Power Boards / Undertakings / PSU Closing in 0 days TDR #51566564

Tender For Supply And Work For Construction Of 01 No. 220 Kv Bus Coupler Bay(Ais) At 220 Kv S/S Modipuram Under Etd Merut To Be Temporarily Used As Feeder Bay For Giving Supply To M/S Ncrtc. - Ms Round Bar (40 Square Mm) 3 Earthing Strip 75X10 Sq.Mm 4

Issued by Boards / Undertakings / PSU · meerut, Uttar Pradesh
Tender Value
24.78 Lakhs
Estimated cost
Bid Submission
09 Oct 2025
0 days left
EMD
19000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
meerut → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Supply And Work For Construction Of 01 No. 220 Kv Bus Coupler Bay(Ais) At 220 Kv S/S Modipuram Under Etd Merut To Be Temporarily Used As Feeder Bay For Giving Supply To M/S Ncrtc. - MS Round Bar (40 Square mm) 3 Earthing Strip 75x10 Sq.mm 4 Earthing Strip 50x6 Sq.mm 5 Earthing Strip 25x6 Sq.mm 6 ACSR single Tension fitting forZebra Conductor suitable for1 x16 No Discinsulatorand hardware set as per technical specification. 7 Bolted type single Tension fitting forsingle ZebraConductor suitable for1 x16 No Discinsulator without turn buckle and hardware set as per technical specification. 8 Bolted type single Suspension fitting for single Zebra Conductor Suitable for1x16No Disc insulator with hardware set as per technical specification. 9 4 Bolted Type PG clamp suitable for Zebra to Zebra Conductor Complete with HDG nut bolt & washer as per technical specification. 10 LED Flood light 150Watt with pipe, clamp & junction box with 6Amp MCB. 11 75mm GI Perforated Tray for supporting control cables 12 225mm GI Perforated Tray for supporting control cables 13 HDG Bolt ,with nut & washer, GI,M 16x45 mm 14 HDG Bolt ,with nut & washer, GI,M 16x55 mm 15 HDG Bolt ,with nut & washer, GI,M 16x65 mm 16 WORK PART:- 17 Earthmat Extension: - 18 Laying of 40mm dia MS round bar 700 mm below the ground level by the cutting straightening welding painting excavation of trench back filling of trench after laying of earth mat including shifting of M S round bar from store place at the Sub-Station to switchyard. 19 Fabrication of 3 Meter long electrodes with 40 mm dia MS round bar having 150 mm long conical shape by digging cutting, straightening etc. and then placing it vertical inside the ground with Top 700mm below the ground level including shifting of MS round bar from storage place at the Sub-Station to switchyard. 20 Making a cross joint of above laid 40 mm dia MS round bar 700 mm below the ground level by due welding at all 4 corners including welding of suitable size 2 No MS angle pieces on opposite corners of the cross joint. 21 Making of end joint of above laid 40 mm dia MS round bar with Top of the already vertically pierced MS electrodes 700mm below the ground level by due welding. 22 Making of 300mm long lap joint of above already laid round bar to connecting existing earth mat of the Sub-Station. 23 Erection of Main & Auxiliary structure lattice type DTM, BXM, XMM, YPMBCT,BTI, CLI etc. The job consistof shifting of all material from store to site of erection, erection of structure as perdrawing with the help of GI nut & bolt, flat & spring washer, matching the hole, cutting & matching of member if required including cost of all men and T & P including GI structure Nut & bolt to complete the work. including making hole in main & auxiliary structure if requiredupon foundation and its proper tightening. 24 Erection of 245 KV Circuit Breaker 25 Erection of 245 KV,1250ALine Isolator with one earth switch central break (Manual) 26 Erection of 245 KV Current Transformer 27 Erection of 245 KV Potential Transformer 28 Erection and mounting of 245 KV CT/PT Junction Box. 29 Erection of 220 KV Double Feeder Control Panel as per technical specification. 30 Erection of 220 KVRelay Panel (DPP) for Line as per technical specification. 31 Earthing of equipment’s by cutting straightening, bending, laying 700 mm below ground and above ground of following size of MS flat for earthing of main and auxiliary structure, equipment’s structure including welding with main earthmat and with object to be earthed. Excavation of trenches, its back filling and all other associated work as required to complete the work. Work also including painting of MS flat of different size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work. 32 MS Flat of size 75x10 mm 33 MS Flat of size 50x6 mm 34 MS Flat of size 25x6 mm 35 Pianting of MS flat of differennt size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work. 36 MS Flat of size 75x10 mm 37 MS Flat of size 50x6 mm 38 MS Flat of size 25x6 mm 39 Stringing of various Jack Busof220 KV of all 03 Phases,with different type conductor and different length of span as mentioned below. The work includes cutting, bending & compressionof conductor, fixing of single tension fitting Hoisting of disc insulator with tower to tower / gentry to gentry and shifting of material from store site to erection site and all other associated work to complete the work satisfactorily as per drawing and technical specification. 40 220 KV Jack Bus of Zebraconductor of 54/72 mtrs span 41 ACSRSingle Zebra conductor jumper with connection all equipments and associated bay. 42 Laying of following size control cable in trench/cable trays from different control room equipments to 220 KV CB, CT,CVT and their junction boxes,cubicle box, isolators box and other outdoor equipments installed in 220 switch yard as per cable schedule including carriage of cable drum from store and all other associated work with including Tag marking of cable every 25 meters & ferrulling with cable schedule of both end. 43 2 core x 2.5 mm2 44 4 core x 2.5 mm2 45 6 core x 2.5 mm2 46 10 core x 2.5 mm2 47 Termination of following sizes of cable as laid and as per cable schedule including making necessary hole in laid plates or box wherever required, fixing cable glands of appropriate sizeand ferruling of each core and other associated work to complete the job satisfactroly. Rates of termination of control cables including the all cores of cable and one end. Gland & ferruls supplied by the contractor. 48 2 core x 2.5 mm2 49 4 core x 2.5 mm2 50 6 core x 2.5 mm2 51 10 core x 2.5 mm2 52 Integration of 220 KV bays with existing Bus Bar Protection 53 Configuration and testing for integration of 220 KV Bays in existing ERL make Bus bar protection at 220 KV S/S Modipuram, Meerut work also include (a) Necessary wiring will be checked as per the protection scheme required for ERL make bus bar. (b) Relay signals will be checked in MCU as per the scheme required (c) Relay configuration work will be done in Bus bar Main Unit (MCU) (d) Firmware updation will be done in Bus bar Relay.

