| 1 | (A) Supply, installation, testing and commissioning of machineries and equipment for 50 TPD solid waste processing facilities including wet waste processing facility, dry waste processing facility for dry waste processing including GST (CAPEX) (REQUIRED ITEMS ARE AS BELOW) |
| 2 | Hopper 1 (1.80m X 1.80m) |
| 3 | Feeding Conveyor (1000 mm wide to Trommel (FC-1) 9.5 M |
| 4 | Magnetic Separator |
| 5 | Trommel 80mm (5.5 X Φ 1.8 M) |
| 6 | Discharge conveyors from Trommel to +80 (600 mm wide) To MSC (DC-1) 4.60 m |
| 7 | Discharge conveyors from Trommel to -80 (600 mm wide)DC-2 (6.0 m) |
| 8 | Discharge conveyors from Trommel to -80 (600 mm wide)DC-3 (3.9 m) |
| 9 | Hopper 1 (1.80m X 1.80m) |
| 10 | Feeding conveyor (800 mm wide)FC-1, 7.8 meters long |
| 11 | Magnetic Separator |
| 12 | Manual Sorting Conveyor (1000 mm wide, 8m Long)MSC |
| 13 | Primary Shredder 25 HP (3 TPH) (Size 450x900) |
| 14 | Feeding Conveyor from Primary Shredder to ADS 10.50 Mtrs.(800 mm wide) FC-3 |
| 15 | Air Density Separator (ADS) |
| 16 | Feeding Conveyor to Shredder (800 mm wide, 7.50 m long) FC-4 |
| 17 | Secondary Shredder 20 HP (2.5 TPH) (Size 450x900) |
| 18 | Bailing Press |
| 19 | HOPPER (1.80m X 1.80m) |
| 20 | Feeding Conveyor to 35.0 mm Trommel (800 mm wide, 8.50 m long) |
| 21 | Magnetic Separator |
| 22 | 35.0 mm Trommel (4.5m length X 1.8 m Dia) |
| 23 | Discharge conveyor (600mm wide, 4.5 m long) from 35.0 mm Trommel |
| 24 | Feeding Conveyor to 16.0 mm Trommel (800 mm wide, 12.80 m long) |
| 25 | 16.0 mm Trommel (4.5m length X 1.8 m Dia) |
| 26 | Discharge conveyor(600mm wide, 8.0 m long) from 16.0 mm Trommel to curing |
| 27 | Discharge conveyor(600mm wide,4.5 m long) from 16.0 mm Trommel |
| 28 | HOPPER(1.80m X 1.80m) |
| 29 | Feeding Conveyor to 4.0 mm Trommel (600 mm wide, 11 m long) |
| 30 | 4.0 mm Trommel (4.5m length X 1.8 m Dia) |
| 31 | Discharge conveyor (600 mm wide, 5.30m long) from 4.0 mm Trommel |
| 32 | Discharge conveyor (600 mm wide, 4.50m long) from 4.0 mm Trommel |
| 33 | Feeding Conveyor (800mm wide, 8.60 m long) to De-Stoner |
| 34 | De-stoner |
| 35 | Discharge conveyor (600mm wide, 5.0 m long) from De-Stoner |
| 36 | Packaging Equipment’s |
| 37 | Front End Loader Attachment Loader Bucket Capacity (cum) 0.6 cum Dump Angle 90 degree Loader Hinge Pin Height 3350 mm Load Over Height 3100 mm Dump Height 2680 mm Fully Dumped 700 mm Working Depth 150 mm |
| 38 | Tractors with Trolly |
| 39 | Supply of backhoe cum loader of JCB/Tata make fitted with 0.26 cum Excavator bucket, 1.1 cum loader bucket for spreading waste and daily cover |
| 40 | 160KVA with OFF -LTC (+5% to -10%@2.5%) |
| 41 | Main Panel for connection to distribution panels |
| 42 | Sub Panel (Feeder Pillor) for Electricity connection of Machines of Pre-segrigation unit |
| 43 | Sub Panel for Electricity connection of Machines at compost processing Unit |
| 44 | Sub Panel for Electricity connection of Machines at MRF & RDF Processing Unit |
| 45 | Tipping fee for 1st year of operations & maintenance along with development ofSanitary Landfill for process inerts(OPEX) (50 TPD x 365 Days = 18250) TON PER YEAR |