| 1 | PP & Clamp with N&B PCC Pole 8.5 Mtr |
| 2 | 11 KV IPC for covered to covered conductor |
| 3 | 11 KV IPC for covered to bare conductor |
| 4 | 11 KV Mid span jointing kit |
| 5 | IPC with Aluminium bail for earthing 11 KV |
| 6 | 11 KV Sus. Ties/Cable Ties on Pin Insulator |
| 7 | Danger Board with Clamp (SP-33) |
| 8 | 11 KV AAAC Covered Cond. AL-59,99 Sq.mm |
| 9 | 11 KV H.S Kit 3x120 MM (Indoor type) |
| 10 | 11 KV H.S Kit 3x120 MM (Outdoor type) |
| 11 | 11 KV Tension Clamp with Bail & IPC |
| 12 | LABOUR CHARGE |
| 13 | Chemical Earthing |
| 14 | Erection of Earthing Rod |
| 15 | Fabrication of steel |
| 16 | Excavation of Pit for Stay Set |
| 17 | Erection of 11 KV Stay Set |
| 18 | Grouting of Stay Set |
| 19 | Excavation of Pit for Pole |
| 20 | Erection of Single PCC Pole |
| 21 | Erection of Single SP-33 Pole |
| 22 | Erection of Single SP-55 Pole |
| 23 | Erection of Single SP-33 Double Pole |
| 24 | Erection of Single SP-55 Double Pole |
| 25 | Grouting of Pole |
| 26 | Muffing of Pole |
| 27 | Laying of U/G 11 KV Cable in Trench |
| 28 | Fixing of TPMO |
| 29 | Fixing of Fuse Set |
| 30 | Fixing of Lighting Arrestor |
| 31 | Erection of Bracket in 11 KV Line |
| 32 | Guarding of LT11 KV Line |
| 33 | Making of Section Pole |
| 34 | Fixing of 11 KV XLPE Jointing Kit |
| 35 | Cartage PCC Pole, 51-70 KM |
| 36 | Cartage SP-33 Pole, 51-70 KM |
| 37 | Cartage SP-55 Pole, 51-70 KM |
| 38 | Cartage of Petty Material, 51-70 Km |
| 39 | Cartage 11 KV Panels, 51-70 Km |
| 40 | Headload Cartage PCC Pole (0-1 Km) |
| 41 | Headload Cartage SP-33 Pole (0-1 Km) |
| 42 | Headload Cartage SP-55 Pole (0-1 Km) |
| 43 | Headload Cartage of Material (0-1 Km) |
| 44 | Manual Shifting of 11 KV VCB O/G |
| 45 | Inst. of Danger Board/Number Plate |
| 46 | Fixing of IPC with AL. Bail for Earthing |
| 47 | Jumper of Section Pole |
| 48 | Fixing of 11 KV 90KN Tension Clamp B&IPC |
| 49 | Fixing of 11 KV Mid Span Jointing Kit |
| 50 | Fixing of 11 KV IPC for Covered to CoverConductor |
| 51 | Fixing of 11 KV IPC for Covered to Bare Conductor |
| 52 | Supply & Fixing of Anti Climbing Device |
| 53 | Testing of 11 KV VCB |
| 54 | Laying Spreading, Stringing AAAC Conductor |
| 55 | Erection of 11 KV VCB O/G |
| 56 | Headload Cartage of 11 KV VCB O/G |
| 57 | 11 KV Cable Ties for Pin Insulator |
| 58 | Erection of Danger Board Clamp (SP-33) |
| 59 | Erection of Danger Board Clamp (SP-55) |
| 60 | Painting of Single Pole (SP-33) |
| 61 | Painting of Single Pole (SP-55) |
| 62 | Looping and Chopping of Tree Branches |
| 63 | Total (B) |
| 64 | Total (A+B) |
| 65 | Company/Firm Name |
| 66 | Name |
| 67 | Designation |
| 68 | Date |