|
| 1 | SCHEDULE `A\" PART -I (Overhauling of 20 KVA Kirloskar Genr at Nampisha COB (8 AR)) |
| 2 | Replacement of Main Bearing |
| 3 | Replacement of CR Bearing |
| 4 | Replacement of piston Ringset |
| 5 | Replacement of Piston |
| 6 | Replacement of Linner |
| 7 | Replacement of Valve Hole Grinding, Fitting Complete |
| 8 | FIP Servicing |
| 9 | Nozzle Servicing |
| 10 | Air Cleaner |
| 11 | Fuel Fitter |
| 12 | Oil Fitter |
| 13 | Gasket Kit |
| 14 | Fan Belt, Horse Pipe |
| 15 | Mechanic Overhauling Charge |
| 16 | SCHEDULE `A\" PART -II (Overhauling of 15 KVA Kirloskar Genr at Phaikoh COB (8 AR)) |
| 17 | Replacement of Main Bearing |
| 18 | Replacement of CR Bearing |
| 19 | Replacement of piston Ringset |
| 20 | Replacement of Piston |
| 21 | Replacement of Linner |
| 22 | Replacement of Valve Hole Grinding, Fitting Complete |
| 23 | FIP Servicing |
| 24 | Nozzle Servicing |
| 25 | Air Cleaner |
| 26 | Fuel Fitter |
| 27 | Oil Fitter |
| 28 | Gasket Kit |
| 29 | Fan Belt, Horse Pipe |
| 30 | Oil Pimp |
| 31 | Mechanic Overhauling Charge |
| 32 | SCHEDULE `A\" PART -III (Overhauling of 2x5 KVA Kirloskar Genr of 8 AR at Chassad) |
| 33 | Replacement of Main Bearing |
| 34 | Replacement of CR Bearing |
| 35 | Replacement of piston Ringset |
| 36 | Replacement of Piston |
| 37 | Replacement of Liner |
| 38 | Replacement of Valve Hole Grinding, Fitting Complete |
| 39 | FIP Servicing |
| 40 | Nozzle Servicing |
| 41 | Oil Filter, Fuel Filter, Oil Seal |
| 42 | Gasket Kit |
| 43 | fan Belt |
| 44 | Mechanic Overhauling Charge |
| 45 | SCHEDULE `A\" PART -IV (Overhauling of 12.5 KVA Escort Genr of 8 AR at Chassad) |
| 46 | Replacement of Main Bearing |
| 47 | Replacement of CR Bearing |
| 48 | Replacement of piston |
| 49 | Replacement of Liner |
| 50 | Piston Ring Set |
| 51 | Head Servicing Complete |
| 52 | FIP Servicing |
| 53 | Nozzle Servicing |
| 54 | Water Pump Assembly |
| 55 | Battery Cable Set |
| 56 | Gasket Kit |
| 57 | Fan Belt |
| 58 | Mechanic Overhauling Charge |
| 59 | SCHEDULE `A\" PART -V (Overhauling of 12.5 KVA Escort Genr of 8 AR at Chassad) |
| 60 | Replacement of Main Bearing |
| 61 | Replacement of CR Bearing |
| 62 | Replacement of piston |
| 63 | Replacement of Liner |
| 64 | Piston Ring Set |
| 65 | Head Servicing Complete |
| 66 | FIP Servicing |
| 67 | Nozzle Servicing |
| 68 | Water Pump Assembly |
| 69 | Oil Filter |
| 70 | Diesel Filter |
| 71 | Fuel Pipe |
| 72 | Horse Pipe |
| 73 | Battery Cable Set |
| 74 | Starter Servicing |
| 75 | Gasket Kit |
| 76 | Dynamo Servicing |
| 77 | Mechanic Overhauling Charge |
| 78 | SCHEDULE `A\" PART -VI (Overhauling of 30 KVA Kirloskar Genr at Shangshak (40 AR)) |
| 79 | Replacement of Main Bearing |
| 80 | Replacement of CR Bearing |
| 81 | Replacement of piston Ring set |
| 82 | Replacement of Piston |
| 83 | Replacement of Liner |
| 84 | Replacement of Valve Hole Grinding, Fitting Complete |
| 85 | FIP Servicing |
| 86 | Nozzle Servicing |
| 87 | Air Cleaner |
| 88 | Fuel Fitter |
| 89 | Oil Fitter |
| 90 | Gasket Kit |
| 91 | Fan Belt, Horse Pipe |
| 92 | Oil Pump |
| 93 | Mechanic Overhauling Charge |
| 94 | SCHEDULE `A\" PART -VII (Overhauling of 2x12.5 KVA Escort Genr at Shakpao COB (40 AR) |
| 95 | Replacement of Main Bearing |
| 96 | Replacement of CR Bearing |
| 97 | Replacement of piston |
| 98 | Replacement of Piston Ring |
| 99 | Replacement of Liner |
| 100 | Replacement of Valve Hole Grinding, Fitting Complete |
| 101 | FIP Servicing |
| 102 | Nozzle Servicing |
| 103 | Water Pump Assembly |
| 104 | Fuel Fitter |
| 105 | Oil Fitter |
| 106 | Gasket Kit |
| 107 | Fan Belt, Horse Pipe |
| 108 | Oil pump |
| 109 | Fuel pipe |
| 110 | Starter servicing |
| 111 | Mechanic Overhauling Charge |
| 112 | SCHEDULE `A\" PART -VIII (Servicing, cleaning of mambrane including supply of standby membrane, semi automatic media acivated carbon plus sand of 1000 LPH capacity RO plant, filter media gauge maint and replcement etc. (40AR)). |
| 113 | Supply and replacement of 8040 RO Membrane |
| 114 | Supply and replacement of Big blue candle |
| 115 | Supply and filling filter media change inch gauge interchange |
| 116 | Testing, commissioning and cleaning etc all complete |
| 117 | Supply and replacement of Big blue candle |
| 118 | SCHEDULE `A\" PART -IX (Misc Items (40AR)) |
| 119 | Supply and fixing LT Separator |
| 120 | Maint of self starter |
| 121 | SCHEDULE `A\" PART -X (Supply & fixing of Generator Accessories(18AR)) |
| 122 | Supplying/Fitting of Fuel filter for 35 KVA Kirloskar Diesel Generator |
| 123 | Supplying/Fitting of Oil filter for 35 KVA Kirloskar Diesel Generator |
| 124 | Supplying/Fitting of Air filter element for 35 KVA Kirloskar Diesel Generator |
| 125 | Supplying/Fitting of Fuel filter for 30 KVA Kirloskar Diesel Generator |
| 126 | Supplying/Fitting of Oil filter for 30 KVA Kirloskar Diesel Generator |
| 127 | Supplying/Fitting of Air filter element for 30 KVA Kirloskar Diesel Generator |
| 128 | Supplying/Fitting of Fuel filter for 15 KVA Kirloskar Diesel Generator |
| 129 | Supplying/Fitting of Oil filter for 15 KVA Kirloskar Diesel Generator |
| 130 | Supplying/Fitting of Air filter element for 15 KVA Kirloskar Diesel Generator |
| 131 | Supplying/Fitting of Fuel filter element( primary and secondary set) for 12.5 KVA Swadeshi whishpower Diesel Generator |
| 132 | Supplying/Fitting of Oil filter for 12.5 KVA Swadeshi whishpower Diesel Generator |
| 133 | Supplying/Fitting of Airfilter element for 12.5 KVA Swadeshi whishpower Diesel Generator |
| 134 | Replacement of AVR with fitting of 15KVA Kirloskar Diesel Generator at COB Ukhrul |
| 135 | Rewinding of Coil and repair of gland bush of 5 HP motor |
| 136 | Replacement ofFuel filter |
| 137 | Replacement ofOil filter |
| 138 | Replacement of Head Gasket (Fibre) |
| 139 | Replacement of Tupid cover gasket |
| 140 | Replacement of water pump assembly |
| 141 | Replacement of AVR (R-126) |
| 142 | Replacement of Fuel pipe |
| 143 | Replacement of high pressure nozzle pipe assembly |
| 144 | Replacement of Fan belt |
| 145 | Replacement of Dynamo belt |
| 146 | Replacement of Air cleanser filter |
| 147 | Replacement of Valve oil seal |
| 148 | Replacement of Head bowl/nut |
| 149 | Replacement of Washer |
| 150 | Cleansing of radiator |
| 151 | FIP servicing and element change |
| 152 | Nozzle servicing and element change |
| 153 | Dynamo servicing |
| 154 | Coolant |
| 155 | Red gum |
| 156 | Distilled water |
| 157 | Benzol Bowl eturn |
| 158 | Mechanic charge |
