Name of Work: Construction of Sump Panchayat Union Primary School in Mullur Village and Panchayat inOttapidaram Panchayat Union of Thoothukudi District
Sl. No.
Item Description
1
Construction of Sump Panchayat Union Primary School in Mullur Village and Panchayat
2
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard red earth,shales, murrams, gravel, hard rock not requiring blasting ete complete., For Foundation
3
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
4
Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete For 100CFT
5
Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
6
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
7
Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
8
Plastering with cement mortar 1:5 mixto10mmthick including cost and conveyance of all materials to site and all labour charges etc
9
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
10
Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
11
Exterior Emulsion painting two coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
12
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.