| 1 | Clearing and grubbing by Cutting Light jungle removingand disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per clause 111, 112, 201 of MORT&H Specification. |
| 2 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 3 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 4 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 5 | Picking the existing BT surface upto 50mm thick depth etc. complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per as per clause 111, 112, 202, 203, 303, 403 & 501 of MORT&H Specification (Fifth Revision). |
| 6 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 7 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 8 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 9 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Rev-5. |
| 10 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 11 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 12 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 13 | Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5. |
| 14 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 15 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 16 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 17 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5. |
| 18 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 19 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 20 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 21 | Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5. |
| 22 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 23 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 24 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 25 | Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5. |
| 26 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 27 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 28 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 29 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Carted earth for making up berms with conveyance of 5 Km complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision) |
| 30 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 31 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 32 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 33 | Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804). |
| 34 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 35 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 36 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 37 | Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804). |
| 38 | A) Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 39 | B) Upgradation of Kolathupalayam - Vijayamangalam road to Senthanpalayam Pulavanur road Km 0/0 - 2/270. |
| 40 | C) Upgradation of (MDR 108) Erode - Chennimalai - Namakkalpalayam to Kamatchiamman Kovil (Via) MGR Nagar Km 0/0 - 2/16. |
| 41 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision) FOR FOUNDATION OF WELL PROTECTIVE WALL. |
| 42 | A) i). Construction of Well Protective Wall at Km 1/10 for the work of Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 43 | Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF WELL PROTECTIVE WALL. (BELOW SILL). |
| 44 | A) i). Construction of Well Protective Wall at Km 1/10 for the work of Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 45 | Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF WELL PROTECTIVE WALL. (BELOW SILL). |
| 46 | A) i). Construction of Well Protective Wall at Km 1/10 for the work of Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 47 | Vibrated Cement Concrete M15 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PARAPET OVER WELL PROTECTIVE WALL. |
| 48 | A) i). Construction of Well Protective Wall at Km 1/10 for the work of Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 49 | Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc., complete as per clause 2700 of MORT&H Specification (Fifth Revision) to drain of the backfill in between the WELL PROTECTIVE WALL. |
| 50 | A) i). Construction of Well Protective Wall at Km 1/10 for the work of Upgradation of Thalavamalai noyyal road to Selampalayam road VIA Kuppicipalayam Km 0/0 - 2/960. |
| 51 | Calculation of SubTotal, GST and Total carried out by system automatically |
| 52 | Sub Total Amount for above all items (excluding GST) |
| 53 | GST 18% for above SubTotal Amount |
| 54 | Total in Figures (SubTotal + GST) |