| 159 | SCHEDULE `A\" PART -XI (Overhauling of 12.5KVA Swadeshi Whispower Silent Generator set at Mapum including replacement of (18AR)) |
| 160 | Replacement ofPiston Ring set |
| 161 | Replacement of Engine head gasket |
| 162 | Replacement of Engine Gasket kit |
| 163 | Replacement of Mobile filter spin type |
| 164 | Replacement of Fuel filter element P/S set |
| 165 | Replacement of Engine Fly wheel side oil seal |
| 166 | Engine timing gear side oil seal |
| 167 | Replacement of C.R bearing Pair |
| 168 | Replacement of Main bearing pair |
| 169 | Replacement of Engine crank shaft lather grinder |
| 170 | Replacement of Nozzle |
| 171 | FIP Repair |
| 172 | Replacement of Lainer |
| 173 | Replacement of Piston |
| 174 | Replacement of Liner rubber O ring set |
| 175 | Replacement of Engine thread repair Valve grinder |
| 176 | Replacement of Fuel pipe |
| 177 | Replacement of Engine cooling fan belt |
| 178 | Replacement of Engine Oil |
| 179 | Replacement of Engine full servicing |
| 180 | SCHEDULE `A\" PART -XII (Overhauling of 12.5KVA Swadeshi Whispower Silent Generator set at Poi including replacement of (18AR)) |
| 181 | Replacement ofPiston Ring set |
| 182 | Replacement of Engine head gasket |
| 183 | Replacement of Engine Gasket kit |
| 184 | Replacement of Mobile filter spin type |
| 185 | Replacement of Fuel filter element P/S set |
| 186 | Replacement of Engine Fly wheel side oil seal |
| 187 | Engine timing gear side oil seal |
| 188 | Replacement of C.R bearing Pair |
| 189 | Replacement of Main bearing pair |
| 190 | Replacement of Engine crank shaft lather grinder |
| 191 | Replacement of Nozzle |
| 192 | FIP Repair |
| 193 | Replacement of Lainer |
| 194 | Replacement of Piston |
| 195 | Replacement of Liner rubber O ring set |
| 196 | Replacement of Engine thread repair Valve grinder |
| 197 | Replacement of Fuel pipe |
| 198 | Replacement of Engine cooling fan belt |
| 199 | Replacement of Engine Oil |
| 200 | Replacement of Engine full servicing |
| 201 | Supply/installation of 20HP Online starter (6 connector points) at Bn HQ Somsai |
| 202 | Supply/Fitting of 630 Amp MCCB 4 Pole at Bn HQ Somsai |
| 203 | Supplying/Fitting of Fuel filter for 160 KVA Kirloskar Diesel Generator |
| 204 | Supplying/Fitting of Oil filter for 160 KVA Kirloskar Diesel Generator |
| 205 | Supplying/Fitting of Air filter element for160 KVA Kirloskar Diesel Generator |
| 206 | Supply/ Installation of Gang operator |
| 207 | Supplying/Fixing of Thimble 25mm |
| 208 | Supplying/Fixing of Thimble 35mm |
| 209 | SCHEDULE `A\" PART -XIII (Repair & Maint of RO Plant 5000 LPH at HQ 10 Sect AR ( Somsai) |
| 210 | Supply and fixing RO Membrane element 8040 just AQUA ULP (Dry) |
| 211 | Supply and fixing Big Blue Spun 5 Micron filter Cartridge Size 20\" x 4.5\" ) |
| 212 | Supply and cleaning membrane housing and pipe line with chemical (Catic soda) |
| 213 | Supply and filling sand media filter 30” x 72” (Dia x Ht) Make : Aqua purity/Pentair/Seaflo/Shakti equivalent |
| 214 | Supply and filling carbon media filter 30” x 72” (Dia x Ht) Make : Aqua purity/Pentair/Seaflo/Shakti equivalent |
| 215 | Supply and fixing Rota (Flow) meters (5000 LPH RO) set of 2 |
| 216 | Supply and fixing Multiport valve (5000 LPH RO) |
