| 1 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. |
| 2 | Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc: required for proper completion of the work. |
| 3 | M-150 Brick work in 1:4 (1 Cement : 4 coarse sand) in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 4 | M-150 brick work in 1:4 cement and coarse sand of 1.25 F.M.mortar in superstruture including necesssary thickness of brick as reqruired cutting & moulding of brick as equried thickness of walls not to be less than one brick including supply of all materieals labour tools& plants etc. reqruired for proper completion of the work. |
| 5 | Dismantling reinforced cement concrete or rainforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet) |
| 6 | Deddution of cost of old brick obtained from Dismantling of brick work. |
| 7 | RCC work with cement, approved Coarse sand and 40mm stone grit in proportion of 1:1.5:3 in raft foundation and footings excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire |
| 8 | As im item no.4 above but in R.C.C column in proportion of 1:1.5:3 (S.I. No.289) |
| 9 | As im item no.4 above but in beam having span upto 6.0m. |
| 10 | M.S. (Tor steel or plain) in plain work such as R.C.C. work including bending for proper shape and including supply of steel & its wastage, bend, hooks. and authorised overlapping shall be measured and including cost of binding wire |
| 11 | 12mm thick cement plaster with 1:4 cement and approved fine sand mortar over brick work minimum thickness not to be less than 1cm including supply of all terial, labour, tolls and plants eto, required for proper completion of the work |
| 12 | Painting or varnishing work in small areas or new wood/steel work with one coat ready mixed priming paint and one coat or approved superior quality ready mixed paint or varnish including supply of all materials, labour. T&P etc. required for proper completion of the work. Paint to be used should confirm the ISI.No.103-1950. As per SOR. 641+642 |
| 13 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layer with motor grader on prepared surface, mbing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 14 | supply and fixing of 80mm thick shaped rubber moulded cement gray/ordinary red interlocking cement concret paver blocks confirming 15:15650/2006 of control vibration napproved shape ine hamenso 200 (160+120) with minimum 5mm thick topping of OR cement mixed with 25% marble powder the compresive strength of concret paver block shall not be less than 30 mpa (M-30) including levelling and dressing of surface up to require label and slopes filling joints with local and inculding cost of material labour T&P required for proper completion of work as directed by E I and as per approved specifications. |
| 15 | Cement concrete with 2cm gauge approved stone grit, coarse 279(a) sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 16 | Cement concrete with 2cm gauge approved stone grit, coarse 279(a) sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |