| 1 | Puliya |
| 2 | Dismentling of old anddamage Interlocking tiles including supplyof all material,labour and T&P etc.required for proper completion of work (Chapt-18/2) |
| 3 | Dismentling of old anddamage cc tiles including supplyof all material,labour and T&P etc.required for proper completion of work (Chapt-17/697) |
| 4 | Disposal of dismentling cc road material with cartage upto distance 3.00 km i/c loading and unloading 80 % of item no-1 including supply of all material,labour and T&P etc.required for proper completion of work (Chpt-3/231a) area as per item no 1 area as per item no 2 |
| 5 | Earth work in excavation in ordinary soil (loam clay or sand ) including lift upto 1.50 m and lead upto 30m including back filling watering and ramming of exavated earth including supply of all material labour and T&p etc required for proper completion of work (chpt4/251) culvert |
| 6 | Concrete in 1:6:12 withbrick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/273) culvert drain |
| 7 | Concrete in 1:2:4 withstone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/279a) culvert L type drain U type drain area as per item no 2 |
| 8 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage inraftand wall ic supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-5/287a)culvert |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in wall ic supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-5/289a)culvert |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in slab i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/284a)rcc slab at various place |
| 11 | Mild steel or iron work such as reinforced including supply of all material labour and t&p etc required for proper completion of work (as per sail ) for raft for wall &slab |
| 12 | Dismentling of old anddamagedrainbrick work including supplyof all material,labour and T&P etc.required for proper completion of work (Chapt-17/692) |
| 13 | deduction of exacavated material material upto 3km lead inc loading unloading including supply of all material labour and t&p etc required fro proper completion of work (chpt1/1a) qty asper item no 3 |
| 14 | Disposal of excavated material material up to 3 km lead inc loading unloading including supply oa all material labour and t&p etc required for proper completion of work (chpt-3/31a) |
| 15 | M-150 brick work in 1:4 with cement,coarse sandmortar in super structure including supply of all material,labour and T&P etc.required for proper completion of workas per analysis wall |
| 16 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work wall wall |
| 17 | providing laying spreading 22.4-53mm stone aggregate in one layer with fine sand including supply of all material labour and t&p etc required for proper completion of work Area as per item no-1 |
| 18 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (Chpt-20/new20) same area as per item no 1 |
| 19 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (grey tiles isi mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (Chpt-20/new20) same area as per item no 1 |
| 20 | laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (Chpt-4/7) same area as per item no 1 add sign board |
| 21 | Add sign board |
| 22 | Mild steel or iron work such as channel including supply of all material labour and t&p etc required for proper completion of work (as per sail ) channel |
| 23 | gst |