|
| 1 | Back filling of poles with boulders. |
| 2 | Bi-metallic clamps suitable for 12mm dia stud and 80sqmm AAAC |
| 3 | Bi-metallic clamps Distribution Transformers Bushing |
| 4 | Three phase Static Energy meters 20-80 Amps.with L.S. & TOD Facility with box |
| 5 | Meter cum protection box for 25 KVA DTR |
| 6 | Single Phase Service connection box (Deep Drwan Metal Service Connection Boxes )with one incoming up to 25 mm2 and 8 no outgoing up to 10 mm2 with insulated multiple outgoing connector- |
| 7 | G.I. WIRES 4.0 MM. (8 SWG) |
| 8 | Anti climbing devices ( Barbed wire 2.24 mm dia, 14 SWG) |
| 9 | STAY WIRE 7/3.15 MM.(7/10 SWG) |
| 10 | G.I.Pipe 40 mm Dia C grade type |
| 11 | Earthing Coil of 115 Turns of 50 MM.Dia and 2.5 Mtr. Lead of 4.0 MM G.I Wire |
| 12 | Galvanized nut & bolt with washer |
| 13 | Earthing for PCC Pole 4.00 mm-8 SWG G.I wire- 0.8 Kg, per pole |
| 14 | M.S.Nuts with Bolts |
| 15 | LT A.B Cable tension clamps (Galvanized) |
| 16 | LT A B cable Suspension clamps (Galvanized) |
| 17 | Clamps for neutral for AB Cable |
| 18 | Piercing connector Type-I for single/three phase (Main 16-50 sqmm tap-off 16-50 sqmm) |
| 19 | Piercing connector Type-II (Main 16-50 sqmm tap-off 16-50 sqmm) |
| 20 | Aluminium Binding wire and tape |
| 21 | Back Clamp for 140 Kg PCC Pole MS Flat 50x6 mm |
| 22 | Clamp for 140 Kg PCC Pole MS Flat 50x6 mm |
| 23 | Stay set complete without Stay wire 16 mm. (Painted) |
| 24 | Danger Boards Enamelled 11 KV |
| 25 | Stay Insulators 90X65mm |
| 26 | Red oxide paint |
| 27 | Aluminium paint |
| 28 | Concreting of stay (16 mm / 12 mm) @ 0.2 Cmt. per stay |
| 29 | Complete jumpering of DTR |
| 30 | Concreting of structures & foundation (1:3:6) |
| 31 | DTR S/s fencing (31 feet) of 5\" barbet fencing on PCC support of 7No, 6\" Height |
| 32 | Double Gate (2No-2.5\"x5x) set of MS angle (25x25x4mm) with mesh & locking |
| 33 | G.I. STRIP 25X3 MM1 |
| 34 | Stone Block/Pre cast block for base pedding(450X450X75MM) |
| 35 | Bentonite compound powder |
| 36 | Material GST On @18% |
| 37 | Labour Charge |
| 38 | GST Labour Charge@18% |
| 39 | Transportation Charge |
| 40 | GST ON TRANSPORTATION CHARGE @5% |
| 41 | Grand Total |