| 1 | Providing Vertical Soakpit with Drainage @ Ponpathi Pt |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 3 | Filling Soak Pit with Following Materials |
| 4 | 225mm Boulder |
| 5 | 40mm Metal |
| 6 | 20mm Metal |
| 7 | Cost and supply of follwing 180mmPVC Pipes |
| 8 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 9 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 10 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 11 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 12 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 13 | Towards cost of RCC Ring |
| 14 | Towards cost of RCC Cover Slab |
| 15 | Towards labour charges for fixing meatl into the Pipe |
| 16 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 17 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 18 | ProvidingVertical Soakpit with Drainage @ Subam Nagar in Semmedu Pt |
| 19 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 20 | Filling Soak Pit with Following Materials |
| 21 | 225mm Boulder |
| 22 | 40mm Metal |
| 23 | 20mm Metal |
| 24 | Cost and supply of follwing 180mmPVC Pipes |
| 25 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 26 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 27 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 28 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 29 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 30 | Towards cost of RCC Ring |
| 31 | Towards cost of RCC Cover Slab |
| 32 | Towards labour charges for fixing meatl into the Pipe |
| 33 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 34 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 35 | ProvidingVertical Soakpit with Drainage @ Narikuravar Colony in Narasingarayanpettai |
| 36 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 37 | Filling Soak Pit with Following Materials |
| 38 | 225mm Boulder |
| 39 | 40mm Metal |
| 40 | 20mm Metal |
| 41 | Cost and supply of follwing 180mmPVC Pipes |
| 42 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 43 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 44 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 45 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 46 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 47 | Towards cost of RCC Ring |
| 48 | Towards cost of RCC Cover Slab |
| 49 | Towards labour charges for fixing meatl into the Pipe |
| 50 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 51 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 52 | ProvidingVertical Soakpit with Drainage @ Appampattu South Street in Konai Pt |
| 53 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 54 | Filling Soak Pit with Following Materials |
| 55 | 225mm Boulder |
| 56 | 40mm Metal |
| 57 | 20mm Metal |
| 58 | Cost and supply of follwing 180mmPVC Pipes |
| 59 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 60 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 61 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 62 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 63 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 64 | Towards cost of RCC Ring |
| 65 | Towards cost of RCC Cover Slab |
| 66 | Towards labour charges for fixing meatl into the Pipe |
| 67 | FixingofName Board includingcost, painting, Lettering, installation etc. |
| 68 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 69 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |