Solar Panghat scheme work. Laying And Jointing Pvc Pipe. Heading , Gril/ Get Etc. Me Lohe Ka Karye Jisme Spat Koniya T And Nalidar Chanel Ko Katna Chadana And Lagana Etc. , Supply , Installation Testing & Commissioning Of Solar Photovoltaic System Poly / Mono- Crystalline Mnre Approved Solar Modules - 24V , 330Wp With 60/72 Cells With Minimum 15% Module Efficiency Conforming To Relevant Latest Iec Standard As Per Mnre Guidelines, With Power Output Warranty Of 90% Of Rated Power For 10Years & 80% Of Rated Power At The End Of 25 Years, Connected Suitably In Series Or Parrallel , Mounted On Metallic Structures ( Hot Dip Galvanized According To Is: 4759) Of Adequate Strength & Appropriate Design, Havingmanuverable Seasonal Tilt Angle And Three Times Manual Tracking, Suitably Fixed In Pcc Foundation Using Antitheft As Per Mnre Specifications For Following :( 3 Hp Power , 10 Module ) , Supply , Installation Testing & Commissioning Of Spv Controller Having Ip:65 Protection Housed In A Cabinet To Provide Adequate Protection To Solar Poered Pump Against Dry Running , Open Circuit , Accidental Output Short Circuit, Under Voltage, Reverse Polarity, Spd To Arrest High Current Surge , Lightening Arrester Etc. Of Approved Make As Per Mnre Specification Is/Iec 60947-2, Is 694, Is 14536 Updated Time To Time ( 24 V Input, Rated Current 20 A ) , Supply , Installation Testing & Commissioning Of Different Capacity Solar Powered Water Pumps With Complete Assembly Of Solar Modules,Controller, Solar Motors, Including Transportation, Lowering & Fixing With The Spv Module, Controller, & Providing Pipe Connections On Suction Delivery Sides, Of Approved Make & Specifications Laid Down And Updated Time To Time By Mnre Complete In All Respect, Submersible Pumps( Dc Pumps 3Hp Solar Powered Water Pump ) , Construction Of Tube Well After Completion Of Drilling By Rotary/Percussion Method & Upto 100 Mtr. Depth In All Type Of Rocks By Dth System As Per Is:2800 Part 1:199 1And Is:2800 Part Ii:1979 (Bothamendeduptodate) And Technical Specifications. The Work Shall Be Deemed Completed Only After Obtaining Sand Free Water. The Bore Well Should Have At Hrough Out Nominalsize Bore Beyond Casing Pipe .( Nominal Bore 150 Mm Dia. ) , Construction Of Tube Well From Ground Level And Upto 100 Mtr. Depth And Above Of Following Sizes In All Types Of Soils In Alluvium Strata, Unconsolidated Formation Such As Pebbles, Boulders Etc. By Bailing Method And Without Gravel Packing As Per Is:2800 Part 1: 1991 Andis:2800 Part Ii: 1979 (Both Amended Upto Date) And Technical Specifications. The Work Includes Formation Of Cavity At Bottom By Development With Appropriate Air Compressor Or Bailer Pumping And Also Lowering Of Casing Pipe But Excluding Cost Of The Casing Pipe.The Tube Well Should Have A Throughout Bore As Per Nominal Dia Of Casing Pipe.The Work Would Be Completed After Obtaining Sand Free Water. ( Nominal Bore 150 Mm Dia. ) , Supply Of Erw M.S. Black Casing Pipe Isi Marked (Is: 4270/2001) Or Amended Up To Dateoffollowing Sizes . 150 Mm Dia Nb (Thickness Of Pipe 5.0 Mm & Mass Of Tube 20.13 Kg/M)M.S. Black Cassing Pipe ( Nominal Bore 150 Mm Dia. ) , Supply & Fixing Tube Well Coverof Ms Sheet 8Mm Thick At Top & 5Mm Thick 100Mm Wide Shroud Around The Edge So As To Form A Cap On The Top End Of Casing Pipe With Gi Nipple 45Cm Long & Two Gi Flanges At Both Ends In 80Mm Sizes Passing Through A Hole In The Centre Of Ms Sheet. A 25 Mm Socket With End Plug Shall Also Be Welded Over Top Plate. A Gi Nipple Having Outside Thread Of Size 1/2 (For Installation Pressure Gauge) Shall Be Provided & Welded With 80Mm Gi Nipple Near Top Plate Nipple Shall Be Provided With End Plug . ( Tube Well Cover Of M.S. Sheetnominal Bore 150 Mm Dia. ) , Supply & Fixing Of Isi Marked Three Core Pvc Flat Submersible Cable As Per Is 694:1990 Or Amended Upto Date And Conductor As Per Class 5 Of Is8130:1980 Including Making Connection Etc.(Cable 3Core) , Hdpe Pipe32mm Dia , For Making Foundation , Blank No Item Enter