|
| 1 | Cartage of following material from store center Meerut to Site of work including loading & unloading at both ends maximum distance up to 40 Km. :- (as per direction of Supervising Engineer). |
| 2 | PCC Pole 11 mtr long |
| 3 | PCC Pole 8.5 mtr long |
| 4 | 11 KV X-arm |
| 5 | Stay Set Complete |
| 6 | 11 KV XLPE Cable 3x185 sq.mm |
| 7 | 11 KV Cable Jointing Kit 3x185 sq.mm |
| 8 | 11 KV XLPE Cable 3x120 sq.mm |
| 9 | 11 KV Cable Jointing Kit 3x120 sq.mm |
| 10 | 11 kv Pin Insulator with Pin |
| 11 | 11 kv Disc Insulator with Fitting |
| 12 | 11 kv V type X-arm |
| 13 | Earthing Rod Complete |
| 14 | ACSR Rabbit Conductor |
| 15 | Errection PCC Pole 11 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting of the pole with proper ramming after completion of work. (as per UPPCL Respo). |
| 16 | Errection PCC Pole 8.5 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting of the pole with proper ramming after completion of work. as per UPPCL Respo). |
| 17 | Laying of 11 kv XLPE Cable 3x185sq.mm (as per UPPCL Respo). |
| 18 | Laying of 11 kv XLPE Cable 3x120sq.mm (as per UPPCL Respo). |
| 19 | Laying of ACSR Rabbit Conductor (as per UPPCL Respo). |
| 20 | Fixing of 11 KV Pin Insulator with fitting (as per UPPCL Respo). |
| 21 | Fixing 11 kv Disc Insulator with Fitting (as per UPPCL Respo). |
| 22 | Fixing of 11 KV X-arm V type (as per UPPCL Respo). |
| 23 | Fixing of 11 KV Jointing Kit 3x185 sq.mm (as per UPPCL Respo). |
| 24 | Fixing of 11 KV Jointing Kit 3x120 sq.mm (as per UPPCL Respo). |
| 25 | Fixing of Stay set for11 kv & LT complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. (as per direction of Supervising Engineer) |
| 26 | Fixing of MS Earthing rod of each11 KV& LT line and pole after drive of electrodes if size 20mm x 250 mm and connection the earthing point with GI wire. (as per direction of Supervising Engineer) |
| 27 | Providing and fixing Stone Pad (as per UPPCL Respo). |
| 28 | Providing and fixing F bracket (as per UPPCL Respo). |
| 29 | Grouting of Pole (as per UPPCL Respo). |
| 30 | Grouting of Stay (as per UPPCL Respo). |
| 31 | Providing and fixing of MS Nut and bolts (as per UPPCL Respo). |
| 32 | Providing and fixing of LT Pin Insulator (as per UPPCL Respo). |
| 33 | Providing and fixing of LT Shackle Insulator (as per UPPCL Respo). |
| 34 | Received Back material for ACSR Weasal & Rabbit Conductor (Old and Used) (as per direction of Supervising Engineer). |