| 217 | SCHEDULE `A\" PART -XIV (Overhauling of 3 Phase 125 KVA Kirloshakar Genr setat HQ 10 Sect AR ( Somsai)) |
| 218 | Replacement of Main Bearing |
| 219 | Replacement of CR Bearing |
| 220 | Replacement of Piston ring |
| 221 | Replacement of Piston |
| 222 | Replacement of Cylinder Liner |
| 223 | Replacement of head valve with complete fitting |
| 224 | Replacement of Air Cleaner |
| 225 | FIP servicing with elements change |
| 226 | Nozzle servicing with element change |
| 227 | Starter servicing |
| 228 | Dynamo servicing |
| 229 | Replacement of fuel filter |
| 230 | Replacement of oil filter |
| 231 | Hose pipe |
| 232 | Head gasket (fiber) |
| 233 | Fan belt |
| 234 | Tappet cover gasket |
| 235 | Radiator servicing |
| 236 | Mechanic charges |
| 237 | SCHEDULE `A\" PART -XV (Repair & Maint of Pump Set at HQ 10 Sect AR ( Somsai)) |
| 238 | Repair to centrifugal mono block pump sets of 3 HP by dismantling cleaning, rewinding, with suitable gauge of copper wire, varnishing, baking incl reassembling all the dismantled components with testing, commissioning to the entire satisfaction and directed by Engr incl replacement bearing, impeller and connector etc as required |
| 239 | Repair to centrifugal mono block pump sets of 5 HP by dismantling cleaning, rewinding, with suitable gauge of copper wire, varnishing, baking incl reassembling all the dismantled components with testing, commissioning to the entire satisfaction and directed by Engr incl replacement bearing, impeller and connector etc as required |
| 240 | Repair to centrifugal multi satage pump sets of 20 HP by dismantling cleaning, rewinding, with suitable gauge of copper wire, varnishing, baking incl reassembling all the dismantled components with testing, commissioning to the entire satisfaction and directed by Engr incl replacement bearing, impeller and connector etc as required |
| 241 | Re[aor to monoblock pump set 7.5 Hp by dismantling cleaning, rewinding, with suitable gauge of copper wire, varnishing, baking incl reassembling and testng complete |
| 242 | SCHEDULE `A\" PART -XVI (Repair & maint of Air Conditioning at HQ 10 SECT AR ( Somsai)) |
| 243 | Installation & testing only new Air conditioning |
| 244 | Supply and filling R22 gas in existing Air conditioning |
| 245 | Supply and filling R32 gas in existing Air conditioning |
| 246 | Servicing of Air conditioning (Indoor & out door) units complete |
| 247 | Supply and fixing AC stand (Set of 02 each) |
| 248 | Supply and fixing copper pipe |
| 249 | Supply and fixing insulator pipe |
| 250 | Dismentling of AC units and deposite unserviceable items in store. |
| 251 | SCHEDULE `A\" PART -XVII (Misc electrical itemsat HQ 10 SECT AR ( Somsai)) |
| 252 | Reolacement of old faulty 200A industrial changeover switch with new 200A industrial changeover of existing electrical panel board and deposite unserviceable itemsin store |
| 253 | Providing and fixing LT Line PVC separator for 4 line wire of ACSR conductor and deposite unserviceable items in store. |
| 254 | Stretching of 11 KVA LT Line ACSR conductor wire with wire pullar and checking all insulators complete. |
| 255 | Supply and fix HT 11 KV, outdoor type gang operated air-break switch suitable for horizontal or vertical mounting fixed type complete with 9 insulators of rating upto 400 Amps |