| 1 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 2 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 3 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size9 ” x 4 3/8 “x 2 3/4 ”from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.(For 10 M3) |
| 4 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 5 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specificationsfor 10 sqm |
| 6 | Painting two coats with ready mixed synthetic enamal paint including cost & conveyance and all other incidental charges etc. complete for iron work |
| 7 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading ,tranportation and labour charges for fixing 2000 Ltr Tank |
| 8 | Supply and delivery of Panel Board including cost & Conveyance all labour charges etc.,complete |
| 9 | Supply and Delivery of 4.0 Sqmm Flat type Cable for Submergible motor including cost and conveyance of all materials etc. complete. |
| 10 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10with standard specifications. |
| 11 | Supply and delivery of 5 \" (125mm ) HDPE pipe PN 6including cost andConveyance of all materials to site and all charges for filling etc., Complete. |
| 12 | Supply and fixing of GI pipe and PVCpipe speacial including cost andConveyance of all materials to site and allcharges for filling etc., Complete. |
| 13 | GI Tee (125 mm) |
| 14 | GI Coupler(125 mm) |
| 15 | GI Elbow(125 mm) |
| 16 | Sluice valve(125 mm) |
| 17 | Lowering of HDPErigid pipes and specials to trench and laying to proper grade and alignment,jointing with PVC couplers with cement paste. |
| 18 | Refiling the excavated earth including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. |