| 1 | Cartage ofPole & material from store centrefrom any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. |
| 2 | Work of Preventive Maintenance Month of September-2025 and October-2025 under EDD-Rajapur |
| 3 | PCC Pole 8.5 Mtr Long |
| 4 | STPole 11Mtr Long |
| 5 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 6 | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Clamps shall be arranged by contractor on his own cost) |
| 7 | Grouting of 8.5 Mtr. Single PCC Poleper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 8 | Erection of 11Mtr. Single ST Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Clamps shall be arranged by contractor on his own cost) |
| 9 | Grouting of 11Mtr. Single ST Poleper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (All Civil Material shall be arranged by contractor on his own cost) |
| 10 | Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 11 | Straightening of tilled STP Pole |
| 12 | Straightening of tilled PCC Pole |
| 13 | Re-sagging of 11 KV loose line |
| 14 | Retightening of old stay set |
| 15 | Retightening of loose ABC Cable |
| 16 | Re-sagging of loose LT line |
| 17 | Tightening checking and replacement of jumpers |
| 18 | Grass cutting about 20X30\" area in s/s |
| 19 | vkblksysVj dk vuqj{k.k@cnyus dk dk;Z] fLop;kMZ dh lkQ lQkbZ] eSu vkblksysVj dh ejEer dk dk;Z] ih0th0 DySEi dks VkbV djus dk dk;Z] ¶;wt lsV dk vuqj{k.k@cnyus dk dk;ZA |
| 20 | vkW;y VkWivi] flfydk tsy ikoj ifjorZd dh lkQ&lQkbZ] clokj fd ejEer ,oa xzhf\"kax dk dk;ZA |
| 21 | 33 ds0oh0 ,oa 11 ds0oh0 oh0lh0ch0 iSuy dh lkQ lQkbZ dk dk;Z] oh0lh0ch0 fVªfiax Dokby oSD;we bUVªIVj ejEer ,oa cnyus dk dk;Z ,oa budfeax 11 ds0oh0 dsfcy ds yXl dh ejEer ,oa VkbVfuax dk dk;Z o oh0lh0ch0 dkUVsDV dh lkQ lQkbZ ejEer ,oa xzhflax dk dk;ZA |
| 22 | fofHkUUk QhMjks ij LFkkfir forj.k ifjorZdks 25 dsoh, ls 400 dsoh, es vkW;y VkiW&vi djus dk dk;Z] izksVDlu ,oa Msest yXl yxkus ij VkbV djkus dk dk;Z yksM cSysflax dk dk;Z o ifjorZd dh lkQ lQkbZ dk dk;ZA |
| 23 | Tree looping Chooping |