BOQ

Name of Work: Supply andWork for construction of 01 No. 220 KV Bus Coupler Bay(AIS) at 220 KV S/S Modipuram Under ETD MERUT to be Temporarily used as feeder bay for giving supply to M/s NCRTC.
Sl. No. Item Description
1SUPPLY PART:-
2MS Round Bar (40 Square mm)
3Earthing Strip 75x10 Sq.mm
4Earthing Strip 50x6 Sq.mm
5Earthing Strip 25x6 Sq.mm
6ACSR single Tension fitting forZebra Conductor suitable for1 x16 No Discinsulatorand hardware set as per technical specification.
7Bolted type single Tension fitting forsingle ZebraConductor suitable for1 x16 No Discinsulator without turn buckle and hardware set as per technical specification.
8Bolted type single Suspension fitting for single Zebra Conductor Suitable for1x16No Disc insulator with hardware set as per technical specification.
94 Bolted Type PG clamp suitable for Zebra to Zebra Conductor Complete with HDG nut bolt & washer as per technical specification.
10LED Flood light 150Watt with pipe, clamp & junction box with 6Amp MCB.
1175mm GI Perforated Tray for supporting control cables
12225mm GI Perforated Tray for supporting control cables
13HDG Bolt ,with nut & washer, GI,M 16x45 mm
14HDG Bolt ,with nut & washer, GI,M 16x55 mm
15HDG Bolt ,with nut & washer, GI,M 16x65 mm
16WORK PART:-
17Earthmat Extension: -
18Laying of 40mm dia MS round bar 700 mm below the ground level by the cutting straightening welding painting excavation of trench back filling of trench after laying of earth mat including shifting of M S round bar from store place at the Sub-Station to switchyard.
19Fabrication of 3 Meter long electrodes with 40 mm dia MS round bar having 150 mm long conical shape by digging cutting, straightening etc. and then placing it vertical inside the ground with Top 700mm below the ground level including shifting of MS round bar from storage place at the Sub-Station to switchyard.
20Making a cross joint of above laid 40 mm dia MS round bar 700 mm below the ground level by due welding at all 4 corners including welding of suitable size 2 No MS angle pieces on opposite corners of the cross joint.
21Making of end joint of above laid 40 mm dia MS round bar with Top of the already vertically pierced MS electrodes 700mm below the ground level by due welding.
22Making of 300mm long lap joint of above already laid round bar to connecting existing earth mat of the Sub-Station.
23Erection of Main & Auxiliary structure lattice type DTM, BXM, XMM, YPMBCT,BTI, CLI etc. The job consistof shifting of all material from store to site of erection, erection of structure as perdrawing with the help of GI nut & bolt, flat & spring washer, matching the hole, cutting & matching of member if required including cost of all men and T & P including GI structure Nut & bolt to complete the work. including making hole in main & auxiliary structure if requiredupon foundation and its proper tightening.
24Erection of 245 KV Circuit Breaker
25Erection of 245 KV,1250ALine Isolator with one earth switch central break (Manual)
26Erection of 245 KV Current Transformer
27Erection of 245 KV Potential Transformer
28Erection and mounting of 245 KV CT/PT Junction Box.
29Erection of 220 KV Double Feeder Control Panel as per technical specification.
30Erection of 220 KVRelay Panel (DPP) for Line as per technical specification.
31Earthing of equipment’s by cutting straightening, bending, laying 700 mm below ground and above ground of following size of MS flat for earthing of main and auxiliary structure, equipment’s structure including welding with main earthmat and with object to be earthed. Excavation of trenches, its back filling and all other associated work as required to complete the work. Work also including painting of MS flat of different size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work.
32MS Flat of size 75x10 mm
33MS Flat of size 50x6 mm
34MS Flat of size 25x6 mm
35Pianting of MS flat of differennt size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work.
36MS Flat of size 75x10 mm
37MS Flat of size 50x6 mm
38MS Flat of size 25x6 mm
39Stringing of various Jack Busof220 KV of all 03 Phases,with different type conductor and different length of span as mentioned below. The work includes cutting, bending & compressionof conductor, fixing of single tension fitting Hoisting of disc insulator with tower to tower / gentry to gentry and shifting of material from store site to erection site and all other associated work to complete the work satisfactorily as per drawing and technical specification.
40220 KV Jack Bus of Zebraconductor of 54/72 mtrs span
41ACSRSingle Zebra conductor jumper with connection all equipments and associated bay.
42Laying of following size control cable in trench/cable trays from different control room equipments to 220 KV CB, CT,CVT and their junction boxes,cubicle box, isolators box and other outdoor equipments installed in 220 switch yard as per cable schedule including carriage of cable drum from store and all other associated work with including Tag marking of cable every 25 meters & ferrulling with cable schedule of both end.
432 core x 2.5 mm2
444 core x 2.5 mm2
456 core x 2.5 mm2
4610 core x 2.5 mm2
47Termination of following sizes of cable as laid and as per cable schedule including making necessary hole in laid plates or box wherever required, fixing cable glands of appropriate sizeand ferruling of each core and other associated work to complete the job satisfactroly. Rates of termination of control cables including the all cores of cable and one end. Gland & ferruls supplied by the contractor.
482 core x 2.5 mm2
494 core x 2.5 mm2
506 core x 2.5 mm2
5110 core x 2.5 mm2
52Integration of 220 KV bays with existing Bus Bar Protection
53Configuration and testing for integration of 220 KV Bays in existing ERL make Bus bar protection at 220 KV S/S Modipuram, Meerut work also include (a) Necessary wiring will be checked as per the protection scheme required for ERL make bus bar. (b) Relay signals will be checked in MCU as per the scheme required (c) Relay configuration work will be done in Bus bar Main Unit (MCU) (d) Firmware updation will be done in Bus bar Relay.

