| 1 | Disconnected the electricity supply from EOT crane by electrician and making the re-connection after complete the repairing work. |
| 2 | Dismantling of EOT Crane from the upper I Section beam by cutting and removing of pin shaft from the holding system and cutting of other nut bolts with the help of gas cutter required tools & tackles and taking the EOT crane at ground carefully by chain pulley block, man power and other handling equipment as per site requirements. |
| 3 | Dismantling of internal moveable parts of EOT Crane like gear box and motor, bearing with bracket, brake system, wire rope, drum, limit switch, panel and other parts by cutting of nut bolts with the help of gas cutter required tools & tackles as per site requirements. |
| 4 | Replacement of SS wire Rope for 2 ton capacity hoist. (100% full length) Make: - Reva. |
| 5 | Replacement of Gear box input pinion for 2 ton capacity hoist. Make: - Reva. |
| 6 | Replacement of Gear box input pinion for 3 ton capacity hoist. Make: - Reva. |
| 7 | Replacement of Rope guide & Rope tighter for 2 ton capacity hoist. Make: - Reva. |
| 8 | Replacement of Rope guide & Rope tighter for 3 ton capacity hoist. Make: - Reva. |
| 9 | Replacement of bottom hook block assembly for 3 ton capacity hoist. Make: - Reva. |
| 10 | Replacement of oil seal for 2 ton capacity hoist. Make: - Reva. |
| 11 | Replacement of oil seal for 3 ton capacity hoist. Make: - Reva. |
| 12 | Supply of nut bolts with washer of various size. |
| 13 | Repairing of drum of 2 ton hoist by making bearing sheet on both side shaft of drum with complete remettling, machining and replacement of new bearing (no. 22218)as per existing size. The job includes dismantling and assembling charges of drum in the EOT Crane. Making zero zero alignment of drum with EOT for smooth running without any sound also includes the charges of final machining cut of drum for making the balancing for avoid the vibration. Bearing:- SKF/FAG. |
| 14 | Repairing of gear box of EOT Crane by dismantling removing of all gear making bearing sheet in the shaft and gear on both side by machining work. Including the charges of lubricants/oiling and greasing for smooth working without unnecessary sound. The job includes making the threads in housing for tightly fixing of cover. |
| 15 | Repairing of hook block of 2 ton capacity hoist by dismantling and removing of internal parts, replacement of bearing, making bearing seat on the pin shaft on both side by remetling and machining work. |
| 16 | Fixing of EOT and all dismantled moveable parts on the upper I section beam by using of chain pulley block and handling equipments with carefully safety arrangement and making the proper balancing with alignment for smooth working with the help of required tools & tackles i/c nut bolts & washer. |
| 17 | Repairing of mechanical system by removing of old defective/damaged parts and providing/fixing of new parts same as per existing. Making and fixing of upper side and lower new hook arrangement with pin shaft for wire rope with proper strengthening, providing and fixing of new plate by using of nut bolts required tools and tackles. Making proper leveling for smooth working. The job includes cutting, welding, grinding and finishing as per site requirement. |
| 18 | Repairing of existing tin shed by providing and fixing of new profile sheet with screw and worn out support for strengthening including of welding work at broken joint as per site requirement. |
| 19 | Repairing of main panel by replacement of burnt wiring and replacement of contactor, Making complete electric connection of EOT Crane. |
| 20 | Testing & commissioning of complete system on full load. |
| 21 | Transport charges for tools & tackles and new supplied spare parts. |
| 22 | Old material rebate. |