| 1 | Construction of 30000 litre capacity OHT tankat Athanoor village in Athanoor panchayat. |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 3 | a) First depth of 2m |
| 4 | b) Second depth of 1m |
| 5 | Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by officers. |
| 6 | Cement concrete 1:4:8 ( One of cement, four of sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing,curing etc., complete as directed byofficers. |
| 7 | RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBGS excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers. |
| 8 | For items 1.5m to 4.5m Below GL |
| 9 | 0m to 1.5m Below G.L. |
| 10 | 0m to 4.50m Above GL |
| 11 | 4.51m to 7.32m from GL |
| 12 | 7.33m to 10.98m from GL |
| 13 | 10.99m to14.64m from GL |
| 14 | 10.99m to14.64m from GL |
| 15 | Supplying and erecting steeL centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS angles of size 25mm×25mm×3mm of boarding, laid oversilver oak joints of size 10cm × 6.5cm speced as 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., completed and as directed byofficers. |
| 16 | A) Plane surface |
| 17 | Below G.L. |
| 18 | 0m - 3.30mAbove GL |
| 19 | 5.31 to 6.30m |
| 20 | 8.31 to 9.30m |
| 21 | 10.31 to11.30m |
| 22 | 11.31 to12.30m |
| 23 | B)Curved surface |
| 24 | 0 to 3.30m |
| 25 | 11.31 to 12.30m |
| 26 | C)Square columns |
| 27 | Below GL |
| 28 | 0 to 3.30m |
| 29 | 3.31 to 4.30m |
| 30 | 4.31 to 5.30m |
| 31 | 5.31 to 6.30m |
| 32 | 6.31 to 7.30m |
| 33 | 7.31 to 8.30m |
| 34 | 8.31 to 9.30m |
| 35 | 9.31 to 10.30m |
| 36 | 10.31 to 11.30m |
| 37 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt |
| 38 | Supplying fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed byofficers. |
| 39 | Fabrication, supply, delivery and fixing of outside MS ladder wide 45cm made out of 50×50×6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint to for providing access to roof top of OHT of suitable inclined length, including bottom anchorage and transportation and as directed byofficers.The rates includes concrete Bed block in in CC 1:2:4 using 20mm HBGS at Top and bottom of suitable size with necessory anchor bolts. |
| 40 | Providng manhole cover of size 0.60 x 0.60M in RCC inner 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed byofficers. |
| 41 | Provision for pipe connection arrangements for lnlet, outlrt, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below.65mm Φ GI pipes |
| 42 | 65MM dia GI Tee |
| 43 | 65MM dia GI 90 Bend |
| 44 | 65MM dia GI Coupler |
| 45 | 65MM dia GI Union |
| 46 | 65MM dia GI Elbow |
| 47 | 65MMx50MM dia GI Reducer |
| 48 | 65MM dia GM Gate Valve |
| 49 | 50MM dia GM Gate Valve |
| 50 | Refilling the foundation with excavated earth including consolidation as directed by the Departmental Officials etc., complete |
| 51 | 63mm PVC Pipe 4 KSC |
| 52 | Earthwork excavation in hard stiff clay and hard rocketc. complete |
| 53 | Laying of 63mm PVC pipe |
| 54 | Refilling the trench with excavated earth after laying and joing of pipes including all labour charges etc., complete |
| 55 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} 18% |