Tender For Construction Of Compound Fencing For Garden In Front Of A-Block , Rims, Imphal.; 1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2 All kinds of soil. 3 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. 4 Dry rubble Flooring 5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work upto plinth level: 6 i) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 7 Centering and shuttering including strutting, propping etc. and removal of form for: 8 a)Foundation, footings, bases of columns etc. and mass concrete. 9 b)lintels,beams,plinth beams,girders,bressumers and cantilevers. 10 Columns, Pillars, Piers, Abutments, Posts and Struts 11 Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Above Plinth level 12 Thermo-Mechanically Treated bars 13 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level 14 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 15 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up to floor five level excluding cost of centering,shuttering, finishing and reinforcement : 16 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). 17 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 18 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). 19 Half brick masonry with Ist class common burnt clay F.P.S. (non modular) bricks in superstructure above plinth level upto floor V level in 20 Cement mortar 1 : 3 (1 cement : 3 coarse sand) 21 Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required. 22 In grating, frames, guard bar, railing, brackets, gates and similar works. 23 Brick work with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: 24 Cement mortar 1:4 (1 cement : 4 coarse sand) 25 15 mm cement plaster on rough side of single or half brick wall of mix: 26 1:4(1 cem:4 fine sand) 27 Providing and applying white cement based putty of average thickness 1mm,of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 28 Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 29 With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre 30 Finishing walls with Acrylic Smooth exterior paint of required shade : — 31 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). 32 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: 33 Two or more coats on new work 34 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. 35 Concealed work, including cutting chases and making good the wall etc. 36 20 mm nominal outer dia Pipes