AI Tender Summary

OUR REF NO 51566564
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 24.78 Lakhs
LAST DATE 09-10-2025
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Tender For Supply And Work For Construction Of 01 No. 220 Kv Bus Coupler Bay(Ais) At 220 Kv S/S Modipuram Under Etd Merut To Be Temporarily Used As Feeder Bay For Giving Supply To M/S Ncrtc. - MS Round Bar (40 Square mm) 3 Earthing Strip 75x10 Sq.mm 4 Earthing Strip 50x6 Sq.mm 5 Earthing Strip 25x6 Sq.mm 6 ACSR single Tension fitting forZebra Conductor suitable for1 x16 No Discinsulatorand hardware set as per technical specification. 7 Bolted type single Tension fitting forsingle ZebraConductor suitable for1 x16 No Discinsulator without turn buckle and hardware set as per technical specification. 8 Bolted type single Suspension fitting for single Zebra Conductor Suitable for1x16No Disc insulator with hardware set as per technical specification. 9 4 Bolted Type PG clamp suitable for Zebra to Zebra Conductor Complete with HDG nut bolt & washer as per technical specification. 10 LED Flood light 150Watt with pipe, clamp & junction box with 6Amp MCB. 11 75mm GI Perforated Tray for supporting control cables 12 225mm GI Perforated Tray for supporting control cables 13 HDG Bolt ,with nut & washer, GI,M 16x45 mm 14 HDG Bolt ,with nut & washer, GI,M 16x55 mm 15 HDG Bolt ,with nut & washer, GI,M 16x65 mm 16 WORK PART:- 17 Earthmat Extension: - 18 Laying of 40mm dia MS round bar 700 mm below the ground level by the cutting straightening welding painting excavation of trench back filling of trench after laying of earth mat including shifting of M S round bar from store place at the Sub-Station to switchyard. 19 Fabrication of 3 Meter long electrodes with 40 mm dia MS round bar having 150 mm long conical shape by digging cutting, straightening etc. and then placing it vertical inside the ground with Top 700mm below the ground level including shifting of MS round bar from storage place at the Sub-Station to switchyard. 20 Making a cross joint of above laid 40 mm dia MS round bar 700 mm below the ground level by due welding at all 4 corners including welding of suitable size 2 No MS angle pieces on opposite corners of the cross joint. 21 Making of end joint of above laid 40 mm dia MS round bar with Top of the already vertically pierced MS electrodes 700mm below the ground level by due welding. 22 Making of 300mm long lap joint of above already laid round bar to connecting existing earth mat of the Sub-Station. 23 Erection of Main & Auxiliary structure lattice type DTM, BXM, XMM, YPMBCT,BTI, CLI etc. The job consistof shifting of all material from store to site of erection, erection of structure as perdrawing with the help of GI nut & bolt, flat & spring washer, matching the hole, cutting & matching of member if required including cost of all men and T & P including GI structure Nut & bolt to complete the work. including making hole in main & auxiliary structure if requiredupon foundation and its proper tightening. 24 Erection of 245 KV Circuit Breaker 25 Erection of 245 KV,1250ALine Isolator with one earth switch central break (Manual) 26 Erection of 245 KV Current Transformer 27 Erection of 245 KV Potential Transformer 28 Erection and mounting of 245 KV CT/PT Junction Box. 29 Erection of 220 KV Double Feeder Control Panel as per technical specification. 30 Erection of 220 KVRelay Panel (DPP) for Line as per technical specification. 