}

Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi/Vidhayak Nidhi Deposit Work In The Area Of Edsd-I/Ii/Iii, Daurala/Sardhana Town/Sardhana Dehat Under Edd-Sardhana, Under Edc-2 Meerut. - Cartage Of Foll, sardhana-Uttar Pradesh

Tender Notice

51497357
Corrigendum : Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi/Vidhayak Nidhi Deposit Work In The Area Of Edsd-I/Ii/Iii, Daurala/Sardhana Town/Sardhana Dehat Under Edd-Sardhana, Under Edc-2 Meerut. - Cartage Of Foll
Tender
Indian
Uttar Pradesh
Sardhana
08-10-2025

Tender Details

Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi/Vidhayak Nidhi Deposit work In The Area Of Edsd-I/Ii/Iii, Daurala/Sardhana Town/Sardhana Dehat Under Edd-Sardhana, Under Edc-2 Meerut. - Cartage of following material from store center Meerut to JE Store & JE Store to Site of work including loading & unloading at both ends maximum distance up to 50 Km. :– (as per directiion of Supervising Engineer) 2 A) PCC Pole 8.5 mrt long/ST pole 11 mtr long. 3 B) 11 KV XLPE Cable of 3x70, 3x120, 3x185, 3x300 sq.mm. 4 C) 250 KVA T/f. 5 D) 11 KV CT/PT unit of Different size 6 E) 11 KV Jointing Kit of Different size 7 F) 11 KV Pilfer proof Cubical of Different size 8 G) LT ABC Cable of Size 1x16, 3x50, 3x95, 3x120 Sq.mm. 9 Cartage of line material (11 KV Pin Insulator, Disc Insulator, Stay Set, Cross Arm, GI Wire, Earthing Rod, MS Channel, MS Angle, etc) from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. 10 Cartage of 10 KVA & 25 KVA Transformer from store centre to site of work including loading & unloading at both site 11 Cartage of 63 KVA to 100 KVA Transformer from store centre to site of work including loading & unloading at both site 12 Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories and carriage to store 13 Eartingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire. 14 Erection ofPCC pole 8.5 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. 15 Erection ofSTP Pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work. 16 Fabrication and fixing of all 11 KV H.T/L.T. line accessories. 17 Erection of Double pole on PCC pole 8.5 mtr/STP 11 Mtr. Long after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories, Fuse set 11 KV pin insulators and making connection properly. 18 Construction of new Plinth for 250 KVA as per Respo 19 Mounting of 250 KVA T/f on Plinth as per Respo 20 Providing and fixing wiremess fencing for 250 KVA 21 Chemical Earthing for 250 KVA t/f neutral and body complete 22 Mounting of 10 & 25 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly. 23 Mounting of 63 & 100 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly. 24 Mounting of CT/PT unit with proper jumping of HT side and fixing of cable on LT. side of Meter Cubical Properly 25 Fixing of Meter Cubical as per Respo 26 Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. 27 Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. 28 Laying lifting stringing of proper sagging of ACSR Weasel/Rabbit/Dog conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly. 29 Laying lifting stringing of proper sagging of 11 KV XLPE Cable of 3x70, 3x120, 3x185, 3x300 sq.mm. sizes with filling jointing kit different size. 30 Laying of underground 11 KV XLPE Cable of 3x70, 3x120, 3x185, 3x300 sq.mm. sizes with open trench by brick & sand as per Respo 31 Filling the 11 KV Jointing Kit 32 Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120 sqmm.) 33 Laying lifting & sagging of LT line with Single Phase A.B. Conductor of size 1x16 sq.mm. including proper binding & jumpring. 34 Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting. 35 Cutting & chopping tree branches near side of line for making the clearance between line and tree 36 Fixing of LT distribution box along with providing clamp Nut & Bolts 37 Providing and fixing Holding Clamp 38 Providing and fixing LT clamps . 39 Providing and fixing LTInsulator clamps . 40 Providing and fixing Piercing Clamp. 41 Providing and fixing J Hook. 42 Providing and fixing Dead & End Clamp. 43 Providing and fixing Suspension Clamp. 44 Providing and fixing Bolt and Nuts .

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 06-10-2025 TNO.57/EDC2MT/2025-26datext Date 08-10-2025

Key Value

Document Fees
INR 3540 /-
Tender Value
INR 15 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail