| 1 | Disconnection from LT panel taking out the installed A.C.B from the panel, removing defective parts of A.C.B. & from the metering section of Panel. |
| 2 | Air circuit breaker 800 Amp.50 ka 3 Pole MDO 415V microprocessor release. Make: L&T |
| 3 | MCB Single pole 6Amp. Make L&T |
| 4 | Under voltage trip unit. Make: L&T |
| 5 | Digital Amp. Meter. Make L&T |
| 6 | Digital Volt Meter 0-500V. Make L&T |
| 7 | Arcing contact. Make: L&T |
| 8 | Indicating lights LED type RYB& On/off. Make : L&T |
| 9 | Motor protection relay. Make L&T |
| 10 | Making of outgoing/incoming bus bar links for main & cable connection duly sleeve with heat shrinkable PVC sleeve. |
| 11 | Retrofitting of ACB (800A, 3 Pole) as above in existing panel by carrying out following works :- 1) • Supply of necessary hardware, supports etc. 2) • Making /supply of M.S angle base frame/supports of size as suitable to the mounting of new ACB. Fixing of the same at the panel chamber with the help of nuts bolts /welding etc. as suitable for installation of new ACB /their cradles. 3) • Dismantling the existing circuit breaker from the chambers of the LT panel including its cradles and disconnecting the bus bar connections with the main bus bars, disconnecting the outgoing cables etc. 4)Installation of new ACB cradle in the panel by the help of nuts bolts etc in proper alignment for connecting the bus bars. Fixing the ACB in the cradles in the proper condition including checking the movement. Making control wiring connections for the ACBs. 5) • Connecting the main bus bars to the incoming sides of the ACB by re-arrangement /modification/addition of bus bar lengths in Aluminum construction for retrofitting of ACB. 6) making a new M.S. door or modificationin 2 mm CRCA Sheet, powder coated as suitable size to match symmetry, Connecting the bus bar at the outgoing side of the ACB by re-arrangement/ modification/addition of bus bar lengths in Aluminum for retrofitting of ACB. |
| 12 | Calibration of Protection relays having sensitive earth fault, over current, S/Cprotection with following features - High setelements, highly immune to harmonics, both 1A & 5A CT input in one relay, 6 output contacts. Make: L&T |
| 13 | Cleaning of complete ACB of installed as incomer & Bus coupler. in panel 2000 Amp., removal of old grease and re-greasing of all movable parts with recommended grease, setting of tripping mechanism, re-wiring ofunder voltage coil, complete servicing of ACB Fixing ofcomponents in place of defective components as required complete with control wiring & re-installation of A.C.B. in existing LT Panel complete with all incoming & outgoing cable connection with thimbling |
| 14 | Cleaning of complete ACB of installed as outgoing feeder in panel 800 Amp., removal of old grease and re-greasing of all movable parts with recommended grease, setting of tripping mechanism, re-wiring of under voltage coil, complete servicing of ACB Fixing of components in place of defective components as required complete with control wiring, & re-installation of A.C.B. in existing LT panel complete with all incoming & outgoing cable connection with thimbling. |
| 15 | Fixing of Ampere Meter, indicating lights, under voltage, relay etc., complete with wiring etc. |
| 16 | Testing & commissioning of panel & allied accessoriesas per required parameters with relevant IS .Testing of the panel prior to switching on as follow i) Continuity and earth testingii) Meggaring of all equipment for phase to phase, neutral to body, neutral to earth and phase to earth. |