31 Earthing of equipment’s by cutting straightening, bending, laying 700 mm below ground and above ground of following size of MS flat for earthing of main and auxiliary structure, equipment’s structure including welding with main earthmat and with object to be earthed. Excavation of trenches, its back filling and all other associated work as required to complete the work. Work also including painting of MS flat of different size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work. 32 MS Flat of size 75x10 mm 33 MS Flat of size 50x6 mm 34 MS Flat of size 25x6 mm 35 Pianting of MS flat of differennt size after cleaning of rusted surface 1st coat of Red Oxide and 2 coat of Bus Green Paint to complete the work. 36 MS Flat of size 75x10 mm 37 MS Flat of size 50x6 mm 38 MS Flat of size 25x6 mm 39 Stringing of various Jack Busof220 KV of all 03 Phases,with different type conductor and different length of span as mentioned below. The work includes cutting, bending & compressionof conductor, fixing of single tension fitting Hoisting of disc insulator with tower to tower / gentry to gentry and shifting of material from store site to erection site and all other associated work to complete the work satisfactorily as per drawing and technical specification. 40 220 KV Jack Bus of Zebraconductor of 54/72 mtrs span 41 ACSRSingle Zebra conductor jumper with connection all equipments and associated bay. 42 Laying of following size control cable in trench/cable trays from different control room equipments to 220 KV CB, CT,CVT and their junction boxes,cubicle box, isolators box and other outdoor equipments installed in 220 switch yard as per cable schedule including carriage of cable drum from store and all other associated work with including Tag marking of cable every 25 meters & ferrulling with cable schedule of both end. 43 2 core x 2.5 mm2 44 4 core x 2.5 mm2 45 6 core x 2.5 mm2 46 10 core x 2.5 mm2 47 Termination of following sizes of cable as laid and as per cable schedule including making necessary hole in laid plates or box wherever required, fixing cable glands of appropriate sizeand ferruling of each core and other associated work to complete the job satisfactroly. Rates of termination of control cables including the all cores of cable and one end. Gland & ferruls supplied by the contractor. 48 2 core x 2.5 mm2 49 4 core x 2.5 mm2 50 6 core x 2.5 mm2 51 10 core x 2.5 mm2 52 Integration of 220 KV bays with existing Bus Bar Protection 53 Configuration and testing for integration of 220 KV Bays in existing ERL make Bus bar protection at 220 KV S/S Modipuram, Meerut work also include (a) Necessary wiring will be checked as per the protection scheme required for ERL make bus bar. (b) Relay signals will be checked in MCU as per the scheme required (c) Relay configuration work will be done in Bus bar Main Unit (MCU) (d) Firmware updation will be done in Bus bar Relay.
Basic Detail
Tender No T-13/25-26/ETC/MT
Bidding Type Tender
Location
City meerut
State Uttar Pradesh
Key Dates
Publish Date 03 Oct 2025
Submission Date 09 Oct 2025
Open Date 10 Oct 2025
Finance
Tender Value 24.78 Lakhs
Tender Fee 590
EMD 19000
Exemption Not Available
Document List
tenderdoc13.pdf
Tendernotice_1.pdf
0657743b-e4d2-4fcb-b87b-88a7f22d93c4.html
BOQ_1974817.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 03, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 09, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 10, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

tenderdoc13.pdf

pdf

Tendernotice_1.pdf

html

0657743b-e4d2-4fcb-b87b-88a7f22d93c4.html

xls

BOQ_1974817.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders