipments such as. 220KV CT, 220KV PT, 145KV CT, 145KV PT, 198KV LA & 120KV LAwith the help by crane on private vehicle at any Sub Station periphery of 50 Km under ETC-II Varanasi. 2 Safes shifting & loading of miscellaneous equipments such as. 36KV VCB, 36KV CT, 36KV PT (It will also include carraige of Capacitor Cells, Control Cable etc.) with the help by crane or Man power on private vehicle at any Sub Station periphery of 50 Km under ETC-II Varanasi. 3 Safe carraige of miscellaneous equipments such as. 220KV CT, 220KV PT, 145KV CT, 145KV PT, 198KV LA, 120KV LA, 36KV CT, 36KV PT and 36KV VCB on private vehicle at any Sub Station periphery of 50 Km under ETC-II Varanasi. 4 Safes Unloading & stacking of miscellaneous equipments such as. 220KV CT, 220KV PT, 145KV CT, 145KV PT, 198KV LA & 120KV LA with the help by crane from private vehicle at any Sub Station periphery of 50 Km under ETC-II Varanasi. 5 Safes Unloading & stacking of miscellaneous equipments such as. 36KV VCB, 36KV CT & 36KV PT(It will also include carraige of Capacitor Cells, Control Cable etc.) with the help by crane or Man power from private vehicle at any Sub Station periphery of 50 Km under ETC-II Varanasi. 6 Dismantling of damage and defective 36KV VCB ofvarious substation under ETD-Ghazipur as per instruction manual of equipments and technical specification.The workincludingcutting of bothearthing, removing 06 Nos jumper ,opening of all electrical wiring, removing cable from cubical box and then safely remove it from their structure ,dismantle of its structure then shifting the Damage VCB from site to store. Includig all other associated work to complete the job Satisfactory. (Hydra/crane provided by the contractor for completion of job). 7 Erection of new 36 KVVCB at various substation under ETD-Ghazipur as per instruction manual of equipments and technical specification.The workincluding erection/modification of structure ,leg andfoundation, shifting of new VCB and other materials from store to work site then erection on its structure,fixing of 06 Nos. jumpers,clamp, jointing the earthing and fixing of all control cable, termination of all electrical wiring as per drawing then testing of open/close operation from local/remote/protection tripping andincludig all other associated work to complete the job Satisfactory. (Hydra/crane provided by the contractor for completion of job). 8 Dismentalling of 36 KVC.T/P.T at various substation under ETD-Ghazipur. The work including opening of jumpers, cutting of earthing, opening of all electrical wiring then safely remove itfrom their structure and then shifting the Damage 36 kv CT/P.Tfrom site to store all other associated work to complete the job with the help of hydra/crane. The including cost of labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 9 Erection of healthy 36 KV CT/P.T at various substation under ETD-Ghazipur. The including work safe shifting from sectional store to work site, Erection on their structure, Earthing of CT/P.T from two places, jumpering, re-connection of all opened electrical wiring, jointing the earthing then testing its continuty from feild side to panel side and all other associated work to complete the job.The including cost labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 10 Dismentalling of 145 KVCT/P.T at various substation under ETD-Ghazipur. The including work opening of jumpers, cutting of earthing, opening of all electrical wiring then safely remove from their structure andthen shifting the Damage 145 KV CT/P.Tfrom site to store all other associated work to complete the job with the help of hydra/crane. The including cost of labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 11 Erection of healthy 145 KV CT/P.T at various substation under ETD-Ghazipur. The including work safe shifting from sectional store to work site, Erection on their structure, Earthing of CT/PT from two places, jumpering, re-connection of all opened electrical wiring then testing its continuty from feild side to panel side and all other associated work to complete the job.The including cost labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 12 Dismentalling of 120KV LA at various substation under ETD-Ghazipur. The including work opening of 01 Nos jumpers from one side, cutting of earthing, opening of all electrical wiring then safely remove from their structure and then shifting the damage 120KV LA from site to store.All other associated work to complete the job with the help of hydra/crane. The including cost of labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 13 Erection of healthy 120KV LA at various substation under ETD-Ghazipur. The including work safe shifting from sectional store to work site, Erection on their structure, Earthing of 120KV LA from two places, 01 Nos jumpering from one side, re-connection of all opened electrical wiring then testing its continuty from feild side to panel side and all other associated work to complete the job.The including cost labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 14 Dismentalling of 245 KVCT. at various substation under ETD-Ghazipur. The including work opening of 02 Nos jumpers from both side, cutting of earthing, opening of all electrical wiring then safely remove from their structure andthen shifting the Damage 245 KV CTfrom site to store all other associated work to complete the job with the help of hydra/crane. The including cost of labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 15 Erection of healthy 245 KV CT at various substation under ETD-Ghazipur. The including work safe shifting from sectional store to work site, Erection on their structure, Earthing of CT from two places, 02 Nos jumpering from both side, re-connection of all opened electrical wiring then testing its continuty from feild side to panel side and all other associated work to complete the job.The including cost labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 16 Dismentalling of 245KVPT/198KV LA at various substation under ETD-Ghazipur. The including work opening of 01 Nos jumpers from one side, cutting of earthing, opening of all electrical wiring then safely remove from their structure and then shifting the Damage 245KV PT/ 198KV LAfrom site to store.All other associated work to complete the job with the help of hydra/crane. The including cost of labour and T&P charges. (Hydra/crane provided by the contractor for completion of job). 17 Erection of healthy 245 KV PT/ 198KV LA at various substation under ETD-Ghazipur. The including work safe shifting from sectional store to work site, Erection on their structure, Earthing of CT from two places, 01 Nos jumpering from one side, re-connection of all opened electrical wiring then testing its continuty from feild side to panel side and all other associated work to complete the job.The including cost labour and T&P charges. (Hydra/crane provided by the contractor for completion of job).