| 1 | Name of the Monument / Site:Ramappa Temple, Palampet |
| 2 | Provision made for earthwork excavation for proposed dwarf wall to the newly acquired land at west side of Ramappa Temple including labour charges, conveyance, diesel charges, loading, unloading, applicable taxes etc. all complete as per the directions of department official |
| 3 | Provision made for providing PCC 1:4:8 as a bed course over a sand cushion of 01.10 mts thick to the dwarf wall including cost of materials, labour charges, conveyance, diesel charges, loading, unloading, compaction charges, applicable taxes etc. all complete as per the directions of department officials.. |
| 4 | Provision made for construction of Random Rubble stone masonry for foundation in Cement mortar 1:4 using hard granite stones including cost of materials, loading, unloading, conveyance, taxes, GST etc all complete as per the directions of department officials |
| 5 | Provision made for construction of CR Masonry wall in Cement mortar 1:4 using hard granite stones of size 0.23 X 0.23 X 0.30 mts. to 0.23 X 0.23 X 0.45 mts. Including cost of materials, loading, unloading, conveyance, taxes, GST etc all complete as per the directions of department officials |
| 6 | Provision made for coping on the masonry wall in Cement Concrete 1:2:4 using 10mm HBG aggregate for boundary wall and finished with CM 1:4 plaster, 20 mm thick, including cost of materials, loading, unloading. conveyance, taxes, GST etc all complete as per the directions of department officials |
| 7 | Making, Supplying and fixing of fabricated Grill fencing of size 2.0x1.20 m (each frame) with 50x50x6 mm MS angle, with welding the MS Angle of size 50x50x6 mm. on the top and bottom portion and providing 25mm square MS rods for the verticals at 125 mm. centre to centre as per the existing style as it is extension of existing fencing for newly acquired land and finishing the end as spike and fixing the entire fabricated work over the dwarf wall including material charges, fabrication charges, loading charges, unloading charges, conveyance, GST and painting the grill with two coats of smoke-grey/existing colour enamel paint after applying necessary, iron primer etc. all complete as per the directions of department officials. |
| 8 | Level) after deductions Qty 1700.761- 450.328= 1250.433) |